1 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Configuration Management Activities, Including Margin Management David Hembree INPO June.

Slides:



Advertisements
Similar presentations
CM HOW-TO GENERAL OVERVIEW AND DELTAS FROM E2. OBJECTIVE u Upon completion of this training you will demonstrate an understanding of major differences.
Advertisements

INPO Update Configuration Management CMBG Meeting
INPO Update CMBG Meeting June 2013
Ensure Vendor/Engineer of Choice Product Quality
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Groundwater Protection Initiative Status George Oliver RETS/REMP Conference June 25-27, 2007.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
SAFETY & QUALITY MANAGEMENT IMPROVE SAFETY WITH QUALITY & PRODUCTIVITY BENEFITS Dave Copley, Matt Pierce.
Cumulative Impacts James Slider November 7, 2013.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
Industry Nuclear Safety Culture* Process Thomas C. Houghton Director, Safety Focused Regulation Nuclear Energy Institute March 12, 2009 *Nuclear Safety.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
1 CMBG 2009 PSEG Nuclear Vendor Technical Document Program Deficiencies, Successes, and Cost Savings Presented By: Paul Davis PSEG Nuclear, Engineering.
Page 1 Evaluation Improvement Initiative A New Evaluation Approach 0616 CMBG Discussion on Revised Evaluation Approach.PPT Institute of Nuclear Power Operations.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
Page 1 Evaluation Improvement Initiative A New Evaluation Approach 0616 CMBG Discussion on Revised Evaluation Approach.PPT Institute of Nuclear Power Operations.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
INPO Update Operational Excellence Outcomes and Configuration Management Glenn J. Neises, INPO Sr. Evaluator June 2004 CMBG Glenn J. Neises, INPO Sr. Evaluator.
10th Configuration Management Benchmarking Conference June 15-18, 2003 Hershey, PA 2003 CONFERENCE " A Decade of Sharing" NEI Business Update Presented.
ANSI/NIRMA Standard CM 1.0 Status Update
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
REGULATORY PERSPECTIVE ON USING OPERATIONAL EXPERIENCE Thomas E. Murley Former Director of Nuclear Reactor Regulation USNRC Conference on Improving Nuclear.
ISM Annual Review and Declaration Lessons Learned CH2M HILL Hanford Group John McDonald.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Ontario Region Safe Water Operations Program (SWOP) Presentation on March 10, 2010 Niagara Falls, Ontario INAC Ontario Region.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
2010 CMBG Conference Temporary Design Changes Tony Hathcock Duke Energy - Oconee June , 2010 Charlotte, NC.
2007 CMBG Conference Sam Melton Progress Energy June 19, 2007 Charleston, SC Configuration Management Principles And Practices for New Nuclear Plants.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
Evaluating Configuration Management
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
The Changing Power Grid – NPP Flexible Plant Operations Sherry Bernhoft EPRI, Program Manager July 29, 2014.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
ANSI/NIRMA Standard CM 1.0 Status Update CMBG Conference 2016 West Palm Beach Gardens FL June 6, 2016.
Pilot Component Design Basis Inspection (CDBI) and Equipment Qualification (EQ) Program Inspection Feedback CONFIGURATION MANAGEMENT BENCHMARKING GROUP.
Fukushima Flooding Task Force Jim Riley April 5, 2012.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Standard Design Process Overview
Industry Standard CM Indicators Mike Hayes Exelon Nuclear CM SME CMBG Steering Committee.
Delivering the Nuclear Promise Overview
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
Design Oversight Working Group (DOWG) – Next Steps
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
Utility Corporate Performance
Industry Guidance on Part 21 Evaluation and Reporting
Flooding Walkdown Guidance
NRC CM Pilot Inspections Methodology and Results
NRC Cyber Security Regulatory Overview
Fix it or Forget it? Dealing with Troubled Projects
Using CM to Maintain the Design Basis
State of Configuration Management
INPO Configuration Management Activities
Thomas Koshy, On Behalf of Brian Thomas, Director
Margin Management Configuration Management Benchmarking Group
Design Oversight Working Group (DOWG) Status Update
Jim Powers - Director, Fleet Engineering
Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee April 9, 2019 Cleveland 2005.
Vendor Technical Information
Break Out 1: CM of Digital Equipment
Presentation transcript:

