1 JPA Meeting Joint Planning Agreement Western Area Power Administration Desert Southwest Region July 13, 2005.

Slides:



Advertisements
Similar presentations
March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
Advertisements

Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
Think-Pair-Share What are some limited natural resources that you use on a regular basis?: 1.
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
Moving Forward after the Colorado River Basin Water Supply & Demand Study CRWUA Las Vegas, NV December 10-12, 2014.
Arizona Water Banking Authority December 3, 2014.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, November 5, :00 to 3:00 p.m. EST.
Bureau of Reclamation Mid-Pacific Region Regional Criteria for Evaluating Water Management Plans for the Sacramento River Contractors.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
Arizona Water Banking Authority December 4, 2013.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, January 19, :00 to 4:00 p.m. EST 4 th Quarter
Group Meeting for the Utility Industry: Networking and Upcoming Events after the ASUG Annual Conference.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
Kern County Energy Summit November 13, 2013 MidAmerican Solar, LLC Paul Caudill – President.
SharePoint at SRP Perry Bellaire Content Management Salt River Project 2/9/2010.
WaterSMART Basin Study Program. SECURE Water Act Section 9503 Directs the Secretary to establish a climate change adaptation program which includes –Assess.
LexisNexis – On-Line ID Proofing for Lenders Lender employees must have Level 2 eAuthentication accounts to access various Guaranteed Loan System web pages.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
RI Telecommunications Education Access Fund (RITEAF) RI Department of Education June 12, 2015.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
2013 Calendar Year Customer Survey Results
T. Rowe Price, Invest With Confidence and the Bighorn Sheep logo is a registered trademark of T. Rowe Price Group, Inc. Please dial from.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
Rocky Mountain Power Five Year Study Kick Off Meeting.
WestConnect Regional Transmission Service Tariff March 16, 2015.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Arizona Corporation Commission Docket No. E-00000D Biennial Transmission Assessment Workshop II September 18, 2008.
PINAL COUNTY TOWN HALL Tabletop Exercise - Panel Discussion on a Local Emergency.
Proprietary and confidential. Do not copy or distribute without permission from OATI - © Open Access Technology International, Inc. Slide 1 ISO New England.
APS Ten-Year Plans th BTA Presentation John Lucas Manager Transmission Planning May 22, 2008.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Tuesday, April 21, :00 to 3:00 p.m. EDT.
WestConnect RTO-ACC Update September 2, 2003 Cary Deise APS.
Overview of Southern Company Transmission
Arizona Water Banking Authority December 19, 2012.
Arizona Corporation Commission Energy Workshop February 16, 2001.
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
Application for New or Different Service South San Joaquin Irrigation District (SSJID) Case Study San Joaquin LAFCo CALAFCO 2010 Annual Conference October.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Wednesday, January 28, :00 to 3:00 p.m. ET.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Everything you need to know! © 2015 GBTA. All rights reserved. GBTA All Access Membership Thank you for joining the webinar. We will begin shortly.
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
Certified Trainer Conference Call August 26 th, 2005.
CAP Trail Master Plan: Pinal County Segment CAP Trail Draft Master Plan Presentation to Pinal County Board of Supervisors November 4, 2015.
Dynamic Signal Workshop January 14, 2016 APA Office Phoenix, Arizona 1.
Adviser Panel. Go to All DD Track Advisers: Click “Advisor Login”
How to Access and Redeem Cisco Certification Exam Discount Vouchers Step-by-Step Guide August 2013.
Yuma Agriculture Water – Rights and Supply Yuma’s Agriculture Water: What You Need To Know Yuma Agriculture Water Conference January 13, 2016 Thomas Buschatzke,
APA Customer Bubble Charts Work in Progress Updated January 25, 2016 (a.m.) (Contact: John Underhill ) 1.
Copyright © 2008 Pearson Education, inc. or its affiliates. All rights reserved. Welcome to PearsonAccess Session Two Administrative Functions.
REGION H Water Planning Group Freese and Nichols, Inc. | LBG-Guyton Associates | Ekistics Corporation DEVELOPING THE REGION H 2016 REGIONAL WATER PLAN.
Arizona Corporation Commission Biennial Transmission Assessment Workshop May 22 & 23, 2008 Phoenix, AZ.
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
CitiBuy Support January, 2009 This guide will provide you with a quick overview of the new Support Portal for the Baltimore CitiBuy Purchasing System City.
Planning & Zoning Commission January Purpose of the General Plan  Required by State Statute  Roadmap for growth & development  Guides change.
Integrating your Community with your AMS and showing ROI Rob Kaighn TMA Resources, Inc.
2010 June Finance Forum Agenda Corporate Affairs Update Miscellaneous Items to Note 2010 Annual Parish Finance Report Tutorial Preview of Fall Finance.
Ed Gerak, Executive Director
Duke Energy Carolinas Quarterly Stakeholder Meeting
BHP 2016 Formula Rate True-Up Meeting
BHP 2017 Projected Net Revenue Requirement Meeting
BHP 2015 Formula Rate True-Up Meeting
Duke Energy Carolinas Quarterly Stakeholder Meeting
BHP 2018 Projected Net Revenue Requirement Meeting
BHP 2017 Formula Rate True-Up Meeting
Duke Energy Carolinas Quarterly Stakeholder Meeting
Presentation transcript:

