Prague 2004. Plant Data Kilns 2 x 1,300 tpd clinker  Vertical Coal Mill 15 tph  Cement Mills 3 x 100 tph + 1 x 30 tph  Own Quarries for Marl, Limestone.

Slides:



Advertisements
Similar presentations
THE CEMENT MANUFACTURING PROCESS
Advertisements

Environmental Impact of Coal- Fired Power Stations by Rob Glaser.
Florida Department of Environmental Protection David Read Cement Subproject Manager Bureau of Air Regulation Cement Mercury Subproject.
CAIR & MATS 2012 Southern Sectional AWMA Annual Meeting & Technical Conference September 12, 2012 Chris Goodman, P.E. Environmental Strategy.
Florida Department of Environmental Protection Mercury from Electric Utilities: Monitoring and Emission Reductions Greg DeAngelo & Tiffany Miesel Florida.
BEST PRACTICES & TECHNOLOGIES FOR ENERGY EFFICIENCY IN INDIAN CEMENT INDUSTRY.
A TEC’s Mjolnir mill: The future of alternative fuels preparation & burning By Pedro Montes de Oca and Jonathan Forinton.
© 2011 Hamworthy Combustion IED RELATING TO OIL AND GAS BURNERS FOR INDUSTRIAL USE Nigel Webley Group Technical Director Hamworthy Combustion Tel:
Cement plant 1.5 / 1.2 / 0.6 Mio TPA Brand NEW. World cement production 2012 Source: Wikipedia.
Basic Informations on Cement and Concrete. You might ask what the two pictures you can see here have in common and how they are related to our problem.
European Commission Enterprise and Industry GReening business through the Enterprise Europe Network Linking energy efficiency with environmental protection.
Green Manufacturing: Adopting Energy Efficiency in Manufacturing Supply Chains -Dangote Cement Strategy By Pabby Paramjit Director, Dangote Academy.
A Glimpses of Dhaka City About Holcim Holcim is one of the world ’ s largest suppliers of cement, aggregates and concrete. It has expand its business.
Cement 1.Production rose by 60% in the last 10 years 2.China: 44% of world production 3.Top 10 companies represent 55% of global capacity, but many very.
Current CDM experiences HeidelbergCement
Rotary presentation February 23th, Pueblo Plant Overview 89 Employees 54 $30.59/ hour average 35 $73,263/ year average 78% Hired.
CEMENT INDUSTRY GRUPO 5 PILAR DELICADO HERRERAS REBECA DIEZ MORALES
The Challenges and Successes of Creating an Environmentally Sustainable Cement Industry in East Africa Presented by: Kephar L Tande Chair, EA Cement Producers.
Practical use of newly developed BAT conclusions Valts Vilnītis.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
Florida Department of Environmental Protection Alvaro Linero, P.E. Administrator, Special Projects Bureau of Air Regulation Mercury Puzzle Hg(0), Hg(II),
2 Waste to Resource - Fluid Cracking Catalyst potential future alternative fuels and raw materials.
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
Cleaner Production Assessment (Chapter 4)
Proprietary work product, not for reproduction 1 BIOMASS GASIFIER 20 MW POWERPLANT Energy & Environmental Integrators Note! This system can be scaled from.
G.K.Pandey, Advisor, Ministry of Environment & Forests, (Govt. of India) S.K.Tyagi,Scientist, & B.Sengupta,Member Secretary Central Pollution Control Board,
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
UNFCCC Workshop, 9/ /1 2004, Dublin. September 30 – October 1, 2004, Dublin, Ireland Jiří Spitz ENVIROS, s. r. o. Czech Republic UNFCCC Workshop,
AIR QUALITY PLAN of REGIONE PIEMONTE abstract about heating of buildings Adriano Mussinatto REGIONE PIEMONTE DIREZIONE AMBIENTE Settore Risanamento Elettromagnetico,
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
6th African International Business and Management (AIBUMA) Conference 6 th African International Business and Management (AIBUMA) Conference 2015 Entrepreneurship,
Lecture Objectives: Finish boilers and furnaces Start with thermal storage systems.
Economic and Cross Media aspects Bo Jansson Swedish Environmental Protection Agency
Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.
Review of practice of ELVs and other conditions setting in EU member states for non-Annex I installations Valts Vilnītis.
Cost Effective Use of Heat Recovery Tony Cotton. Johnson Tiles Formed in 1901Formed in 1901 One of the UK’s largest tile manufacturersOne of the UK’s.
Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant.
SEA - National plan Electricity Supply Arend Kolhoff Netherlands Commission for EIA Jordan - September 2003.
Air Quality Governance in the ENPI East Countries Capacity building for decision makers for small businesses regulation Monika P ř ibylová.
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
Power plant permits Hans-Roland Lindgren Director Swedish EPA 1.
A SEMINAR ON PRACTICAL TRAINING AT SURATGARH SUPER THERMAL POWER STATION.
KOTA SUPER THERMAL POWER STATION ,KOTA
CECIL CONCRETE FACTORY
Facilitation of use of green transport - electromobility Ministry of Transport Ministry of environmental protection and regional development of the republic.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
CEMENT. CEMENT FACTS By 2030 global cement production is expected to reach 5 times the level it was in 1990 which would be approximately 5 billion tonnes.
A Glimpses of Dhaka City
The 13 th Northeast Asian Conference on Environmental Cooperation (20-22 December 2004, Seoul, Korea)
Coal-Fire Power Plants
REDUCTION OF NOx & SOx EMISSION WITH ALTERNATIVE FUEL UTILIZATION IN CEMENT INDUSTRY SOx NOx.
We provide tailor-made engineered solutions, products, spares and services. Founded as an engineering Company in 2005, headquartered in Gurgaon, India,
UNECE Convention on Long-range Transboundary Air Pollution
Indocement’s CDM Project
2018 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
2017 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
IEA Workshop Edinburgh, 12th November 2001 Kenneth Möllersten
Coal – security of coal supply considerations of EURACOAL
2017 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
USJE Integrated Environmental Permit Application
2018 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
Beni Suef Cement Company ”BSCC”
Beni Suef Cement Company ”BSCC”
2018 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
Beni Suef Cement Company ”BSCC”
Beni Suef Cement Company ”BSCC”
Beni Suef Cement Company ”BSCC”
Beni Suef Cement Company ”BSCC”
Beni Suef Cement Company ”BSCC”
2019 OUR ENVIRONMENTAL PERFORMANCE Alexandria Portland
Presentation transcript:

