1 Program Introduction MDT Chamber Production Silicon Tracker Project Software & Physics Frank Linde (15’) Marcel Vreeswijk (25’) Nigel Hessey (25’) Stan.

Slides:



Advertisements
Similar presentations
TYPE TEXT HERE On July 4, 2012, scientists at CERN announced the discovery of an essential part of the Standard Model of particle physics: the Higgs.
Advertisements

ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
The CERN-JINR Collaboration J. Engelen March 27, 2006.
Status of the ATLAS MM project
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Drift tube wiring Chamber assembly X-ray scan of BOL-0 at CERN Status and Plans The Making of ATLAS Muon.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
CM-18 June The Measurement and Monitoring of the Field from the MICE Magnets Michael A Green Lawrence Berkeley Laboratory, Berkeley, USA Frank Filthaut.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
T2K – Canada Accelerator & Detector Status D. Karlen University of Victoria & TRIUMF ACOT meeting, May 12, 2007.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
22 February 2001ATLAS MDT Electronics PDR1 The MROD The MDT Precision Chambers ROD Adriaan König University of Nijmegen.
26 February 2002ATLAS Muon Electronics Meeting1 MROD: the MDT Read Out Driver Status of MROD-1 Prototype Adriaan König University of Nijmegen.
11 November 2003ATLAS MROD Design Review1 The MROD The Read Out Driver for the ATLAS MDT Muon Precision Chambers Marcello Barisonzi, Henk Boterenbrood,
The Finnish CMS Collaboration Helsinki Institute of Physics S. Czellar, A. Heikkinen, J. Härkönen, V. Karimäki, H. Katajisto,R. Kinnunen,T. Lampén, K.
1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review.
R. Ball September 27 th  Criteria Re-use existing readout systems where possible High density Build inexpensive adapters to existing systems Save.
PG2 Solid State Tracking Detectors Seems like we are all newcomers here Topics are arranged according to R&D topic not sub-system as it was in 2013 – Meaning.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
DAQ System at the 2002 ATLAS Muon Test Beam G. Avolio – Univ. della Calabria E. Pasqualucci - INFN Roma.
Institutional Responsibilities HEPHY – CMS Management Meeting June 20, 2013.
ATLAS Tracker Group PPD Staff Talk 28/Nov/ ATLAS SCT Builders Inc Annual Report Mike Tyndel (Group leader & SCT Project Leader) –Richard Apsimon.
14 August Magnetic Field in the ATLAS Muon Spectrometer Masahiro Morii for the ATLAS Group Harvard University Laboratory for Particle Physics and.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
ATLAS & D0 D0:  Status, software & analysisFrank Filthaut & Silke Duensing ATLAS:  Software & analysisStan Bentvelsen  Silicon trackerSimon Peeters.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Combined Test Beams Definition of Combined Test Beams Why would we want them? Why we might not want them? Host laboratory issues? Experimenter issues.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
CMS Computing and Core-Software USCMS CB Riverside, May 19, 2001 David Stickland, Princeton University CMS Computing and Core-Software Deputy PM.
Silicon Module Tests The modules are tested in the production labs. HIP is is participating in the rod quality tests at CERN. The plan of HIP CMS is to.
US ATLAS Tier 1 Facility Rich Baker Brookhaven National Laboratory Review of U.S. LHC Software and Computing Projects Fermi National Laboratory November.
1 Oct 2008 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
ATLAS micromegas activities (MAMMA)
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
SoLID review DAQ recommendations Alexandre Camsonne.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Precision Drift Chambers for the ATLAS Muon Spectrometer
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
NA61 vertex detector Status update from RBI effort Tome Anticic Ru đ er Bošković Institute.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
CODA Graham Heyes Computer Center Director Data Acquisition Support group leader.
Micromegas for SLHC A project to investigate the use and determine the working parameters of Micromegas for SLHC tracking – in conjunction with the ATLAS.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
Provocative. Who needs detector hardware (until 2025)? ATLAS LHCb KM3 ALICE Darwin/XENON ILC/CLIC Virgo/GW Auger ? medical imaging, beam therapy.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Chamber assembly Assembly QA Assembly QC Summary, Status and Plans The Assembly of ATLAS Muon chambers.
Jos VermeulenTopical Lectures, Computer Instrumentation, DCS, FE Readout, June Computer Instrumentation Detector Control and Front-End Readout Jos.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
Jos VermeulenTopical lectures, Computer Instrumentation, Introduction, June Computer Instrumentation Introduction Jos Vermeulen, UvA / NIKHEF Topical.
VELO Replacement Girish Patel University of Liverpool.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Technology and R&D Summary and next steps Burkhard Schmidt.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
The Read Out Driver for the ATLAS Muon Precision Chambers
Long Fruitful collaboration between DESY and Japanese institutes
L H C A T L A S International Collaboration on the LHC Project
Presentation transcript:

