2007 CMBG Conference Sam Melton Progress Energy June 19, 2007 Charleston, SC Configuration Management Principles And Practices for New Nuclear Plants.

Similar presentations


Presentation on theme: "2007 CMBG Conference Sam Melton Progress Energy June 19, 2007 Charleston, SC Configuration Management Principles And Practices for New Nuclear Plants."— Presentation transcript:

1 2007 CMBG Conference Sam Melton Progress Energy June 19, 2007 Charleston, SC Configuration Management Principles And Practices for New Nuclear Plants

2 2007 CMBG Conference Principles and Practices for NPP CM Nuclear Renaissance is on the horizon –Many corporate owners of existing nuclear plants are considering new plant construction –NRC has received numerous early site license applications and expects to receive combined Construction and Operating License (COL) applications as early as this year. –NuStart, Dominion, TVA consortia –STP, Progress Energy, Constellation, Entergy, Duke, SCANA, Southern and others have announced plans

3 2007 CMBG Conference Principles and Practices for NPP CM Configuration Management has already begun –NRC has certified design for ABWR, AP600, System 80+, AP1000 –NRC is evaluating ESBWR –Additional designs in development that expect to apply for certification –Certified designs establish design requirements and create information

4 2007 CMBG Conference Principles and Practices for NPP CM Configuration Management professional involvement –Opportunity for influence –Capture Lessons Learned, don’t repeat the mistakes of the past –Establish paradigms This isn’t a chance to do it over right, this is a chance to figure out what “right” is.

5 2007 CMBG Conference Principles and Practices for NPP CM Configuration Management Pre commercial operation Engineering Design Documentation Requirements Procurement, Construction And Startup Facility Configuration Information Facility Configuration Information Design Requirements Physical Configuration

6 2007 CMBG Conference Principles and Practices for NPP CM CMBG Involvement –2006 presentation and breakout, focused on what lessons should be learned –CDSV CM Committee reported on plan to write paper –CMBG Steering Committee approved plan to present paper at this conference –CDSV is an interface organization for Progress Energy (ex CP&L), Duke, SCANA, and Dominion Power (ex Virginia Power)

7 2007 CMBG Conference Principles and Practices for NPP CM CDSV Paper Development –Working meeting February 2007, with participation from INPO –Initial draft, April 2007 –INPO visits to GE, AREVA with CDSV participation –Final draft reviewed at this conference INPO involvement –Proposed addendum to AP-929 –Used draft CDSV paper as starting point

8 2007 CMBG Conference Principles and Practices for NPP CM Issues of concern –Standard design maintenance constraints –Intellectual property protection –Human Factors design constraints (NUREG 0711 Revision 2) –Electronic media, 3D Modeling, “just-in-time” drawings

9 2007 CMBG Conference Principles and Practices for NPP CM Outline –Objective –Introduction –Assumptions –Developing a CM Transition Plan –Design Authority Roles and Responsibilities –Design Control Principles –Principles for Selection of Information about SSCs –Principles for Presentation of Information about SSCs

10 2007 CMBG Conference Principles and Practices for NPP CM What’s this good for? –Intrusive involvement in contract development and content –Developing assessment and oversight tools –Reviewing processes and procedures What’s next? –INPO AP 929 revision to incorporate addendum - identify commenters –CDSV product may be made available after final approval as desired

11 2007 CMBG Conference Principles and Practices for NPP CM Questions or Comments?