1 Testing activities in project INRIA 1B Evaluation 23 October 2003 César VIHO.

Slides:



Advertisements
Similar presentations
World Class Standards IMS Interoperability Testing - from Standards to Practice Giulio Maggiore ETSI TC INT Chairman © ETSI All rights reserved.
Advertisements

Halifax, 31 Oct – 3 Nov 2011Global Standards Collaboration ETSI ETSI Jørgen Friis, VP ETSI SES (Standards Enabling Services) Document No: GSC-16-PLEN-XX.
ETSIs Collaboration with Academia and Research communities RFID and Telecommunication Services WORKSHOP 25 May 2004, ETSI, Sophia Antipolis Livia Rosu.
Environmental Performance Verification
GMI 2006 Carrier-Driven Interoperability February 2006.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
P. Bellavista, A. Corradi, C. Stefanelli - ISADS'99 - Tokyo, 22 March A Secure and Open Mobile Agent (SOMA) Programming Environment Paolo Bellavista,
A Brief Introduction. Acknowledgements  The material in this tutorial is based in part on: Concurrency: State Models & Java Programming, by Jeff Magee.
Summary of ETSI/ESI activities Andrea Caccia ETSI/ESI TB member Note: This document expresses only the views of its author.
29 November rd ProActive and GCM User Group & ETSI TC GRID 1 ETSI TC GRID presented to 3rd ProActive and GCM User Group 29 November 2006 Sophia Antipolis.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
DEVS-Based Simulation Web Services for Net-Centric T&E Saurabh Mittal, Ph.D. Jose L. Risco-Martin*, Ph.D. Bernard P. Zeigler, Ph.D. Arizona Center for.
A State-based Programming Model and System for Wireless Sensor Networks Reporter : Zhi-Yuan Yang 2010/5/24.
GLOMAR  Aims - Provides adaptive consistency control for mobile enabled file systems  Abstracting consistency control into a component architecture 
Geneva, Switzerland, 4 December 2014 ITU-T Study Group 17 activities in the context of digital financial services and inclusion: Security and Identity.
Service-oriented architecture. The Basic main concepts –Service-orientation describes an architecture that uses loosely coupled services to support the.
Software Testing and QA Theory and Practice (Chapter 10: Test Generation from FSM Models) © Naik & Tripathy 1 Software Testing and Quality Assurance Theory.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
World Class Standards Update on NGN Standards ETSI TISPAN Sonia Compans ETSI Technical Officer February 2009.
Giandonato CAGGIANO ENISA MANAGEMENT BOARD REPRESENTATIVE LEGAL ADVISER ON EUROPEAN AFFAIRS OF THE MINISTRY OF COMMUNICATIONS U. OF ROMA TRE LAW FACULTY.
All rights reserved, Copyright(C) 2007, Yokogawa Electric Corporation and TAHI Project.1 International Perspective Testing Activity TAHI Project - IPv6.
ANVIL – A Rough Idea Martin Ford – ISLinkup (for GEOBASE + OGCE Team)
So just what is the Sedona Framework? –The Framework is an embedded device programming and control environment with two major facets –Open Source Free.
IP-Based Emergency Applications and Services for Next Generation Networks PEACE Presented by Suji Gunaratne PhD.
Division of IT Convergence Engineering Towards Unified Management A Common Approach for Telecommunication and Enterprise Usage Sung-Su Kim, Jae Yoon Chung,
World Class Standards CCIF New York - April Grids, Clouds and Service Infrastructures ETSI Strategy & New Initiatives.
Disaster Management eGov Initiative (DM) Program Overview December 2004.
Copyright © 2004 by The Web Services Interoperability Organization (WS-I). All Rights Reserved 1 Interoperability: Ensuring the Success of Web Services.
1 IPv6 and ETSI : some initiatives Interoperability service manager SEE MORE AT
Apartado Porto Codexwww.inescporto.pt tel (351) fax (351) /April/2005 Research Activities in 4G Networks at INESC Porto.
Securing IPv6 Ken Renard WareOnEarth Communications, Inc.
DOCUMENT #:GSC15-PLEN-51 FOR:Presentation SOURCE:ITU AGENDA ITEM:Plenary 6.10 Conformance and Interoperability Testing.
Copyright TAHI Project, All right reserved1 IPv6 Certificaion Program Hiroshi MIYATA TAHI Project/IPv6 Promotion Council Certification WG
1 UNIT –II Architecting Web Service. 2 Why SOA? – business point of view  Information Technology (IT) workers face many challenges, including: Limited.
UML 2 Models for ODP Engineering/Technology Viewpoints – An Experiment - Daisuke Hashimoto Hiroshi.
June 15, 2009GITB Open Meeting, Brussels1 GITB Alternative Architectures and Business Models CEN/ISSS eBIF Global eBusiness Interoperability Test Bed Methodologies.
Department of Electronic Engineering Challenges & Proposals INFSO Information Day e-Infrastructure Grid Initiatives 26/27 May.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Conformance and Interoperability Testing Jørgen Friis VP ETSI SES (Standards Enabling Services)
NGCWE Expert Group EU-ESA Experts Group's vision Prof. Juan Quemada NGCWE Expert Group IST Call 5 Preparatory Workshop on CWEs 13th.
Automatic Testing of Neighbor Discovery Protocol Based on FSM and TTCN Zhiliang Wang, Xia Yin, Haibin Wang, Jianping Wu Department of Computer Science.
Towards Interoperability Test Generation of Time Dependent Protocols: a Case Study Zhiliang Wang, Jianping Wu, Xia Yin Department of Computer Science Tsinghua.
Accreditation and Quality Labelling of EHRs in Europe The role of ProRec centres and the EUROREC Institute Dr. François MENNERAT Secretary General.
A Mediated Approach towards Web Service Choreography Michael Stollberg, Dumitru Roman, Juan Miguel Gomez DERI – Digital Enterprise Research Institute
LO-5: Testing Lecturer: Ricardo Gonçalves. 2 Testing Overview Conformance Testing –Definition –Methodologies –Application Architecture Interoperability.
Software Testing and Quality Assurance 1. What is the objectives of Software Testing?
Colombo, Sri Lanka, 7-10 April 2009 Need of Interoperability “within” an NGN – An approach Rajeshwar Dayal, Director Dept. of Telecommunications, India.
GRID ANATOMY Advanced Computing Concepts – Dr. Emmanuel Pilli.
TNA Mobility II By Henry N Jerez. TNA Principles Persistent Identification of all:  Network Components  Services  Users Functionality Abstraction 
1 MIP6-IETF63 Mobility for IPv6 [MIP6] Tuesday, August 2, Afternoon Session II & Afternoon Session III IETF63 Chair(s): Basavaraj.
SUNG Jongjin TTA, IT Testing Laboratory IPv6 Test and Certification in Korea.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
WS ►I Promoting Web services interoperability across platforms, applications and programming languages October, 2002.
© The InfoCitizen Consortium Project Presentation Agent based negotiation for inter- and intra-enterprise coordination employing a European Information.
ERM/MTS STF proposal on formal Phy measurement framework Friedbert Berens Vice Chair ERM TGUWB Presentation to ERM, July 2010.
Go4IT project MTS meeting October June 2006© Go4IT Proposed agenda Go4IT project presentation Report of IPv6 ready logo committee.
Chapter 8 Environments, Alternatives, and Decisions.
ETSI Test Specifications for IP-Based Protocols TTCN-3 User Conference May , Sophia Antipolis Anthony Wiles.
The Integrated Food Security Phase Classification in Sudan –Next Steps
Plan and Safeguard Service Package for SAP S/4HANA
Automated Interoperability Testing
Automated Interoperability Testing
Validation in INSPIRE Webinar on a new Test Registry & Repository 26/05/2015 Robin S. Smith & Michael Lutz.
Intelligent Transport Systems
Automated Interoperability Testing
Centre for Testing and Interoperability (CTI)
Charles KIM TTA Collaboration Plan for CJK NGN Charles KIM TTA
Towards Unified Management
Name of Speaker, Title and Organization
ETSI TC MTS WG TST introduction
Introduction of TC MTS - Methods for Testing and Specification
Presentation transcript:

1 Testing activities in project INRIA 1B Evaluation 23 October 2003 César VIHO

2 Why, how and who ? Interoperability is the final goal of any product developed in communicating systems area Bringing testing expertise into the existing design and development expertise to : Increase confidence on developed component Validate and improve the methodologies to be developed in both testing and design parts (i.e. “tests are used to test components and components are used to test the tests”)  Testing activities started in 2000 (one year after the creation Participants : C. Viho, R. Marie, L. Toutain, F. Dupont, D. Ros F. Roudaut, S. Barbin, F. Ngani, L. Tanguy, H. Leguen A. Minaburo, O. Medina, V. Phi

3 The context of testing activities Specifications/Standards Design and Development methodology B Implementation A vendor A Implementation B vendor B Conformance testing Interoperability testing

covers all steps of testing Generation of Abstract Test Suite (ATS) Compilation of ATS into Executable Test Suite (ETS) Execution of ETS against the Implementation Under Test (IUT) Test results Analysis Specification ATS ETS Verdict/log

5 Theoretical aspects and results (1) n Formal approach for :  Conformance and interoperability testing of communication networks and protocols,  Test selection and test coverage measurement n Models used :  IOLTS (Input-Output labeled transition systems)  Labeled Markov chains

6 Theoretical aspects and results (2) n Formal approach for interoperability testing : Definition and classification of interoperability testing architectures First formal definition of the notion of interoperability Formally proved answers to FAQs n Two solutions for distributed testing

7 IPv6 related testing n Test suites developed (both conformance and interoperability) : Core protocols (Neighbor Discovery, PMTU discovery, etc) Mobile IPv6 (Correspondent Node, Home Agent, Mobile Node) ID-13, ID-15, ID-18 and ID-19 Routing protocols (RIPng, OSPFv3) PPPv6 Transition Mechanisms (6to4, ISATAP, SIIT/NAT-PT) Header Compression mechanisms (ROHC)  Tight collaboration with the TAHI project in Japan

8 Organization of IPv6 interoperability testing events n In tight collaboration with the ETSI (European Telecommunication Standardization Institute) Plugtests TM Service n Test expertise provided for : The 4 IPv6 interoperability events organized by the ETSI (Sophia’2000, Cannes’2001 and 2002, Brussels’2003) Two Japanese TAHI IPv6 interoperability events (Yokohama’2002 and Chiba’2003)  project is now well-known and recognized as an expert group in IPv6 testing

9 The IPv6 certification programme “IPv6 Ready Logo” n A world-wide certification programme for IPv6 related products launched by the IPv6 Forum, ETSI and IRISA/Armor project n Based on interoperability testing results n IRISA/Armor is responsible of : The definition of technical requirements for the two phases of the programme The operational (applications examination and approval decision) for European applications  With our visibility today…

10 Next 4 years n Defining a formal framework and distributed approach for interoperability testing (continuing) Precise definition(s) of interoperability Test generation from formal specifications (Remote) testing platform and environment (using ISO/IS 9646, TTCN.v3 language) n Test generation for IPv6-related protocols and corresponding standardization and certification activities (continuing) n Towards Mobile Network Testing (gathering experience from MIPv6 testing) n Security testing combined with conformance and interoperability testing (test composition) n Test coverage (labeled Markov chains) T1T2T3 IUT1 IUT2IUT3