Return to Compliance, The Long and Winding Road Michael Murray Associate Engineer Deon Carrico Source Control Inspector II Orange County Sanitation District.

Slides:



Advertisements
Similar presentations
WDEQ Sanitary Sewer Overflow Reporting Kevin M. Wells Natural Resource Program Manager WDEQ/WQD Herschler Building, 4 West 122 West 25 th Street Cheyenne,
Advertisements

Industrial User Inspections EPA Region 9, Clean Water Act Compliance Office CWEA 39 th February 29, 2012 Huntington Beach Greg V. Arthur US EPA (WTR-7),
ALABAMA STORMWATER The Problem and How ALDOT Has Corrected It.
USING YOUR COMPUTER AS AN ENFORCEMENT TOOL Gathering Evidence & Preparing Your Case Heather Tanner, CHMM Environmental Specialist.
 Site Assessment and Mitigation Program Department of Environmental Health – County of San Diego.
Changes to HIPAA (as they pertain to records management) Health Information Technology for Economic Clinical Health Act (HITECH) – federal regulation included.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
25th Annual U.S. EPA Region VI Pretreatment Association Workshop Liquid Waste Transporter Enforcement Stories August 5, 2009 Ms. Erin La Rue Pretreatment.
The Clean Water Act Objective: To restore and maintain the chemical, physical, and biological integrity of the nation’s waters PHOTO OF 2007 OUTFALL AT.
Welcome “Sewers – The Key to Hauppauge Revitalization: The Next Economic Boom ” 1 June 23, 2010.
Environmental Monitoring & Protection Unit
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
EPCRA Emergency Planning and Community Right-to-Know Suzanne Powers
Oregon State Department of EnergyConference Daniel Duncan, EPA Region 10 PCB Program Manager November 5, 2003.
MAINTAINING WATER QUALITY CITY OF TULSA PERMIT ENFORCEMENT.
Ron DeJuliis, Commissioner of Labor and Industry Rob McGeeney, Program Manager Larry Kreseski, Chief inspector Department of Labor, Licensing, and Regulation.
1 Statewide General Waste Discharge Requirements for Sanitary Sewer Systems BACWA.
NPDES Primer for Executive Officers of Wastewater Facilities Indiana Department of Environmental Management Office of Water Quality Compliance Branch.
2015 NCMA EPA Enforcement Policies and How They Affect Your Facility Michael Pjetraj, P.E. DAQ Stationary Source Compliance Branch Supervisor.
How to Implement the CalARP Program
CALIFORNIA DEPARTMENT OF EDUCATION Tom Torlakson, State Superintendent of Public Instruction Uniform Complaint Procedures Monitoring Requirements Training.
Special Education Accountability Reviews Let’s put the pieces together March 25, 2015.
Inspection Records and Reports NC DWR, Raleigh Regional Office 3800 Barrett Drive Raleigh NC (919)
DEBRA A. SCHUCHERT DIRECTOR OF NETWORK OPERATIONS & COMPLIANCE CLAIMS BILLING & ADJUDICATION TRAINING
Industrial Inspections Making Good Inspections Better David Long EPA Region 6.
© 2009 The McGraw-Hill Companies, Inc. All rights reserved. 1 McGraw-Hill Chapter 5 HIPAA Enforcement HIPAA for Allied Health Careers.
■ This Training Module is designed to educate Management on FMCSA Compliance Review (CR).
Environmental Compliance Assistance Workshop for Colleges and Universities September 13-14, 2005 Chapel Hill, NC.
February 2007 Commercial Vehicle Drivers Hours of Service Module 24: Daily Log Audits.
Where to find Information About Facilities. Overview of Title V Permits.
Enforcement Overview Melissa Cordell, P.G. Enforcement Division Office of Compliance and Enforcement Texas Commission on Environmental Quality Environmental.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
