Instrumented Launch Support Retain the Big Crow Aircraft Andy Roberts 4/xx/08.

Slides:



Advertisements
Similar presentations
L3 Communications.
Advertisements

Service Provider Support of Audit Readiness Office of the Under Secretary of Defense (Comptroller) March 14, 2011.
MAJOR REPAIRS AND ALTERATIONS
MILITARY AIRCRAFT SYSTEMS
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
4/30/ AIAA Delta Forum AIAA Engineering & Technology Management Maintaining Competitiveness with R&D Activity More Modernization Needed, Fewer Dollars.
ARINC Overview Alliance Baltimore November 16, 2007.
Presented January 20, 2011 by: John Allen Director, Flight Standards Service (AFS-1) Federal Aviation Administration Public Aircraft Operations Forum.
The Canadian Federal Pilots Association Presentation to Conciliation Board Ottawa, ON - May 30 - June 2, 2002.
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
Visual 7.1 Demobilization, Transfer of Command, and Closeout Army Delivery Unit 7: Demobilization, Transfer of Command, and Closeout.
Coping with Electronic Records Setting Standards for Private Sector E-records Retention.
AIR ACCIDENT PREVENTION Presented by Rex Hamza Aviation Safety Inspector-Guyana Civil Aviation Authority.
AT 209 Introduction to Civil Unmanned Aerial Systems (UAS)
Disaster Communications System (DCS) Overview for State and Local Governments National Conference on Emergency Communications (NCEC) Panel 5: State and.
AMR Proprietary and Confidential FAA Compliance Training.
Quality Assurance/Quality Control Policy
Aerospace Engineering By Patrick Ferrell. Aerospace Engineering is the main branch of engineering concerned with the research, design, development, construction,
TopicHouseSenate AH-64 TransferDuring FY15 the SECDEF and SECARMY may not: Transfer AH-64s from the ARNG to the Active Army None of the funds authorized.
SUAS Laboratory – Python Effort
…dedicated to the design, manufacturing, integration and support of lightweight flight safety equipment and services. Our goal is to provide the Best-in-Class.
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
U.S./Europe International Aviation Safety Conference By: Date: “Global Aviation Safety Processes: Refining Reinforcing, and Streamlining” Federal Aviation.
The Maintenance and Engineering Organization
Federal Aviation Administration
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Office of Aviation Safety Customs and Border Protection Predator B Accident Nogales, Arizona April 25, 2006.
E-RETAP A Pollution Prevention Information Exchange System and Data Management System Robert Jackson Pollution Prevention Program Michigan Dept. of Environment.
Honeywell Proprietary Honeywell.com  0 Document control number Honeywell Technology Solutions Inc. Overview November 2007.
FAA INSPECTION AUTHORIZATION
2011 NPMA Conference Series III National Capital Area Conference Leaders in Asset Management National Capitol Area Conference Charles L. Robinson, Director.
5/26/20161 AUDIT SERVICES PRIVATE/CORPORATE Captain Iain Tulloch tel /
10/31/06 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Unmanned Aircraft Systems in Civil Aviation.
Federal Aviation Administration Maintenance "Personal Minimums" Federal Aviation Administration DOT/FAA.
Maintenance "Personal Minimums"
CD NH WING CD MEMBER TRAINING objectives General Program and Procedures Operations Training and Eval Equipment Forms.
Logistics Workforce Categories  Ms. Vicki L. Harris  DRC Contractor  Force Management and Organization Division  (A4RF)
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
Personnel Requirements for Implementing the New Triad Robert B. Barker December 15, 2005.
Information requested following SMS implementation presentation.
Page 1 Vision Service Partnership U.S. Department of Energy’s Aerial Measuring System (AMS) Response Mission Provide a rapid and comprehensive worldwide.
03/11/021 Spaceport Vision Team Members. 03/11/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance.
Cargo Strategic Action Plan Prepared by: Cargo Strategic Action Group Air Carrier Maintenance Branch, AFS-330.
1 An Introduction to Lake Central Air Service Our Past, The Present and What We Can Do For You LCAS.
Aerospace engineering
DOD Sponsored Area Frequency Coordinators
FAA sUAS ARC Support Documentation © ASTM International. All Rights Reserved. The Unmanned Aircraft System Initiative F38 on Unmanned Aircraft Systems.
Office of Space Flight Spaceport and Range Technology Development Initiative Al Sofge NASA Headquarters May 15, 2001.
Next Generation Air Transportation System Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005 Robert A. Pearce.
Targets Office of Secretary of Defense Director of Operational Test and Evaluation Office of Deputy Director for Land Warfare Target Systems Office - Dennis.
UNCLASSIFIED / FOR OFFICIAL USE ONLY USAFMCOM UNCLASSIFIED / FOR OFFICIAL USE ONLY.
1 DFRC SUAS Program Operations and Risk Management Approach for Small UAS Presented to the Certification Working Group 6/26/2008 Brad Flick/DFRC Chief.
03/20/021 Spaceport Vision Team Members Organizations that contributed: Air Force NASA NCSS FAA Industry University Etc.
High Fidelity Simulation as a Route to Certification Autonomous Systems: Legal / Regulatory Aspects and V&V Workshop 22 nd February 2016 Dr. M. Jump.
Aircraft Fleet Management Solutions
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Action/Initiative Date Action Initiated: December 2003 Status: On-Going Government and Industry Forum consisting of all military services, weapons system.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
The Future of the Communications Program Mr. Malcolm Kyser HQ CAP/DOK Civil Air Patrol CITIZENS SERVING COMMUNITIES.
Aircraft Disposal Overview
Planning for Succession
2016 Maintenance Innovation Challenge
AIRLINE TRANSPORTATION AERO 4100 / 5100
Air Carrier Continuing Analysis and Surveillance System (CASS)
BLM OR & WA State Office, USFS Regional Offices 6 & 10 (SORO) Interagency Fire, Fuels, and Aviation Management Program Updated: February 2018.
TEAM NAME. TEAM NAME Additive Manufacturing Business Model Workshop Day 2 Outbrief 31 May 2018.
Life Cycle Logistics Perspective KC-46 Product Support
Workshop Session I.
Future Airborne Capability Environment (FACE™) Support
Aerodrome Certification Workshop
Presentation transcript:

Instrumented Launch Support Retain the Big Crow Aircraft Andy Roberts 4/xx/08

Purpose Retain a unique “National Asset” program and ensure uninterrupted availability to a diverse customer base.

