AST Portfolio Review Tom Statler, NSF/AST AAAC Meeting 13 Oct 2011.

Slides:



Advertisements
Similar presentations
Restructuring of the Materials Research Science and Engineering Center (MRSEC) Program Creating New Opportunities for Collaborations and Partnerships in.
Advertisements

Joint CASC/CCI Workshop Report Strategic and Tactical Recommendations EDUCAUSE Campus Cyberinfrastructure Working Group Coalition for Academic Scientific.
Ivy Tech Community College
January 25, 2011 U.S. Department of Housing and Urban Development Office of Sustainable Housing and Communities Lessons Learned from the Inaugural Regional.
EISWG The Environmental Information Services Working Group of the NOAA Science Advisory Board Raymond J. Ban April 22, 2009.
OFFICE OF SCIENCE Office of High Energy Physics, Cosmic Frontier Mid-Scale Dark Energy Spectroscopic Instrument (MS-DESI) Experiment Fermilab PAC Oct.
AAS Congressional Visits Day Tom Statler & Maria Womack March 12, 2013.
Theory & Computation Networks Tom Statler, NSF/AST Thierry Lanz, NASA/Astrophysics AAAC Meeting 13 Oct 2011.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Under Secretary for Science U.S. Department.
USGS Realignment, Science Planning, and FY 2012 Budget Matthew C. Larsen Associate Director Climate and Land Use Change U.S. Department of the Interior.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Magnet Program Audit for Baltimore County Public Schools Presentation of Key Findings and Recommendations November 19, 2013 Marilyn Zlotnik, Vice President.
Strengths and challenges of the CPG development process: Canadian Society of Nephrology Marcello Tonelli MD SM Chair, CSN-CPG Committee.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
1 EEC Board Policy and Research Committee October 2, 2013 State Advisory Council (SAC) Sustainability for Early Childhood Systems Building.
Keck Observatory and The System: Astro2010 Activities Mike Bolte, Shri Kulkarni, Taft Armandroff Keck Strategic Planning Discussions September 18, 2009.
OIR C OMMITTEE S TATUS R EPORT 2 nd face-to-face meeting Oct , 2014 Beckman Center of the National Academies Irvine, CA.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
Reorganization at NCAR Presentation to the UCAR Board of Trustees February 25, 2004.
Program Status Physics of the Cosmos Program (PCOS) Cosmic Origins Program (COR) M. Ahmed Briefing to the PhysPAG January 8, 2012 AAS Meeting, Austin Texas.
University Strategic Resource Planning Council Budget.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Policy Council and Program Planning. The Head Start Program Planning Cycle National Center on Program Management and Fiscal Operations (PMFO)
Office of High Energy Physics View on Dark Energy Collaborations Kathleen Turner Office of High Energy Physics (HEP) Office of Science (SC), U.S. Department.
Austerity In the Age of Innovation Bethany Johns, Ph.D. John Bahcall Public Policy Fellow American Astronomical Society June 22, 2012 IPPW-9.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
Activities of and Prospective Issues before the Committee on Astronomy and Astrophysics Report by David Spergel, CAA Co-Chair Disclaimer: These slides.
AST Portfolio Review Tom Statler, NSF/AST AAAC Telecon, 11 May 2012.
Committee on Astronomy and Astrophysics Co-Chairs: Meg Urry Chuck Bennett.
Critical Infrastructure Protection: Program Overview
AAAC Jim Ulvestad February 10, Outline Brief Facility and Science News Budget Outlook & Astro2010 Status Meta-issues 2 02/10/2012.
An Integrated Control Framework & Control Objectives for Information Technology – An IT Governance Framework COSO and COBIT 4.0.
Fort Ord Reuse Authority FY Annual Budget June 13, 2014 Board Presentation Michael A. Houlemard, Jr. Executive Officer.
NSF Update AAAC 8 February Update Topics FY2007 Budget Situation FY2007 Budget Situation FY2008 Request FY2008 Request Senior Review Status and.
LSC – Hanford 16 th - 19 th August 2004 The View from NSF Changes in NSF leadership Funding Interagency Working Group response to Q2C Outreach - New $5M.
Exo-Planet Task Force (ExoPTF) Jonathan Lunine (LPL) Stephen Ridgway (NASA)
1 Large Synoptic Survey Telescope Status Update for AAAC October 13, 2011 Nigel Sharp Division of Astronomical Sciences, NSF Kathy Turner Office of High.
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
Extension Leadership Councils A Partner in Extension Education Barbara A. Board Extension Specialist, Program and Leadership Development 231 Smyth Hall.
Brian Dewhurst Feb 9, 2007 Board on Physics and Astronomy NRC Astrophysics Update AAAC Feb 8-9, 2007 Brian Dewhurst BPA Staff.
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
WESTERN WILDLAND URBAN INTERFACE GRANT PROGRAM Program Overview & Application Process.
AST Update Astronomy and Astrophysics Advisory Committee 10 May 2007.
2010 Technology Committee Overview and Plan January 26, 2010 Presentation to Board Content revised 2/8/2010 based on Board input.
PoDAG XXI: SEEDS SEED: NSIDC Potential Interactions NSIDC DAAC should prepare an evaluation of their desired future roles in "core activities" and in mission.
1 © 2003 Natural SPI Implementing CMMI improvements in a new, large, diverse organization Implementing CMMI Improvements in a New, Large Diverse Organization.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems EU environmental research : Part B Policy objectives  Lisbon strategy.
The Quality Enhancement Plan from a SACSCOC Perspective 1 Leadership Orientation for 2016-A Institutions January 27, 2014 Michael S. Johnson Senior Vice.
Excellence in Executive Leadership UNCLASSIFIED – For Official Use Only (FOUO) APEX 29 Executive Roundtable Executive Development September 2009.
Funding: Staffing for Research Computing What staffing models does your institution use for research computing? How does your institution pay for the staffing.
AAAC Jim Ulvestad December 1, Divestment issues  “Divestment,” in the parlance of the Portfolio Review, implies removal of a telescope from the.
What’s at stake in CA? California could lose an existing Congressional seat $435 Billion in Federal Funding is allocated each year $4.35 Trillion over.
Laboratory Operations Board
PRESENTED TO: ENERGY FACILITY CONTRACTORS GROUP SAFETY ANALYSIS WORKING GROUP SAFETY ANALYSIS WORKSHOP BY: CHRIS CHAVES NSR&D PROGRAM OFFICE OF NUCLEAR.
1 LSST Town Hall 227 th meeting of the AAS 1/7/2016 Pat Eliason, LSSTC Executive Office Pat Osmer, LSSTC Senior Advisor.
Senior Review of NSF Facilities NOAO Users Committee October 4, 2005.
Division of Astronomical Sciences Senior Review Astronomy and Astrophysics Advisory Committee 10 May 2007.
The Role of a Program Director NCI Division of Cancer Biology New Grantee Workshop October 18-19, 2010 Jerry Li, MD, PhD Division of Cancer Biology NCI/NIH.
PCOS/PhysPAG Town Hall AAS-HEAD, Monterey Richard Griffiths PCOS Program Scientist April 9, 2013 NASA HQ Perspective.
NASA ARMD COUNCIL OF DEANS Tucson, AZ April 13-14, 2005 Progress report from: The Strategic Task Force Joseph L. Cecchi The University of New Mexico.
Local Control Accountability Plan Update, Renewal, Review Santa Barbara Unified School District
Jim Ulvestad Division Director, AST May 6, 2011 Division of Astronomical Sciences.
NSF INCLUDES Inclusion Across the Nation of Learners of Underrepresented Discoverers in Engineering and Science AISL PI Meeting, March 1, 2016 Sylvia M.
STRATEGIC PLAN OVERVIEW Prepared By: SOUTHERN MARYLAND CHAPTER STRATEGIC PLANNING COMMITTEE April 2007.
ESSB 6656 Overview and Scope of the Select Committee on Quality Improvement in State Hospitals April 29, 2016 Kevin Black, Senate Committee Services Andy.
BACWA RECYCLED WATER COMMITTEE. Recycled Water Committee 16 agencies represented Coordinate and collaborate on short-term and long-term regional water.
Addressing Curricular Barriers to Completion
Presentation transcript:

AST Portfolio Review Tom Statler, NSF/AST AAAC Meeting 13 Oct 2011

AST Portfolio Review 13 Oct NWNH advised: “If …budget is truly flat…there is no possibility of implementing …the recommended program…without…enacting the recommendations of the first 2006 senior review and/or …a second more drastic…review before mid-decade.” (p. 240) AST portfolio review will not be a repeat of Senior Review, which was confined to facilities. Examine balance across entire portfolio of activities AST supports. Enable progress on central science questions (Ch. 2 of NWNH), balancing recommendations for new facilities & instrumentation with capabilities of existing facilities & programs. AAAC

Review Philosophy 13 Oct Goal: Define the astronomical landscape for the coming decade. 2 “mapping” steps: 1.Let key science questions from NWNH determine set of critical capabilities needed in 2015, 2020, Determine how to achieve these capabilities through combination of i.New facilities & instrumentation (following NWNH) ii.Evolution of existing facilities & programs AAAC

Review Philosophy 13 Oct Note that review is explicitly forward-looking Key question re: existing facilities is Can the facility be evolved so as to provide a critical future capability? - not - Has the facility earned the right to survive by virtue of past performance? Avoid overburdening facilities with demand for statistics or overburdening committee with need to invent metrics of productivity. AAAC

Other Boundary Conditions 13 Oct Multiple budget scenarios through 2025 to be provided by AST. Consider costs of delivering/evolving existing capabilities and costs of new facilities. No revisiting/rehashing Astro2010 process or recommendations. Include context of NASA, DOE, & joint programs, private observatories, & international activities Consider consequences for domestic, international partnerships and on state of the profession. AAAC

Charge to Committee 13 Oct Recommend balance of investment in new & existing facilities, grant programs, and workforce required in 2015, 2020, 2025 to enable progress on science questions identified by Astro2010. Prioritize with sufficient granularity to permit adjustments in response to variations in Federal funding. Recommendations should be viable and lead to vigorous and sustainable future for US astronomy. Report early enough in 2012 to inform FY2014 budget request. AAAC

Current Status 13 Oct Public announcements at May 2011 AAS and via mid-June to AAS and APS/APD distribution lists. Nominations for committee membership accepted until July member PR Committee now complete, diverse with regard to science expertise, geography, career stage, and other important demographic dimensions Opportunity for Community input will be announced (by AAS/APS ) week of Oct 17; Committee membership to be made public via PR webpage. Committee has met by telecon; first face-to-face Oct AAAC