New York State Health Homes Implementation and Billing Update Statewide Webinar Presented by: New York State Department of Health January 12,
Notices to Comply (NTC) and Notices of Violation (NOV) March 22, 2006 Peter Moore Yorke Engineering, LLC x24
CONSIDERATION OF STREAMLINED PROCESS FOR STIPULATED WASTE TIRE HAULER AND WASTE TIRE FACILTY ADMINISTRATIVE PENALTY CASES CIWMB Board Meeting Agenda Item.
MINIMUM CRITERIA Project Manager Marianne Lindström, Bulgaria SYKE, Expert Services, Environmental Management Division.
Joseph G. Maternowski Moss & Barnett, P.A. Minnesota Environmental Institute April 21, 2011 Minneapolis, Minnesota.
Overview of Civil Judicial Enforcement. Civil Judicial Enforcement  Who may file civil judicial environmental enforcement actions in U.S.? Federal Government.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
Title V: The Big Picture
Moveable Equipment Inventory Brown Bag February 11, 2009 Bob Marchitto Manager, Moveable Equipment Inventory ,
1 Enforcement Options and Case Studies Lisa Brown Assistant Counsel for Enforcement Cal/EPA CUPA/UST Conference February 8, 2006 February 8, 2006.
Reimbursement Statements What you need to know. Let’s Take a Closer Look… …at invoicing, cost ledgers, SB and budget revisions.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Significant Provisions Of S MINERS ACT Significant Provisions Of S MINERS ACT Pertaining to Enforcement of all M/NM Mines. New ombudsman within the Office.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
Oregon Administrative Sanctions for Violations of Liquor Laws Linda Ignowski Oregon Liquor Control Commission October 2008.
+ Onsite Sewage Systems Wastewater Management VACO Community Development and Planning Steering Committee November 13, 2011.
OSHA – What to Expect When You’re Inspected (Following Federal Guidelines)
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Enforcement What to Expect From the Water Boards, and What to Look for Locally ENTS Workshop August Mark Bradley Office of Enforcement CA State.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
© 2005 Powell Goldstein LLP. All rights reserved. Practical Pointers for Using EPA’s Audit Policy Matthew Mattila
IDEA FORMAL COMPLAINTS Administrative Accountability Branch Kentucky Department of Education Understanding the Self-Investigation Process.
Prevention not Intervention Developing a Sound Response to Erosion and Sediment Control Problems through the Planning Process.
Conservation Development and Planning Department Code Compliance Flow Chart for County Code (Zoning & Land Use) Violations COMPLAINT RESEARCH AND PRIORITIZE.
Miners Rights Rights & Responsibilities Under the Mine Safety & Health Act of 1977 NC DOL Mine & Quarry Bureau Mine Safety & Health Training Revised 2010.
Enforcement Overview Melissa Cordell, P.G. Enforcement Division Office of Compliance and Enforcement Texas Commission on Environmental Quality Environmental.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
P.O.S.T. SANCTIONING and HEARING PROCESS. Timeline MUST REPORT WITHIN15 DAYS FROM THE DATE OF INFRACTION OR DISCIPLINARY ACTION.
NAPA COUNTY Conservation Development and Planning Department Code Compliance Flow Chart Building Code Violations 1 COMPLAINT Written complaint (form, letter,
Department of Child Support Services OFFICE OF AUDITS AND COMPLIANCE.
Department of Buildings
Annual Inspection Certification Program
Tuscarawas County Health Department Operation Permit
Environmental Management Information System (EMIS2)
Background First ERP written in 1991 Revised in 1998
Enforcing the NAAQS Case Study Sean Taylor
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Presentation transcript:

Return to Compliance, The Long and Winding Road Michael Murray Associate Engineer Deon Carrico Source Control Inspector II Orange County Sanitation District (OCSD) February 2004

OCSD’s Permitting and Enforcement Program  The OCSD currently has 404 Class I Wastewater Discharge Permits issued to industries in the County  By definition, a Class I permit is issued when:  A Company’s business operations are federally (EPA) regulated; i.e. Metal Finishing (40 CFR 433) Or:  A company is discharging 25,000 gallons or more a day of industrial wastewater, and/or has pollutants of concern in their wastewater; in this case, a local limit, or CSDOC permit is issued  The OCSD currently has 404 Class I Wastewater Discharge Permits issued to industries in the County  By definition, a Class I permit is issued when:  A Company’s business operations are federally (EPA) regulated; i.e. Metal Finishing (40 CFR 433) Or:  A company is discharging 25,000 gallons or more a day of industrial wastewater, and/or has pollutants of concern in their wastewater; in this case, a local limit, or CSDOC permit is issued

Permits  Out of 404 Class I permits, 222 are issued to industries with Metal Finishing or Electro Plating operations

Sampling  At a minimum, with a Metal Finishing or Electroplating permit, the OCSD inspects and samples the industry for heavy metals on a quarterly basis  The industry is also tasked with conducting self-monitoring for heavy metals quarterly  At a minimum, with a Metal Finishing or Electroplating permit, the OCSD inspects and samples the industry for heavy metals on a quarterly basis  The industry is also tasked with conducting self-monitoring for heavy metals quarterly

Enforcement  An enforcement program begins for an industry when they incur a violation, either by the OCSD’s sampling or their own self-monitoring  A Notice of Violation letter is mailed, and directs either OCSD or the industry to resample their industrial wastewater within 30 days of the date of the letter  An enforcement program begins for an industry when they incur a violation, either by the OCSD’s sampling or their own self-monitoring  A Notice of Violation letter is mailed, and directs either OCSD or the industry to resample their industrial wastewater within 30 days of the date of the letter

Enforcement (cont.)  Other ways to initiate the enforcement program is through the inspection process by either OCSD or another outside agency; i.e. the Regional Board/Storm Drains, Fire Department, etc.

Enforcement (cont.)  Depending on the severity of the violations, the OCSD may present the case to the Orange County District Attorney’s (DA) office for criminal prosecution  The State Department of Toxic Substances Control and its Title 22 limits for hazardous waste is used as a guideline OR:  Depending on the severity of the violations, the OCSD may present the case to the Orange County District Attorney’s (DA) office for criminal prosecution  The State Department of Toxic Substances Control and its Title 22 limits for hazardous waste is used as a guideline OR:

Enforcement (cont.)  The OCSD will immediately issue an Order to Cease Noncompliant Discharge, followed by a Probation Order or Enforcement Compliance Schedule Agreement  Probation Orders are used for corrective actions that can be implemented within 90 days. The ECSA is used for longer, and more detailed corrective action timelines for industries to return to compliance  The OCSD will immediately issue an Order to Cease Noncompliant Discharge, followed by a Probation Order or Enforcement Compliance Schedule Agreement  Probation Orders are used for corrective actions that can be implemented within 90 days. The ECSA is used for longer, and more detailed corrective action timelines for industries to return to compliance

Enforcement (cont.)  In most non-criminal cases, the OCSD will also issue an Administrative Complaint, which would assess fines per day in violation of the industries permit limits.

Returning to Compliance; The Long and Winding Road “The Good, The Bad, and The Ugly”  The following three cases were investigated and prosecuted by the OCSD, and criminal charges were filed by the DA’s office, and all occurred within the past 5 years “The Good, The Bad, and The Ugly”  The following three cases were investigated and prosecuted by the OCSD, and criminal charges were filed by the DA’s office, and all occurred within the past 5 years

The “Good”  Company “A” was hit with one of the largest fines and criminal charges ever handed out to a private industry  Over $100,000 was paid by Company “A” to various agencies involved for their costs and efforts investigating the case. Criminal convictions were finalized two years after a raid conducted by the DA’s office and OCSD  Company “A” was hit with one of the largest fines and criminal charges ever handed out to a private industry  Over $100,000 was paid by Company “A” to various agencies involved for their costs and efforts investigating the case. Criminal convictions were finalized two years after a raid conducted by the DA’s office and OCSD