1 JPA Meeting Joint Planning Agreement Western Area Power Administration Desert Southwest Region July 13, 2005

2 JPA Agenda Welcome / Introductions / Logistics Power Marketing Updates (Oretta/Gray) –O&M Agreements (Oretta) –Remarketing Efforts (Gray) WALC OASIS (Steward) 10 Year Plan (Byron) –HDR161KV – BLY161KV Reconductoring –South of Phoenix Study Updates (York) –River System Study –Southern Arizona Study JPA Goals (Moulton) Action Items

3 JPA Meeting Power Marketing Updates Mary Oretta Jean Gray (602) (602)

4 Power Marketing Updates O & M Agreements Remarketing Efforts

5 JPA Meeting WALC OASIS John Steward (602)

6 WALC OASIS Definitions Webpage Links Registration Process to obtain Login View Business Practices View Transmission Offerings View Transmission Reservations Summary Questions

7 Definitions Open Access Same-time Information System (OASIS) Open Access Technology International (OATI) WestTTrans Transmission Services Information Network (TSIN)

8 Webpage Links

9 Registration Process REGISTRATION PROCESS 1. Obtain a NERC acronym – Once an acronym is obtained proceed to step (Takes approximately 1 to 2 Days). 2. Register Company with OATI, Company Registration form to OATI. Once OATI verifies your company is registered proceed to step Obtain OATI’s security certificate Registration – Contact OATI to start the registration process. When a security certificate is obtained proceed to step Register with OATI as an OASIS user – user registration form to OATI. When user account is activated proceed to step Contact Western to activate you as a valid customer – Western will verify if customer is eligible to purchase transmission. Customer will be notified if they met eligibility requirements. Proceed to step Log on to WestTTrans and submit transmission request. 7. How to Purchase WALC Transmission Services FlowchartHow to Purchase WALC Transmission Services Flowchart

10 Western’s Business Practices Web Site:

11 Example of Offerings

12 Transmission Offerings Knowledge of transmission provider’s path View the price associated with a path Most important view ATC (both firm and non-firm) on a given path during a specific time period

13 Transmission Reservations View transmission market tendencies View the status of your transmission request View queued position of your request

14 Example of Reservations

15 Summary Registration Process View Western’s Business Practice & News Tutorials – Transmission Offerings & Transmission Reservations

16 JPA Meeting 10 Year Plan Updates Don Byron (602)

17 10 Year Plan Updates Headgate Rock 161-kV Substation to Blythe 161-kV Substation Reconductoring –(HDR161KV – BLY161KV Reconductoring) South of Phoenix –Completed Upgrades –Future Projects Ten Year Plan Link

