Reliable Power Reliable Markets Reliable People Future Demand and Energy Outlook (2008 – 2028) Assumptions, Methodology and Processes April 2, 2009 9 am.

Slides:



Advertisements
Similar presentations
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Advertisements

Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Assessment of Climate Change Impacts on Electricity Consumption and Residential Water Use in Cyprus Theodoros Zachariadis Dept. of Environmental Science.
Understanding Ontario’s Electricity System
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
George Godding Director DMC Office of Market Oversight and Investigations Federal Energy Regulatory Commission USEA/USAID Energy Partnership Program Brasilia,
Natural Gas Outlook National Association of State Energy Officials State Heating Oil and Propane Conference August 30, 2004 William Trapmann Energy Information.
Electricity Industry Deregulation in Taiwan I. Summary of the Framework of Electricity Industry Liberalization in Taiwan.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Big Sandy Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
In Regard To The Manitoba Hydro Needs For And Alternatives To (“NFAT”) Business Case Submission submitted to: The Manitoba Public Utilities Board by: Bruce.
Technical Conference on Net Metering Load Research Study November 5, 2014.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
Reliable Power Reliable Markets Reliable People Demand Response in Alberta’s Wholesale Electricity Market Demand Response Working Group Kick Off Meeting-
Natural Gas Data Systems Conceptual Framework Measurement and Distribution Current Developments and Changes Roy Kass Energy Information Administration.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Federal Energy Regulatory Commission Role Of The Market Monitor: ISO New England Dr. Hung-po Chao Director, Market Monitoring FERC Open Meeting Washington,
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
BI Marketing Analyst input into report marketing Report TitleElectricity in California Report Subtitle State profile of power sector, market trends and.
SEVENTH MEETING OF THE OSLO GROUP OF ENERGY STATISTICS HELSINKI, FINLAND 23 – 26 TH OCTOBER, 2012 BY SALIFU ADDO ENERGY COMMISSION OF GHANA ENERGY STATISTICS.
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
WCOAEE Meeting: Natural Gas & Electric Update April 16, 2015.
March 1, 2011 Load Analysis Update Calvin Opheim Manager, Load Forecasting and Analysis.
Updated 1/28/2011.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
Yellowhead Area Transmission System Development
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
CSG/ERC 44 th Annual Meeting Springfield, MA Douglas MacIntyre, Senior Oil Market Analyst Petroleum Division U.S. Energy Information Administration August.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
AESO Update to PCC October 15, AESO October 2015 Update AESO currently developing 2015 Long-term Plan –Exploring low growth scenario corresponding.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
AES NewEnergy To The Institute For Regulatory Policy Studies May 18, 2000 By David L. Townley.
2015 NARUC Winter Meeting Nick Wagner – Iowa Utilities Board 1.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Conferenceboard.ca Marie-Christine Bernard Associate Director, Provincial and Territorial Forecast Service, The Conference Board of Canada November 17,
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Employment Outlook for Ontario: Opportunities in the Resource Sector
Massachusetts Electric Restructuring Roundtable
Power and Energy An Introduction to Electric Regulatory NERC,FERC,CARB CAISO,CEC & DoE
Wholesale Electricity Marketing & Trading Fundamentals
Draft 2013 Energy-Efficiency Forecast
AESO Update to PCC July 16, 2015.
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Reliable Power Reliable Markets Reliable People Future Demand and Energy Outlook (2008 – 2028) Assumptions, Methodology and Processes April 2, am – 11am

2 Agenda Introduction Doyle Sullivan Director, Regulatory Long-Term Load Forecast Future Demand and Energy Outlook (2008 – 2028) Area Studies Recent Economic Events – Impact on long term load forecast? 2009 Forecast Schedule LaRhonda Papworth Supervisor, Long-Term Load Forecasting Confidence Bands Steven Everett Economic Analyst Forecasting Group Rob Baker Manager, Forecasting Questions Doyle Sullivan Rob Baker LaRhonda Papworth Steven Everett Closing Remarks Rob Baker