What is Big Crow? The nations most versatile, agile, quick reaction, Research Test and Evaluation (RDT&E), Training and operational capability Mission Capabilities – Electromagnetic environments Electromagnetic vulnerability assessments Science Research, test and evaluation Training – Worldwide deployable mobile instrumented test and training range Telemetry Instrumented radar Electro-optics Electronic attack / electronic support Assets – Intellectual capital – Reconfigurable NKC-135 aircraft electronic platforms – Mobile ground platforms – Instrumentation & related equipment – Myriad of other aircraft via air services

Mobile Instrumented Test and Training Range

Training Exercise Support

Big Crow Air Services Variety of fixed and rotary wing aircraft available – Gulfstream, Lear, Cessna aircraft – Fighters such as A-4s and F-16s – Helicopters including the Bell 412 Capable of integrating equipment onto military aircraft – UH-60 – UH-1 – C-12 – Many others Ultra Light Lear Lighter than Air Ship (Blimp) NASA ER?

Big Crow Ground Systems Ground based telemetry – Mass data store – SATCOM relay – Remote command, control destruct RCC Communications – SATCOM – Relay Data Link – Vulnerability Assessment

Background Big Crow represents DoD’s consolidation from nine large-scale aircraft down to the two NKC-135’s: –3 Navy King Crow EW –1 Air Force ARGUS EO/IR –3 Air Force telemetry –1 Air Force SATCOM –1 MDA DC10 Consolidation resulted in Big Crow assuming new missions: –Navy ship qualification test –AF cruise missile chase test –MDA’s Airborne Laser (ABL) target board –Link and Communication testing

Problem DoD’s most capable, RDT&E, Training, and capability will be lost in FY08/09 – Why a crisis now? Air Force will retire Big Crow NKC-135s to avoid excessive military maintenance costs (Program Depot Maintenance Cost (PDM))

How did we get here? No Air Force aircraft funding; AF Fleet board decision 6 June 2006 to terminate Big Crow aircraft when PDM’s come due Air Force is excessing fleet KC-135E/B’s and won’t support Big Crow NKC-135E/B aircraft OSD AT&L decision to transfer Big Crow aircraft and program to OSD Last minute (December 07) legal determination, OSD AT&L is a policy organization; it cannot own assets

How did we get here? OSD AT&L strongly supports Big Crow and is actively seeking a solution to retain Big Crow; however time is running out – Short term solution (less than 2 years) — find a “holding” agent that can take the Big Crow aircraft and convert the operation and maintenance (O&M) plan to a much more affordable commercial O&M plan – Long term (2 years and out) — Big Crow becomes a field operating activity under OSD with authorities to operate under commercial O&M paradigm

Big Crow Maintenance Problem – Program Depot Maintenance (USAF Requirement) due with no funding available – Air Force Maintainers are being reassigned – Big Crow Program Office does not have the ability to grant its self an Airworthiness Certification

Big Crow Maintenance Solution – Set-up a Maintenance Program which incorporates both requirements of the FAA and NASA aircraft maintenance (Bridging of Maintenance Actions) Use all aircraft maintenance documentation available to generate a Low Utilization Maintenance Program (LUMP) Write a comprehensive inspection program (“C” check) that will cover the structural requirements of the Air Force PDM in a cost effect manner (This would suffice as the NASA Acceptance Inspection) Formulate a plan to comply with all open TCTOs Ensure that an active Corrosion Prevention Control Program (CPCP) is in place – Have a General Maintenance Manual (GMM) that will cover all aspects of the Big Crow Aircraft Maintenance Program Ensure that all inspections are covered (Bridging) Ensure that a functional Maintenance tracking system is in place Ensure that a real time Logistics Inventory system is in place

Big Crow Maintenance Big Crow Aircraft – Low hours – Total Flight Hours 30,626 – Last PDM August 2003 – Time since last PDM 1, – Total Flight Hours 11,058 – Last PDM June 2004 – Time since last PDM 1,030

Big Crow Maintenance Big Crow Aircraft – Clean Aircraft No major maintenance concerns Minimal number of Time Compliance Technical Orders (TCTO) open No major damage noted to aircraft structure No corrosion concerns noted on either aircraft Aircraft records reviewed noted no areas of concern

Maintenance, Engineering & Logistics Recommend NASA – Oversee the Bridging of the Aircraft Maintenance Program from Air Force to a more cost effective maintenance model – Provide Airworthiness and Flight Safety Review Board (AFSRB) approval – Bring Big Crow Aircraft Maintenance and Logistics Tracking under the NASA Aircraft Maintenance Information System (NAMIS)

Maintenance, Engineering & Logistics Recommend NASA – Approve an Airworthiness Certificate for the Big Crow NKC-135 Aircraft

Maintenance, Engineering & Logistics Recommend NASA – Provide Aviation Oversight to the Big Crow Program Participate in Preliminary Design Review Boards Participate in Critical Design Review boards Participate in Flight Readiness Review Boards – Provide oversight to the Maintenance program in the form of a Independent Quality Assurance Inspector