1 Program Introduction MDT Chamber Production Silicon Tracker Project Software & Physics Frank Linde (15’) Marcel Vreeswijk (25’) Nigel Hessey (25’) Stan Bentvelsen (30’) Laboratory Tour: –MDT production line (20’) –SCT area (20’) Lunch Peter NIKHEF, 22-June-2001

2 ATLAS/D0 in Amsterdam & Nijmegen ATLAS contributions  Muon Spectrometer (hardware)  End Cap Toroids  MDT Chambers  Alignment  Detector Control  MDT Read-Out Driver  Silicon Tracker (hardware)  100 modules  Disc design  Assembly & test of one complete end cap  Trigger & DAQ (hard- & software)  R&D participation ATLASD0 Staff 9 4 PostDoc 1 1 PhD 7 7 Students 1 1 Technical support: very good Medipix DataGRID (G measurement)

3 End Cap Toroids Vacuum Vessels (Schelde Exotech) First Vessel: Assembly in progress to CERN: fall 2001 (6 months delay) Second Vessel: Machining in progress to CERN: spring 2002 (on time) Coil Winding (HMA power systems) Conductor delivery problematic; other materials & tools in place Negotiations on claimed cost overruns by the company ongoing

4 Muon-Spectrometer: Alignment Alignment Key issue: RASNIK 3-point monitor Status: Sensors delivered to MDT sites; DAQ prototyped Outstanding: Radiation tolerance of the multiplexers Difficulties: Cost (mechanics!) & lens quality Many other interested parties MasterMuxMasterMux USA15MuxUSA15Mux On-chamberOff-chamber mask CCD lens multiplexer

5 Muon-Spectrometer: Detector Control Detector control (NIKHEF/CERN R&D collaboration) Key issue: Modular: CAN CPU with many sensor types precise Hall B-sensors; cheap T-sensors, … Status: Being delivered to MDT sites Outstanding: Radiation tolerance of the CAN CPUs Used also by: D0, Saclay, CMS(?), LAr (H8), … T-sensors 30 max  T  0.2 o C B-sensors  B/B  CAN NetworkCAN Network digital busses to MDT front-end extra bus (insurance) On-chamber

6 (Muon-Spectrometer:) Read-Out Driver Read-Out Driver Difficulty: Cost (ROD+CSM doubles CORE) Status: R&D phase Test bed: cosmic ray set-up 1.28 Gbit/s S-Link to ROB 6 x CSM-Link TDC 1 TDC 18 CSM 18 x TDC 1 TDC 18 CSM 18 x MDT chambers MROD (NIKHEF) USA15 ROB Surface ROD or ROB “IN” ROD or ROB “OUT” CSMCSM

7 Trigger & DAQ design & studies of MDT-ROD/ROS MDT-ROD construction spreadsheet & computer model: ROBs, networks & LVL2 processor farm November 2001: Trigger, DAQ & DCS NIKHEF online software DCS software {

8 ATLAS efforts on realization of CORE commitments (We realize our participation in ATLAS physics studies is not in line with our ambition ………)  Muon Spectrometer  End cap Toroids  Vacuum vessels: progressing well (minor delays)  Coil winding: company claims cost overruns  MDT chamber construction:  R&D basically completed (and it took a lot of time)  Huge “serial” production effort in  Alignment, Detector Control & MDT Read-Out Drivers  Completed or near completion  Point of concern: radiation tolerance  Silicon Tracker:  Design closure urgently required (else we get squeezed)  Significant assembly & test effort in /4  Trigger & DAQ:  Many R&D contributions; synergy with MDT-Read-Out Driver project Summary