3 What is the AESO? Established in 2003 through the EUA to integrate Power Pool of Alberta and Transmission Administrator Performs “Independent System Operator” function Non-profit organization independent of all other electricity market participants Governed by independent board appointed by the Minister of Energy Regulated by Alberta Utilities Commission  Transmission Tariff  Transmission Development  AESO Rules Operation of the AESO funded through Pool Trading Charge and Transmission Tariff

4 Our Core Business  Markets: develop and operate Alberta’s real-time wholesale energy market to facilitate fair, efficient and open competition  Transmission System Development: plan and develop the transmission system to ensure continued reliability and facilitate the competitive market and investment in new supply  Transmission System Access: provide system access for both generation and load customers  System Operations: direct the reliable operation of Alberta’s power grid

5 AESO Forecasting Group Introduction Rob Baker, Manager Forecasting LaRhonda Papworth, Supervisor Long Term Forecasting –Steven Everett, Economic Analyst –Jenni Fontaine, Forecast Analyst Ashikur Bhuyia, Supervisor Mid Term Forecasting –Mike Wu, Senior Forecasting Engineer All can be contacted at

Reliable Power Reliable Markets Reliable People Long-Term Load Forecast – FC2008 LaRhonda Papworth Supervisor, Long-Term Load Forecasting

7 Long-Term Load Forecast Topics  How long-term load forecast is used  Future Demand and Energy Outlook (2008 – 2028) Why? How?  Recent Economic Events – impact on long-term load forecast  2009 Forecast Schedule

8 How: Example of How Long Term Load Forecast Is Used  Transmission Planning  Long-Term Adequacy assessments  Tariff Billing Determinants  Loss Forecasting  Input into WECC studies  Area Studies –Area or region of interest is identified –Work with DFOs, TFOs, Transmission Planning, industry and mapping consultants, customers to evaluate current long-term load forecast and adjust for recent and detailed information –Identify possible long-term load expectations

9 Why does the AESO produce a Long Term Load Forecast? Electric Utilities Act Transmission Regulation Part 2 Transmission System Planning Transmission planning ‑ forecasting need 8 In forecasting the needs of Alberta under section 33 of the Act, the ISO a)Must anticipate future demand for electricity, generation capacity, and appropriate reserves required to meet the forecast load so that transmission facilities can be planned to be available in a timely manner to accommodate the forecast load and new generation facilities, b)Must make assumptions about future load growth, the timing and location of future generation additions and other related assumptions to support transmission planning, k)to collect, store and disseminate information relating to the current and future electricity needs of Alberta and the capacity of the interconnected electric system to meet those needs, and make information available to the public, Electric Utilities Act Duties of Independent System Operator Emphasis added

10 How Long-Term Load Forecast is Created Source:ERCB Table 11: Electric Energy Distribution Sales and Number of Customers, 2008 AESO metered volumes AESO estimation of load served by on-site generation (behind-the-fence load)

11 Industrial (without Oilsands) Oilsands Commercial Residential Farm Customer Sector Energy Forecast Methodology Residential* Customer Sector Industrial* Customer Sector Commercial* Customer Sector Farm* Customer Sector A Picture of Alberta Internal Load (without Losses) by Following Customer Sectors:  Load Served by On-Site Generation (Behind-the-Fence)**  Transmission Connected Customer Load** *Source: ERCB **Source: AESO

12 Economic Inputs – Alberta GDP  Long-term load forecast based on economic inputs from March 2008 Source: Conference Board of Canada

13 Industrial (w/o Oilsands) Sector Energy Forecast Model Inputs:Alberta Mining GDP Lagged Sector Sales Source: Conference Board of Canada, AESO

