I-69 Strategic Planning Corridor Study: Fulton To Eddyville, KY Fulton, Hickman, Graves, Marshall, Livingston, Lyon Counties Public Meeting November 15,

Slides:



Advertisements
Similar presentations
4-1 Application Workshop. 4-2 Module Objectives Apply the concepts learned to a freeway lane closure Case 1. Without a back up Case 2. With a back up.
Advertisements

Presentation to ODOT Planners April 25, 2012 Bill Johnston – Area 1 Planner (Astoria) US 101: Camp Rilea to Surf Pines Lane Facility Plan.
OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
I-26 Safety Project. Project Corridor I-26 between I-95 and Summerville Number one and three ranked location for interstate safety improvements AADT =
Great Western Corridor Feasibility Study
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
DRIVING ON EXPRESSWAYS
Interactive Highway Safety Design Model (IHSDM)
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Community Presentation I-20 EAST TEXAS CORRIDOR STUDY.
Lec 33, Ch.5, pp : Accident reduction capabilities and effectiveness of safety design features (Objectives) Learn what’s involved in safety engineering.
Public Scoping Meetings September 26, 2011 and September 29, 2011 Cajalco Road Widening and Safety Enhancement Project.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Oklahoma’s Experience with Wire Rope Safety Fence.
New I-65 Interchange at Worthsville Road Welcome!.
Hardin County Engineering Department September 12, 2006.
1 Context Sensitive Design A.K.A. The “Think” Method of Design Howard Preston, P.E. Senior Transportation Engineering CH2M HILL.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
US 1 CORRIDOR STUDY AND PROJECT PRIORITIZATION PROCESS Augusta, GA November 29, 2012 Jeff Carroll CDM Smith Georgia Association of MPOs Annual Conference.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
Freeway Signing Plan Design April 29, 2008
Enhanced Safety Prediction Methodology and Analysis Tool for Freeways and Interchanges James A. Bonneson August 2012 NCHRP Project
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
SIGHT DISTANCE Spring 2015.
I-65 Added Travel Lanes Project in Tippecanoe County
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
3R Standards Resurfacing, Restoration, & Rehabilitation Ch. 7 1.
Incorporating Safety into the Highway Design Process.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Design Exceptions 101 Ed Fischer, State Traffic-Roadway Engineer Mike Morrow, FHWA Field Operations Engineer Kent R. Belleque, Senior Interchange Engineer.
Expressway Driving. Characteristics of Expressway Driving Roadway Speed Interchanges No cross traffic Median Tollbooths Entrance/exit ramps Limited access.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
INTRODUCTION Grade separation is an effective way of handling intersecting traffic with greatest efficiency, safety, capacity. An interchange is a system.
Road Design.
The Ministry of Transportation and Infrastructure welcomes you to an Open House for: Trans Canada Highway No.1 Improvements in Salmon Arm Your comments.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Interchange Design Wes Mayberry Transportation Engineering Intern
Local Government Section
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
Evaluation of Alternative Methods for Identifying High Collision Concentration Locations Raghavan Srinivasan 1 Craig Lyon 2 Bhagwant Persaud 2 Carol Martell.
1 At-Grade Intersection Design. 2 Objectives Define general intersection design objectives Describe factors that influence curb return design For a nice.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Design Speed and Target Speed Norman W. Garrick Lecture 3.1 Street and Highway Design Norman W. Garrick Lecture 3.1 Street and Highway Design.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Expressway Driving Entering, lane changing, and exiting.
Low Cost Safety Improvements Pooled Funds Study Safety of Lane/Shoulder Width Combinations on Two-Lane Rural Roads Dr. Frank Gross, Vanasse Hangen Brustlin.
USA Parkway Project Welcome Public Information Meeting to the
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
CE 453 Highway Design Iowa State University Highway Design Criteria Overview April 24, 2006 David R. Dougherty, P.E.
Context Sensitive Solutions Focus Group Session Lynn Purnell Parsons Brinckerhoff Prosperity Church Road Corridor December 8, 2005.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Introduction CE331 Transportation Engineering Fall 2013 Dr. Reg Souleyrette.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
1 The Highway Safety Manual Predictive Methods. 2 New Highway Safety Manual of 2010 ►Methodology is like that for assessing and assuring the adequacy.
The I-465 West Leg Reconstruction Project
Project Management Team Meeting #3
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Pilot Project Evaluation
Design Criteria CTC 440.
Design Speed, Operating Speed, and Posted Speed Limit Practices
Presentation transcript:

I-69 Strategic Planning Corridor Study: Fulton To Eddyville, KY Fulton, Hickman, Graves, Marshall, Livingston, Lyon Counties Public Meeting November 15, 2010

Project Background: Corridor 18 Feasibility Study  Produced information regarding cost, economic efficiency, impacts on economic development, financial viability and other relevant features of this large scale highway project.  Completed November 1995