18 JPA Meeting Transmission Study Updates Leonard York (602)

19 Update - River System Study Purpose –Evaluate Three 230kV Transmission Projects –Expect Each to Substantially Increase River System ATC –Each To Require About a Three-Year Lead Time –Focus on Year 2008 Load-Serving in Mohave County Projects –Reconductor Mead-Davis-Topock Line –Reconductor Gavilan Peak/Peacock Line –Build Griffith-North Havasu Line Participants –APS –CAWCD –MEC –SWTC –TEP/UNS Case –Reviewed By Participants

20 Update – Southern Arizona Study Purpose –Re-rate Path C (South of Phoenix) –Inservice: South of Phoenix Uprate to Casa Grande –Not Inservice: Pinal West/Santa Rosa/Browning 500kV Results –Increased Rating from 290 to 660 MW –Critical Outage: Kyrene-Knox 230kV –Critical Overload: Lone Butte-Test Track 230kV Report –Non-Simultaneous Import Power Flow Study –Expect Brief Report by September 2005

21 JPA Meeting Joint Planning Agreement Goals Ron Moulton (602)

22 JPA Principles Purpose & Objectives –Establish a Planning Committee. –Interactively develop a long-term “Transmission Plan.” –Review & Revise Transmission Plan Annually.

23 JPA Principles Planning Committee –Comprised of Parties to the JPA. –Identify, receive and process planning information provided by Parties annually. –Prepare Transmission Plan. –Hold Annual Planning Meeting(s)

24 JPA Principles Annual Planning Meeting –Held in July each year. –Review Transmission Plan –Review, discuss, deliberate other.

25 JPA Principles Goals –Interactively develop DSW 10 Year Transmission Plan. River System South of Phoenix System –File DSW 10 Year Transmission Plan with Arizona Corporation Commission (ACC) in January 2006 (as a courtesy). –Support/Coordinate with Southwest Area Transmission Planning Forum (SWAT). –Support ACC Biennial Transmission Assessment (next round 2006).

26 JPA Meeting Any –Questions? –Comments? –Answers?

27 JPA Action Items

28 JPA Meeting Thanks for Attending!!

29 JPA Participants AGUILA AK-CHIN INDIAN COMMUNITY ARIZONA POWER AUTHORITY ARIZONA POWER POOLING ASSN ARIZONA PUBLIC SERVICE COMPANY AVRA VALLEY IRRAGATION DISTRICT BOULDER CITY, CITY OF BUCKEYE WATER CONSERVATION DRAINAGE DIST BUREAU OF RECLAMATION CENTRAL ARIZONA WATER CONSERVATION DIST CHANDLER HEIGHTS CITRUS IRRAGATION DIST COLORADO RIVER COMM OF NEVADA CORTARO-MARANA IRRIGATION DISTRICT ELECTRICAL DIST NO 3 ELECTRICAL DIST NO 4 ELECTRICAL DIST NO 5 MARICOPA ELECTRICAL DIST NO 5 PINAL ELECTRICAL DIST NO 6 ELECTRICAL DIST NO 7 ELECTRICAL DIST NO 8 HARQUAHALA VALLEY POWER DISTRICT LINCOLN COUNTY POWER DISTRICT #1 MARICOPA WATER DISTRICT

30 JPA Participants MCMULLEN VALLEY WATER CONSERVATION & DD NEEDLES, CITY OF OCOTILLO WATER CONSV DIST OVERTON POWER DISTRICT NO 5 QUEEN CREEK IRRIGATION DIST ROOSEVELT IRRIGATION DIST SAFFORD, CITY OF SALT RIVER PROJECT SAN CARLOS IRRIGATION PROJECT SAN TAN IRRIGATION DISTRICT SILVERBELL IRRIGATION DISTRICT THATCHER, TOWN OF TOHONO O’ODHAM UTILITY AUTHORITY TOHOPAH IRRIGATION DISTRICT UNIT “B” IRRIGATION & DRAINAGE DISTRICT UNS ELECTRIC INC VALLEY ELECTRIC ASSOCIATION WELLTON-MOHAWK IRRIGATION & DD WICKENBURG, TOWN OF YUMA COUNTY WATER USERS ASSOC YUMA IRRIGATION DISTRICT YUMA PROVING GROUND YUMA-MESA IRRIGATION & DRAIN