Treatment of Firm Redirects Recent FERC Order. Entergy Order Docket Nos. ER05-1065-013 OA07-32-012 ER12-1071-000 Issued May 16, 2013

Slides:



Advertisements
Similar presentations
DRAFT Recommendation Preemption & Competition CHALLENGER COUNTEROFFER June 25, 2013 NAESB OS.
Advertisements

OASIS Subcommittee Status Preemption and Competition EC Meeting 4/30/13.
1 Intra-Day Nominations through a Posted Point of Restriction Kathryn Burch Project Manager – Standards and Regulatory Compliance Spectra Energy Transmission.
Lottery Method in BPA’s Simultaneous Submission Windows and Potential Application to the Simultaneous Defender Matching Process NAESB Meeting 05/01/13.
Preemption and Competition Redirect Issues NAESB OS Meeting June 6, 2012 BPA Presenting.
Timing and Flowchart Assignment
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Timing Considerations for Short-term Preemption and Competition Automation NAESB OS Presentation.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
FERC Order minute Scheduling.
Resales and the Northwest Market A High Level Preview presented by Pacific Northwest Customers*
Tiers 1 & 3 Assignment Flat Profile Recommendation.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, February 25, :00 to 3:00 p.m. EST.
NAESB OASIS Subcommittee Long Term Competition Mike Norris, Rebecca Berdahl May 13, /13/141.
1 Free Template from MFR….  What did the zero say to eight?  Nice belt.
DRAFT E-Tag Notification Presentation NAESB OS Mar 26-28, 2013 Seattle, WA.
OASIS Subcommittee Status EC Meeting 2/18/14. Preemption and Competition Annual Plan Items Affected 2013 AP Item 2(a) Develop version 2 business practice.
EC Meeting 2/24/ AP Item 7(b) Modify NAESB standards WEQ , WEQ , and related standards to be consistent with the Commission’s policy.
Pseudo-Tie Reservations
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, January 19, :00 to 4:00 p.m. EST 4 th Quarter
Short-Term Competitions and Preemption.  Overview  Standards being covered are:  Motion 2 - Fixed Capacity Over Term of Request. ▪ Tier 1 Service –
NAESB WEQ UPDATE Interchange Scheduling and Accounting Subcommittee Meeting Salt Lake, UT August 26, 2015 Bob Harshbarger Puget Sound Energy.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Resales, Aggregations & Redirects of Resales NAESB OS July 22-24, 2014 BPA Presenting.
1 Free Template from  NAESB  Coordinate Interchange Scheduling Subcommittee  OASIS Subcommittee  Business Practice Subcommittee.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, May 13th, :00 to 3:00 p.m. EDT.
Resale Business Practice Standards 3 Options remain.
Short-term Competition and Preemption (STCP) May 2015 Presenter: Marie Pompel Bonneville Power Administration.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Tuesday, April 21, :00 to 3:00 p.m. EDT.
Electronic Scheduling /Information Technology Subcommittees (ESS/ITS) Update 2008 Review November 4, 2008.
E-Tag Notification Assignment NAESB OS Sep 17-19, 2013 Seattle, WA Assignee – Robin Cross Seattle City Light Interested Resources: Marie Pompel - BPA Power.
Resale Business Practice Standards 3 Options remain.
NITS Concepts  Contract Data Model: NITS Agreement represented as a Contract Contract has one or more Facilities Facility may be one or more Resources.
OASIS SUBCOMMITTEE STATUS EC Meeting 4/29/14. Preemption and Competition Annual Plan Items Affected  2013 AP Item 2(a) Develop version 2 business practice.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Resales, Aggregations & Redirects of Resales NAESB OS Presentation August 20, 2014 BPA Presenting.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Tuesday, July 21, :00 to 3:00 p.m. EDT.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Wednesday, January 28, :00 to 3:00 p.m. ET.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Capacity Reassignments, Aggregation & Redirects of Reassignments NAESB OS – May 13th, 2014 BPA.
Consolidation (API 5.d R09015) Business Practice Standards Draft WEQ OS Marie Pompel – July 2015.
NAESB WEQ EC Meeting 10/20/2015.   Workload  Long-Term Competition for Rollover Rights OASIS Subcommittee.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Conditional Resales NAESB Assignment Update April 16th, 2014 Bob Zerfing, Rebecca Berdahl.
NAESB Update Kathy Anderson October 2015 MIC Meeting.
02/19/14 REVIEW AND UPDATE FLOWCHART AND TIMING. Goals Finish going through the process flowchart listing the steps and various options for each. Develop.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
03/11/14 RECOMMENDATION FLOWCHART AND TIMING. GOALS Finish going through the process flowchart listing the steps and various options for each. Develop.
UNCONDITIONAL AND LEAD TIMES PREEMPTION AND COMPETITION TIMING.
NT Assignment Update: 9/17/13. NT Assignment Update Resources: CompanyResources BPARebecca Berdahl, Milos Bosanac, Ann Shintani, Bob Zerfing ClarkBrenna.
NAESB NITS, and Long-term Competition
Preemption-ROFR Notification
NT Assignment Update: 9/17/13.
Duke Energy Carolinas Quarterly Stakeholder Meeting
WEQ OASIS Subcommittee
BPA Formal Comments Overview to NAESB OS
BPA Formal Comments Recap of ‘Best Offer’ Proposal
Duke Energy Carolinas Quarterly Stakeholder Meeting
Duke Energy Carolinas Quarterly Stakeholder Meeting
NAESB WEQ OASIS Subcommittee Report NAESB WEQ Executive Committee
Recommended Appendix B Redirect Standards Examples
Preemption & Competition Standards BPA – Southern Compromise Proposal October 24, 2017 PURPOSE: Review and discuss the inequity with the Short-Term Firm.
Add/Terminate NITS DNR
Assigned to the WEQ OASIS and BPS Subcommittees
Use of the term “Confirm” and derivatives in NAESB Business Standards
Duke Energy Carolinas Quarterly Stakeholder Meeting
BPA Formal Comments Recap of ‘Best Offer’ Proposal
Short-term Competition and Preemption (STCP)
Interchange Scheduling and Accounting Subcommittee Meeting
FERC Guidance – Long Term Competition
Kathy Anderson October 2015 MIC Meeting
OASIS Subcommittee Status Preemption and Competition
Assigned to the WEQ OASIS and BPS Subcommittees
NAESB WEQ OASIS Subcommittee Report NAESB WEQ Executive Committee
OASIS Notification Recommendation.
Presentation transcript:

Treatment of Firm Redirects Recent FERC Order

Entergy Order Docket Nos. ER OA ER Issued May 16, Paragraphs provide new ruling on treatment of Firm Redirects

Impacts (Page 1) Release of reservation capacity on Parent – Capacity on the Parent Reservation is not to be released until Firm Redirect is confirmed and unconditional. (Paragraph 31) – FERC recognizes that WEQ says that the capacity is released as soon as the Firm Redirect is confirmed and says the clarification applies to the NAESB standard as well. (Footnote 82)

Impacts (Page 2) Give the same reservation priority to a request for redirect service as the underlying service if the requested redirect is for the full remaining term of the underlying service. (Paragraph 33) Give the redirect the same priority as any other request of equal duration if redirect is not for the full remaining term of the underlying service. (Paragraph 33)

Excerpt from Entergy Order 31. Therefore, we agree that Dynegy is the guiding precedent on the issue before us. Consistent with Dynegy, a customer receiving firm transmission service, who requests to redirect that firm transmission service, should not lose its right to its original transmission path for the period of the redirect request when the customer confirms the transmission provider’s acceptance of the redirect request. That customer’s rights to the original path do not terminate until the redirect request becomes unconditional pursuant to the conditional reservation deadline in OATT section 13.2.

Excerpt from Entergy Order 32. We also agree with Union Power that requiring a customer to give up rights to the original path after the redirect request has been accepted and confirmed but before the request has become unconditional would subject the customer to the risk of losing the rights to both the original path and the redirect path. This result could occur if the customer does not wish to match the price or term of a competing request of equal or longer duration. This outcome would create a strong disincentive for transmission service customers to request redirect service. While the holding in Dynegy may tie up some transmission capacity on both the original and the newly requested path in the period after the confirmation of the redirect request but before the passing of the conditional reservation deadline, we find that this drawback does not outweigh the negative effect of putting a transmission customer requesting a redirect at risk of losing all of its transmission service rights for the period of the requested redirect. For these reasons, we find that the TSR Business Practices related to requests for redirect service are not consistent with Commission policy and thus are unjust and unreasonable. Accordingly, Entergy must align its transmission service redirect practices and sections V.2.2 and V.2.3 of the TSR Business Practices consistent with this finding.

Excerpt from Entergy Order 33. We also clarify that, for the purposes of reservation priority under OATT sections 13.2 (firm transmission service) and 14.2 (non-firm transmission service), Entergy must give the same reservation priority to a request for redirect service as the underlying service if the requested redirect is for the full remaining term of the underlying service. If the requested redirect is not for the full remaining term of the underlying service, then Entergy must give the redirect the same priority as any other request of equal duration. As the Commission stated in Order No. 890, a redirect right does not grant the customer access to queue position different from other customers submitting new requests for service. Treating requests for redirect service in this manner is just and reasonable because it preserves the priority of the underlying service without enhancing the priority of an associated request for redirect service.

Excerpt from Entergy Order Footnote 82 from Entergy Order NAESB WEQ Standard also uses the term “confirmation” when addressing when a customer loses its rights to its original path upon a redirect request, and our clarification here applies to that standard as well. We note that NAESB is currently preparing revisions to its business practice standards addressing preemption and competition on OASIS. See

Motions That May Be Impacted Motion 11 Motion 34 Motion 41 Motion 43 Motion 45

Motion 11 Redirect on a Firm basis shall be treated as any other ORIGINAL reservation and subject to preemption and competition on its own merit and afforded ROFR based on the nature of the challenging request. Conditionality of the Redirect on a Firm basis reservation shall be based on the service and term of the Redirect on a Firm basis reservation.

Motion 34 Redirect Request of the defenders should be processed as regular WEQ Business Practice Standards process and will not be prevented from submitting a redirect. WEQ Business Practice Standards should therefore be silent about limiting the redirects.

Motion 41 Limitation on redirecting the resale shall be the same as that applied to redirecting the parent of the resale which is a defender. If Business Practices are silent about redirect of Defender, these will also be silent about redirect of resale.

Motion 43 For any one challenger, there will be only one round of competition, and there will be no more defenders selected than are needed to grant full capacity to the challenger assuming no defenders exercise their ROFR.

Motion 45 Requests (pending) for Redirect on a Firm basis shall be evaluated and impact transmission capability only in the amount in excess of the impacts to transmission capability held by the confirmed firm reservation being redirected in accordance with WEQ and 9.4. When considering a request (pending) for Redirect on a Firm basis as a potential Challenger in preemption and competition the magnitude of the ATC/AFC deficiency that must be mitigated by preemption and competition shall be no more than the net increase in impact to transmission capability over that already held by the confirmed firm reservation being redirected. When considering a request (pending) for Redirect on a Firm basis as a potential Defender (No ROFR)in preemption and competition shall contribute to mitigating the Challenger's ATC/AFC deficiency shall be no more than the net increase in impact to transmission capability over that already held by the confirmed firm reservation being redirected.