The “Good” (cont.)  Within a month after the “raid”, OCSD imposed a Probation Order on Company “A”, which required:  Upgrades to their pretreatment system (PTS)  The installation of a documented Operations and Maintenance (O&M) program for the PTS  Within a month after the “raid”, OCSD imposed a Probation Order on Company “A”, which required:  Upgrades to their pretreatment system (PTS)  The installation of a documented Operations and Maintenance (O&M) program for the PTS

The “Good” (cont.)  The hiring of wastewater treatment operators with a minimum Grade I CWEA certification level to cover all shifts of operation,  Submittal of a bi-monthly status report on the above items  The hiring of wastewater treatment operators with a minimum Grade I CWEA certification level to cover all shifts of operation,  Submittal of a bi-monthly status report on the above items

The “Good” (cont.)  The OCSD also revised Company “A’s” permit to require daily self- monitoring sampling for three metals, and pH

Company “A” Responded by…  Upgrading their PTS with a batch treatment system and electrocoagulation system  Implementing the PTS O&M program  Hiring one new operator, by the 3-month deadline. Company “A” asked for an extension for hiring more operators due to difficulties in finding qualified candidates, which the OCSD accepted  Upgrading their PTS with a batch treatment system and electrocoagulation system  Implementing the PTS O&M program  Hiring one new operator, by the 3-month deadline. Company “A” asked for an extension for hiring more operators due to difficulties in finding qualified candidates, which the OCSD accepted

The “Good” (cont.)  Company “A” incurred more metals violations approximately 6-months after the Probation Order. Most of the violations were caused by PTS equipment malfunctions

The “Good” (cont.)  Nine months after the probation order, Company “A” switched to a sulfide- based metals precipitation chemistry for the PTS, with good success. No violations have occurred since the change in chemistry; over two-and-a- half years

The “Good” (cont.)  Two more Grade I wastetreatment operators were hired to cover the remaining shifts  The OCSD downstreamed Company “A” to verify continued compliance more than a year after the initial raid, and found no violations  Two more Grade I wastetreatment operators were hired to cover the remaining shifts  The OCSD downstreamed Company “A” to verify continued compliance more than a year after the initial raid, and found no violations

The “Bad” (or not so good)  Company “B” was initially caught discharging spent chemicals directly into the industrial wastewater sampling point, and bypassing treatment, during a routine OCSD sampling event

The “Bad” (cont.)  The OCSD responded with an Order to Cease Noncompliant Discharges, followed by a Probation Order which directed Company “B” to conduct a wastewater characterization study, install batch treatment, and submit updated facility and PTS drawings and progress reports on a monthly basis

The “Bad” (cont.)  Company “B’s” permit was also revised to weekly self-monitoring for three heavy metals and pH

The “Bad” (cont.)  Company “B” responded by purchasing a new continuous PTS system (~$50k) and instituted wastehauling for some of the spent process solutions (~$30k)  New wastewater treatment operators were also hired during this time period  Company “B” responded by purchasing a new continuous PTS system (~$50k) and instituted wastehauling for some of the spent process solutions (~$30k)  New wastewater treatment operators were also hired during this time period

The “Bad” (cont.)  An Administrative Complaint settlement agreement was reached with Company “B” and OCSD after the initial Probation Order  No criminal charges were filed with the DA’s office  An Administrative Complaint settlement agreement was reached with Company “B” and OCSD after the initial Probation Order  No criminal charges were filed with the DA’s office

The “Bad” (cont.)  Unfortunately, Company “B” began having violations again approximately one year after the initial bust  Faulty operation of the new PTS equipment was cited, plus a lack of batch treatment for spent process solutions was noted by OCSD  Unfortunately, Company “B” began having violations again approximately one year after the initial bust  Faulty operation of the new PTS equipment was cited, plus a lack of batch treatment for spent process solutions was noted by OCSD