14 Oilsands Sector Energy Model Oilsands Energy = Annual Mining Production * Mining kWh/barrel + Annual In-Situ Production * In-Situ kWh/barrel Source:Canadian Association of Petroleum Producers – Crude Oil Forecast, Markets & Pipeline Expansions – June 2008 AESO adjustments included

15 Oilsands Sector Energy Forecast Source: AESO

16 Commercial Sector Energy Forecast Model Inputs:Alberta GDP Lagged Sector Sales (one-year) Constant Source: Conference Board of Canada, AESO

17 Residential & Farm Sectors Energy Forecast Models Model for Residential: Model for Farm: Model Inputs:Alberta Agricultural GDP Heating Degree Days Constant Model Inputs:Average Use Per Customer multiplied by # Customers (function of Population)

18 FC2008 Sector Totals

19 Past Forecast Results - Energy YearActuals (GWh) Year over year change FC2005FC2006FC2007FC , %+1.2% , %-1.5%-1.2% , %-4.9%-4.8%-1.3% Source: AESO

20 Past Forecast Results – Winter Peak YearActuals (MW) Year over year change FC2005FC2006FC2007FC /069, % /079, %-3.8% /089, %-5.4%-3.2%- 2008/099, %-8.0%-6.2%-0.3% Source: AESO

21 How: Energy to Individual Metering Points Oilsands Industrial (w/o Oilsands) Commercial Residential Farm Project Information Load Forecast Assumptions DFO Information Project Information Load Forecast Assumptions DFO Information Historical Growth Rates Project Information ~500 Metering Points Annual Energy Forecast DFO Information Historical Growth Rates

22 Recent Economic Events... What do the economic events of the last 6 months mean to the results of the 2008 Future Demand and Energy Outlook? The economic models used for the customer sector forecasts are based on 20+ years of historical data – containing an number of past economic downturns Numerous opinions exist regarding severity and time length of this economic downturn Important to remember that the scope of this report is long- term …5 … …20 years. BUT it is prudent for the AESO to perform analysis to quantify what the impact could be, short-term and/or long-term

23 Forecasted AIL Winter Peak Source: AESO

Forecast Schedule DFO substation level information to the AESO – April 2009 Customer Sector Models completed – May 2009 Reconciliation of Long-term forecast with Mid-Term Forecast – May 2009 Conference Board of Canada Provincial Outlook 2009 – delayed 2 months to May 2009 Publication of Long-term load forecast - September 2009 Stakeholder Presentation of 2009 Report – Sep/Oct 2009

Reliable Power Reliable Markets Reliable People Confidence Bands Steven Everett Economic Analyst

26 Confidence Intervals Alberta Internal Load (AIL) Energy Confidence Intervals Source: AESO

27 Confidence Intervals Alberta Internal Load (AIL) Winter Peak Demand Confidence Intervals Source: AESO

28 Confidence Intervals FC2008 (MW) P97.5 (MW) P2.5 (MW) Actual (MW) 20089,83310,2199,4609, ,65915,66813,505 +1,009-1, ,27121,06317,396 +1,791-1,875 Alberta Internal Load (AIL) Peak Demand Confidence Intervals Source: AESO

Reliable Power Reliable Markets Reliable People Closing Remarks

30 AESO Forecasting AESO has consolidated some forecasting into one group: –Mid term load forecasting (0 – 26 months) –Long term load forecasting (0 – 20 years) –Ancillary Services Forecasting –Losses Forecasting More integration in 2009: –Mid and long term forecasts – coordination/optimization continues –Forecasting products - gathered to one area of our web site –Updates will be posted Formal enquiries through –Allows for a complete response and high standard of service

31 Questions?

Reliable Power Reliable Markets Reliable People Conclusion

33 Conclusion Thank you for attending – please forward to us any ideas not addressed or further questions: Please remember to complete exit survey. Presentation will be posted in about a week on AESO website Limited number of hard copies of the Future Demand and Energy Outlook (2008 – 2028) are available