1 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Configuration Management Activities, Including Margin Management David Hembree INPO June 30, 2009

2 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations INPO CM Focus Areas Plant-specific issues Including issues with product quality (e.g., design changes, technical evaluations), configuration control, reactor engineering, and engineering leadership. Causes often involve engineering fundamentals. Industry issues –Margin management –Nuclear fuel performance (including channel distortion) –Transformer/switchyard/grid issues –Gas accumulation –Digital modifications (under development) –Cable condition (under development)

3 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Margin Management Ongoing department focus area –Fundamental to plant safety –Key cause of long-term shutdowns –Average of five AFIs per year –Some are executive summary issues 2008/9 activities –Exelon procedure posted as Nuclear Exchange –Good practice published in early 2009 discusses elements of comprehensive process Feedback/suggestions for future action?? Deborah Williams Mayo Oppenhimer

4 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Margin Management Extensive efforts at some plants to reconstitute design basis, upgrade calculations, and quantify/improve margins –Kewaunee –Point Beach –Others –Other Margin Efforts –Byron -- Operations questions engineers on amount of margin when making operability decisions Deborah Williams Mayo Oppenhimer

5 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Margin Management Signs of decline in focus on margin management at many plants Procedure in place, but little ongoing action to implement Action plans established but plans lack interim dates and are not closely tracked Margin lists only updated once every two years (just before INPO comes) Engineers identify design margin issues, but operations and maintenance not engaged to identify operating margin concerns Deborah Williams Mayo Oppenhimer

6 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Engineering Fundamentals Engineering management effectiveness –Exec summary issue for several evaluations Fundamentals at individual level –Knowledge/skill –Knowledge worker human performance –Advocacy and technical conscience Carl Faller

7 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Nuclear Fuel Integrity Industry goal of zero failures by 2010 Review visits to all sites Evaluation team review/follow-up Fuel vendor assist visits Currently, about 88 percent w/o failures Greatest challenges: –Grid-to-rod fretting (particularly at B&W and CE NSSS plants) –Debris-related failures –“Surprise” failures Scott Hawn Bob Burnham Jim Doxsey

8 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Transformer/Switchyard/Grid Continuing concern as event initiator; affects reliability of offsite power Evaluation activities Review visits completed at all sites Several follow-up visits in 2009 Evaluation teams looking at switchyard PMs and transformer lifecycle management Guideline recently issued; plan to request utility self-assessment Engaging CEOs and CNOs to help improve nuclear/transmission alignment Shawn Simon Wes Frewin Julio Gomez

9 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Gas Intrusion Ongoing events affecting important systems SER 2-05 revised in early 2008; NRC generic letter issued Supporting industry efforts to address issues –working with industry to develop training materials Evaluation teams looking into gas intrusion situations and site corrective actions Carl Faller

10 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Other Activities Engineering project management; vendor oversight Developing new engineers Digital issues and cyber security Cable monitoring Julio Gomez Doug Kinsman Mayo Oppenhimer Wes Frewin Deborah Williams David Shen

11 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Meetings and Seminars Technical working meetings Transformer/switchyard/grid (May 19-20) Engineering human performance (at Palo Verde-July 21-23) Engineering as technical conscience (at Exelon-July 27-29) Digital upgrade (at Southern Nuclear-Sept 9-10) PWR/BWR Reactor engineering (Dec 8-10) General working meetings Engineering Managers forum (at FP&L-March 2-3) Design engineering managers (June 2-3) System engineering managers (June 3-4) Program engineering managers (Aug 5-6) Training/development New engineering manager seminar (June 9-11) New engineering directors seminar (Sept 22-24)