Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.

Slides:



Advertisements
Similar presentations
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Advertisements

Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
PIP- BOOSTER RF Tuner and Cavity Refurbishment 3/7/12 M. Slabaugh.
Proton Plan Director's Review 8/15/06 – Booster Corrector UpgradeDrennan1 Proton Plan Booster Corrector Upgrade Directors Review August 2006 Presenter:
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Refurbished Booster RF John Reid October 24, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
F Booster Long Straight Corrector Package Installation Craig Drennan 2007 Shutdown Planning Meeting April 6, 2007.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PAC Meeting, December 12, Prebys 1 The Problem.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
March 7 th Shutdown Shutdown Begins: Monday morning, March 7 th :00 Beam OFF Safety System Testing 08:00 Rack out KRSS, switch MI house power to.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
PETRA III, Status and Upgrade
Overview of LERF Status, Plans and Goals
Renovation of the 45-year old PS magnets
Alexander Herlert, CERN (PH-SME-IS)
Regular cryomodule maintenance plans (radiation damage, seals, etc)
Operations Department
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions and the Impact on Operations Ewan Paterson LCWS15 Meeting NOV 3, /24/2019.
Presentation transcript:

Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan

Booster Downtime Operators record machine downtime on D18. It is from this information we get our data, along with our own recording of information not found on D18, i.e. periods during a scheduled or unscheduled downtime period required by another machine. Booster access often requires A one hour cool down A rad tech to accompany the work crew to determine if additional measures are necessary. This is common for BRF work. Jobs are all entered into a worklist

Booster Downtime Over the Past Ten Years Hours

Data taken from D18

Summer Shutdown Average 1.7% downtime

Summer Shutdown

Average downtime 24 hours/month

Percentage of Booster Downtime Including Shutdowns Jan Nov 2010

Hours Average downtime 6.0 hours/month Summer Shutdown

Booster RF Voltage (KV/T) (one year time span)

Major BRF Repairs 12/19/09 – BRF19 vacuum leak, ceramic 06/08/10 – BRF3 vacuum leak, ceramic 08/01/10 – BRF1 rear tuner water leak 08/01/10 – BRF15 rear tuner water leak 08/01/10 – BRF18 front tuner water leak 08/18/10 – BRF5 sparking front tuner replaced

BRF19 Vacuum Leak

BRF19

BRF19 Cavity Failure – Dec 19, 2009 First cavity failure of this nature Vacuum leak - beam off, valves close, access, leak check Remove cavity from beam line Insert spool piece, pump down, leak check Rep rate reduced to preserve remaining cavities 10.5 hours of downtime Cavity repair requires written ALARA procedure, and supervision of a radiation tech when any work is performed After repair transport cavity to MI60 for testing Cavity re-installed April 13, hours of downtime for re-installation ALARA total for BRF19 cavity repair mrem Two months later…

BRF3 Vacuum Leak

BRF3

BRF3 Cavity Failure – June 8, 2010 All the same steps as previously mentioned for BRF19 were performed 14.5 hours of downtime Repaired and installed cavity on August 6 during the summer shutdown ALARA total for BRF3 cavity repair mrem

BRF3 ceramic

BRF5 Front Tuner August 16, 2010 BRF5 tuner starting sparking, unable to run the cavity. Removed front tuner from the cavity and the tunnel Aug. 18 th Required a special lift fixture from MI60 to remove the tuner.

BRF5

BRF5 Tuner

BRF5 tuner stem connection

BRF Tuner Water Leaks Prior to the 2010 summer shutdown we had three BRF cavity tuners (BRF1, BRF15, BRF18) leaking water and an LCW valve. Although the majority of the water was leaking from BRF18 tuner. This accounted for losing ~175 gallons of LCW per day for three months. If we decided not to run in this manner the Booster intensity would have had to be reduced. During the summer shutdown the three tuners were repaired or replaced along with the LCW valve.

Reducing Booster Downtime Tunnel components Replace existing plastic water tubing with more radiation hardened materials PEEK or Kynar Install components away from the beam line when possible, improving their lifetime Use improved vacuum seals to reduce vacuum leaks Newer corrector supplies improved reliability Power supplies and controllers much more reliable More readily available spares Proactive with maintenance Regular maintenance on equipment

Summary Booster has only 1.7 percent down time for Much of this is due to the hard work of people that work on and support the Booster. Assure we have enough spare gradient magnets to support future operations. 75% of Booster downtime is due to BRF To maintain present throughput Booster RF needs to remain running consistently. We need an ambitious program to replace or upgrade the present BRF cavities which includes going to all solid state power supplies.

End Slide

Booster 95 LCW Make-up January – July, 2010 Gal

Repairs to Booster Components Requiring ALARA 04/08 Replace MP mrem 03/09 Period 6 vacuum leak mrem 01/10 BRF19 vacuum repair mrem 06/10 BRF3 vacuum repair mrem

Summer Shutdown

Hours of Booster Downtime Including Shutdowns Jan Nov 2010 Total Hours = 239