The “Bad” (cont.)  A compliance meeting was held between the OCSD and company “B” a few months after these violations. OCSD mandated that company “B” immediately install and operate a batch treatment system for all spent chemicals and discontinue “bleeding” this chemistry into the PTS  The OCSD also mandated that any further violations would result in a one-week suspension of Company “B’s” permit  A compliance meeting was held between the OCSD and company “B” a few months after these violations. OCSD mandated that company “B” immediately install and operate a batch treatment system for all spent chemicals and discontinue “bleeding” this chemistry into the PTS  The OCSD also mandated that any further violations would result in a one-week suspension of Company “B’s” permit

The “Bad” (cont.)  Since the meeting, Company “B” has instituted batch treatment of all spent chemicals, and has had no more violations over the last four months  Weekly self-monitoring remains in place, and probably will continue for some time  Since the meeting, Company “B” has instituted batch treatment of all spent chemicals, and has had no more violations over the last four months  Weekly self-monitoring remains in place, and probably will continue for some time

The “Ugly”  Company “C” is a case where the OCSD’s enforcement actions ultimately did not bring the company back into compliance for any meaningful length of time  Intentional deception by Company “C” eventually enabled the OCSD to seek the help of the Fire Department to close down the building and business  Company “C” is a case where the OCSD’s enforcement actions ultimately did not bring the company back into compliance for any meaningful length of time  Intentional deception by Company “C” eventually enabled the OCSD to seek the help of the Fire Department to close down the building and business

The “Ugly” (cont.)  The enforcement program started out with severe concentration violations for many heavy metals over a span of two to three months by OCSD sampling

The “Ugly” (cont.)  Due to the severity, the OCSD turned over the case to the DA’s office, who prosecuted the owner of Company “C” for illegal discharge of hazardous waste into the sewer system  Upon conviction, the owner was hit with fines and placed on probation  Due to the severity, the OCSD turned over the case to the DA’s office, who prosecuted the owner of Company “C” for illegal discharge of hazardous waste into the sewer system  Upon conviction, the owner was hit with fines and placed on probation

The “Ugly” (cont.)  Due to the low volume nature of the discharge, Company “C” decided to go “close loop”, or zero discharge, in order to avoid further penalties and sanctions by OCSD  The OCSD issued a conditional agreement, which accepted zero discharge, but allowed continued inspections of Company “C”  Due to the low volume nature of the discharge, Company “C” decided to go “close loop”, or zero discharge, in order to avoid further penalties and sanctions by OCSD  The OCSD issued a conditional agreement, which accepted zero discharge, but allowed continued inspections of Company “C”

The “Ugly” (cont.)  A little over a year after the agreement, the OCSD caught Company “C” discharging industrial wastewater once again, and in violation of the DA’s first probation order  This bust resulted in a second arrest of Company “C’s” owner  A little over a year after the agreement, the OCSD caught Company “C” discharging industrial wastewater once again, and in violation of the DA’s first probation order  This bust resulted in a second arrest of Company “C’s” owner

The “Ugly” (cont.)  The OCSD then contacted the Orange County Health Department to begin a remediation assessment of the property, plus help monitor activities at Company “C”

The “Ugly” (cont.)  The OCSD also notified the Fire Department of possible code violations within Company “C’s” building  After a Fire Department inspection, OCSD met with the Fire Department and the building owner / landlord.  The OCSD also notified the Fire Department of possible code violations within Company “C’s” building  After a Fire Department inspection, OCSD met with the Fire Department and the building owner / landlord.

The “Ugly”, A Finitum:  The meeting resulted in the eviction of Company “C” due to the code violations  The remediation of the property was also conducted after Company “C” was evicted  The meeting resulted in the eviction of Company “C” due to the code violations  The remediation of the property was also conducted after Company “C” was evicted

Questions? Mike Murray (714) Source Control Division Mike Murray (714) Source Control Division Orange County Sanitation District Deon Carrico (714) Source Control Division Deon Carrico (714) Source Control Division