EAS Lessons Learned Summary Lessons Learned Published in May 2014.

Slides:



Advertisements
Similar presentations
Seminar on Circuit Breaker
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
POWER QUALITY BACKGROUND & ELEC-SAVER TVSS
Introduction to Switchgear
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Inspection & Preventive maintenance of breakers
Chapter 12 Transformers. Chapter 12 Transformers.
Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Concept Design Review (CoDR) Shore Station DC Breaker Cable model Transient Analysis Components.
Lecture 1: Safety and Protection. 1. A robot may not injure a human being or, through inaction, allow a human being to come to harm. 2. A robot must obey.
Conversion of energy from one form to another Creating useful energy for a certain task Can use any type of energy.
Conversion of energy from one form to another Creating useful energy for a certain task Can use any type of energy.
September 2014 Lesson Learned Summary. September 2014 LLs 2 Three NERC lessons learned (LL) were published in September 2014 LL Redundant Network.
EE 369 POWER SYSTEM ANALYSIS
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
SHUNT CAPACITOR FUNDAMENTALS AND PROTECTION
Shipboard Electrical Distribution …“Shifting the Electric Plant to a Normal Full Power Lineup.”
Electrical Safety Testing of Electrical Installations and the verification of Electricians Test Tools Michael Bailey Transmille Ltd NCSLi 2014Transmille.
 A ‘shocking’ discovery.  In order for current to flow, the pathway must be a continuous, uninterrupted loop called a circuit.
Amplifier Circuit This amplifier circuit DC analysis.
SCADA and Telemetry Presented By:.
Shipboard Electrical Distribution References Required Introduction to Naval Engineering – Ch 17.
Area of Study 2: Electricity
Lesson 9: Electrical Components
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
Generating and Using Electricity
COMPONENTS REQUIRED STEP DOWN PRANSFORMER:
EE 462L dc and ac Power Distribution Systems Fall 2008.
POWER SYSTEM PROTECTION
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
Understanding Electricity
EAS Lessons Learned Summary Lessons Learned Published in August 2014.
Summary Rich Bauer, Senior Reliability Engineer Event Analysis Subcommittee – LL Update March 04, 2014.
NERC Lessons Learned Summary February NERC lessons learned published in February 2015 Two NERC lessons learned (LL) were published in February 2015.
Protection of Microgrids Using Differential Relays
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
EAS Lessons Learned Summary Lessons Learned Published in June 2014.
Announcements Read Chapters 10 and 11
POWER HOUSE.
Introduction to switchgears
NERC Lessons Learned Summary LLs Published in September 2015.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A Presentation On 132 KV GSS BEHROR
Submitted to: Submitted by:
ON 400 KV GSS RAISER JAIPUR ROAD ,BIKANER
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Introduction To Protective Relays This training is applicable to protective relaying and System Monitoring tasks associated with NERC Standards PRC-001.
Introduction To Protective Relays This training is applicable to protective relaying and System Monitoring tasks associated with NERC Standards PRC-001.
SMJE 2103 Overvoltage, Electrical Insulation and Protection Devices.
Protection of Power Systems
Protection of Power Systems
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Power System Protective Relaying-Part One
Summary Event Analysis Subcommittee – LL Update NERC OC Meeting - June 2014.
NERC Published Lessons Learned Summary
NERC Published Lessons Learned
Summary Rich Bauer, Senior Reliability Engineer
NERC Published Lessons Learned
EAS Lessons Learned Summary
NERC Published Lessons Learned Summary
NERC Published Lessons Learned Summary
Compliance Report to ERCOT TAC February 2007
NERC Published Lessons Learned
ELECTRICAL POWER-II Electrical engineering sixth semester
KELMAN CIRCUIT BREAKER ANALYZER
Presentation transcript:

EAS Lessons Learned Summary Lessons Learned Published in May 2014

RELIABILITY | ACCOUNTABILITY2 Three NERC lessons learned (LL) were published in May 2014 LL High AC Voltage can lead to Remote Terminal Unit (RTU) Failures. LL Circuit Breaker Modification Leads to Inadvertent Trips. LL Improved Contractor Oversight. May 2014 Lessons Learned

RELIABILITY | ACCOUNTABILITY3 RTU control output card sees high AC voltage leads to breakdown of the metal oxide varistors (MOVs) on the control card This leads to the equivalent of a control output contact(s) being shorted and/or excessive heating which has melted ribbon cables same effect Causes random operation of devices that are connected to these RTU control outputs Not exclusive to one vendor. Many RTUs are susceptible E.g. Coupling Capacitor Voltage Transformer (CCVT) delivered high voltage for approx. 3 mins before failing catastrophically Review the effect of high AC voltage on RTUs used for control High AC Voltage can lead to Remote Terminal Unit (RTU) Failures

RELIABILITY | ACCOUNTABILITY4 Circuit Breaker Modification Leads to Inadvertent Trips SF6 gas circuit breaker controls were field modified to trip on low gas and air pressure Field modification resulted in the breakers tripping when DC power was removed and then re-applied to the SF6 Gas circuit breaker When making changes to original factory equipment schemes, entities should analyze the scheme change to ensure that the removal and restoration of DC power to the scheme does not cause an undesirable operation

RELIABILITY | ACCOUNTABILITY5 Improved Contractor Oversight. Significant system disturbances caused by vendor performed work in stations without method to ensure work quality Generation facility experienced a trip due to an internal fault in a SF6 gas breaker Breaker trip interrupted power to the auxiliary transformer Fast bus transfer scheme isolates the auxiliary transformer and closes in a start-up transformer Upon closure of the start-up transformer, a 487/T1 phase start- up transformer differential relay actuated Two splices on the start-up transformer’s current transformer (CT) were missing insulating sleeves Created alternate path for the CT secondary current, causing the 487/T1 to actuate

RELIABILITY | ACCOUNTABILITY6 Improved Contractor Oversight Vendor oversight policies should include a discussion with the vendor of:  performance standards  expectations for the work  human error reduction techniques  verification of completed work Expectations between the entity and vendor with regard to the design, validation of calculations and settings, scheme testing, and commissioning must be clear to ensure a successful outcome Effective oversight of contractor work activities should be in place to help prevent these types of events

RELIABILITY | ACCOUNTABILITY7 Links to Lessons Learned Lessons Learned Link to Lessons Learned

RELIABILITY | ACCOUNTABILITY8 For more information please Questions