Prague 2004

Plant Data Kilns 2 x 1,300 tpd clinker  Vertical Coal Mill 15 tph  Cement Mills 3 x 100 tph + 1 x 30 tph  Own Quarries for Marl, Limestone and Sand  Reserves of Raw Materials: Approximately 30 Years for marl and limestone  Insulation Material Production Plant  RMC Plant  Number of Employees: 574

Location of “USJE” Located in the southeastern part of Skopje 3.5 km. from the center of the town Surrounded by civilian houses

The location of the factory brings up the: ENVIRONMENTAL QUESTION

The manufacturing of the cement influences the environment Excavation of the raw materials changes the landscape Transportation of the raw materials as a source of dust The production of clinker has the biggest impact on the environment –Big usage of energy –Air emissions ( dust, SO 2, NOx, CO…) Storage of clinker, grinding of clinker and packing of cement are also dust sources

technicaltechnological The environmental impact of the working processes of “USJE” has been mitigated through the technical and technological interventions

accomplished These improvements are accomplished through the years 1993 – Two concrete silos for clinker ( tones each ) with a closed belt conveyer and a complete dedusting system 1993 – Electrostatic precipitator for clinker cooler ( each kiln has it ) 1997 – Gasification of the boiler room for production of steam

1999 – Bag filters for cement mills 4, 5 & – Bag filter for rotary Kiln No – Vertical mill for petcoke, with bag filter and system for fire protection 2003 – Bag filter for rotary Kiln No – Puzzolana substituted by Fly Ash

Continuous Emissions Monitoring Installation of a network which connects all measuring instruments –Instruments for dust measurement installed on: Coal Mills Cement Mills Raw Mill Preparation Exhaust Gases –Instruments for measurement of SO 2, NOx, and flow installed on: Stack

August 2004 – integration of all “in – situ” signals in the network (company “SICK” has installed the software program “MEAC 2000”) ON – LINE regular reporting on a 30 min basis

Trial use of shredded tyres as an alternative fuel in rotary Kiln No. 4 Phase 1: Phase 1: Getting necessary permissions Phase 2: Phase 2: ACTION PLAN – Internal preparation of the plant Phase 3: Phase 3: Experimental testing: 15 th – 17 th September 2004 Phase 4: Phase 4: Results from the testing

Environmental Legislation Current Law in force –Limit values: SO 2 = 400 mg/Nm 3 ( mean 67,9-USJE ) NOx = 1300 mg/Nm 3 (mean 834,6-USJE) Dust = 50 mg/Nm 3 (mean 15,8-USJE) Proposed version that is in Parliamentary procedure adjusted to the EU Law

To comply with BAT Raw materials handling and storage –Pre-blending system –Excess clinker storage Fuel preparation –Bag filter for the horizontal coal mill Process –Process optimisation –NO x reduction

To comply with BAT Process (cont.) –Electricity use optimisation –ESP reconstruction or bag filters for cement mills –Bag filters for clinker coolers –Noise reduction EMS establishing –ISO 14000

Cost/Benefit Analysis for BAT compliance Estimated total Investment costs   (consultants estimation) Estimated Difference in Operation Costs   / year (consultants estimation) (Only SNCR increases operation costs)

Conclusion 1.Applying BAT will have an impact on the competitiveness of the company due to a long pay-back period 2.The impact can be minimised by allowing a reasonable number of years for successive investment