Project Background: Corridor 18 Special Issues Study  Redefined the corridor from Indianapolis, IN to the Lower Rio Grande Valley  Completed July 1997

Project Background: Project Background: Strategic Corridor Planning Study for I-69: Eddyville to Henderson, KY  Segment of Independent Utility (SIU) 5  Overview of Existing Conditions  Wendell H. Ford and Edward T. Breathitt Parkways  Completed March 2005

This Project: Strategic Planning Study This Project: Strategic Planning Study Purchase Parkway / I-24 Fulton, Hickman, Graves, Marshall, Livingston, and Lyon Counties  SIU 6  Beginning – Tennessee State Line in Fulton County  Ending – West of I-24 and Western Kentucky Parkway Interchange in Lyon County

Strategic Planning Study: I-69 Corridor Purchase Parkway / I-24 Strategic Planning Study: I-69 Corridor Purchase Parkway / I-24 Fulton, Hickman, Graves, Marshall, Livingston, and Lyon Counties  Study Beginning - April 2010  Anticipated Completion - February 2011

 Scope of Work  Inventory existing conditions  Define Interstate criteria  Determine and evaluate deficiencies  Identify options and strategies for needed improvements  Develop recommendations and potential cost  Document findings Strategic Planning Study: I-69 Corridor Purchase Parkway / I-24 Strategic Planning Study: I-69 Corridor Purchase Parkway / I-24 Fulton, Hickman, Graves, Marshall, Livingston, and Lyon Counties

Strategic Planning Study: I-69 Corridor Interstate Design Standards  Fully Controlled Access  At Ramp Terminals  Minimum 100 foot urban  Minimum 300 foot rural  Design Speed  70 MPH – Rural  50 MPH – Urban  Four Lanes  12 feet wide

Strategic Planning Study: I-69 Corridor Interstate Design Standards  Shoulder Widths (paved)  Inside – 4 foot min  Outside – 10 foot min  Median  Rural – 36 foot min  Urban – 10 foot min

 Minimum Horizontal Curvature  Rural foot radius  Urban foot radius  Minimum Stopping Sight Distance  Rural feet  Urban feet Strategic Planning Study: I-69 Corridor Interstate Design Standards

 Bridges  All lanes and shoulders at least 16 foot vertical clearance  Full paved shoulder width  Crashworthy barrier railing  Structurally adequate  Sign Trusses – 17 foot vertical clearance

Strategic Planning Study: I-69 Corridor Interstate Design Standards  Interchange  Provide all traffic movements  Spacing between interchanges  Minimum 1 mile Urban  Minimum 3 mile Rural  Adequate Acceleration/ Deceleration Tapers

Strategic Planning Study: I-69 Corridor Overview of Existing Conditions  Traffic – 2010 Vehicles per day (vpd)  Purchase Parkway Ranges from 7,060 vpd to 19,200 vpd  I-24 Ranges from 21,900 vpd to 28,200 vpd

Strategic Planning Study: I-69 Corridor Traffic Forecasts  Traffic – 2040 Vehicles per day (vpd)  Purchase Parkway Ranges from 14,800 vpd to 40,300 vpd  I-24 Ranges from 45,900 vpd to 59,200 vpd

Strategic Planning Study: I-69 Corridor Overview of Existing Conditions  Crash History ( )  Purchase Parkway 7 Fatalities 136 Injuries 449 Property Damage Only  I-24 6 Fatalities 68 Injuries 255 Property Damage Only

Strategic Planning Study: I-69 Corridor Overview of Existing Conditions  Roadway Geometry  Lane Widths  12 feet wide  Shoulder Widths  Inside 0 – 6 feet  Outside feet  Median Widths  Urban 16 feet  Rural 36 feet

Strategic Planning Study: I-69 Corridor Overview of Existing Conditions  Bridges  Width  30 – 38 feet  Vertical Clearance  – feet  Bridge Railing  Upgrade to current standards

Strategic Planning Study: I-69 Corridor Environmental Overview  Overview of critical environmental (NEPA) considerations  Environmental Justice  Review of the Socioeconomic characteristics along the project area  2000 U.S. Census Bureau  Findings of no impact to the studied area populations since corridor is with-in existing Right of Way

Strategic Planning Study: I-69 Corridor Geotechnical Overview  Overview of anticipated improvements and geotechnical considerations  To be completed in conjunction with final report

Strategic Planning Study: I-69 Corridor Public Meeting Handout FRONT

BACK

Strategic Planning Study: I-69 Corridor Questionnaire / Comment Sheet  Public Awareness  Obtain Public Input  Constraints  Site Specific Issues/Concerns  Determine Expectations

Strategic Planning Study: I-69 Corridor Purchase Parkway / I-24 Strategic Planning Study: I-69 Corridor Purchase Parkway / I-24 Fulton, Hickman, Graves, Marshall, Livingston, and Lyon Counties Questions and Comments