Project Management Role Swan – Tyee Intertie Project.

Slides:



Advertisements
Similar presentations
Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project.
Advertisements

Roles & Responsibilities in Construction Management
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Utility As-Built Information Value Awareness
Why Do People Join Groups?
Presentation to 2007 Tidal Energy Conference Ketchikan, AK January 24, 2007 Providing Diversity for Alaska’s Energy Future A New Source of Emission-Free.
Jamie Young, Associate Director, Chicago Office for Sponsored Research, Northwestern University.
April 23/14. Ursa Major SAFETY HEALTH & ENVIRONMENT April 6:00 Previous 24 Hours Total to Date First Aid Record. Injury TURNAROUNDS & MAJORS TURNAROUNDS.
Unit 6: Procuring and Managing Resources CERT Program Manager.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
2  A nonprofit, nonpartisan association  Represents highway and transportation departments in the 50 states, the District of Columbia, and Puerto Rico.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
Communications. Acquiring and transmitting data Most important PM skill –If you cannot communicate your needs, wants, expectations you will fail –A good.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
The Quality Management System
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Managing Company Tactical Operations
Lands’ End Wind Project Kristine McCormick Michelle Shively Greg Brown Tim Pierie.
Acquisitions, a Publisher’s Perspective Craig Duncan Development Manager External Development Studio Building the partnership between.
State Financing Programs for Brownfield Redevelopment.
Chapter 8 Support Functions
The Importance of Emergency Medical Service Communication n communicate patient information n provide contact with medical control n control and coordinate.
A Major Business Disruption A Strategy for Minimising the Downtime Anthony Hegarty Mitigating Risks.
Improving Morale in Construction Luke M. Snell Director, Concrete Industry Management Del E Webb School of Construction Arizona State University Tempe,
H&S Consultants Consulting Services and Project Management.
1 Professional Development Training – Enhancing the Delivery of Services Marcela E. Stanislaus facilitator Blackmon Roberts Group, Inc.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Catastrophe Management for Executives: A Primer Catastrophe Management for Executives: A Primer.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
A Transportation Engineering Curriculum for the Future.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Traffic Incident Management at the Big Dig Presenter: Kevin A Duffy- CA/T Manager of Emergency Planning & Response
Guest Cycle A division of the flow of business through a hotel that identifies the physical contacts and financial exchanges between guests and hotel employees.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
BONAFIDE MARITIME TRADERS. SALES Life Saving Appliances Fire Safety Appliance Communication & Navigational Equipments Deck/Engine/Saloon/Electrical Provisions.
Contract Training Class I
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Erv Gasser Natural Resource Specialist nps Baer Field Manager National Interagency BAER Team Leader - North team National Park Service, Seattle, Wa BAER.
AEP Corpus Christi TDC Advance Outage Scheduling Initiative.
Transportation Worker Identification Credentials (TWIC)
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
APPROACH TO A FULLY INTEGRATED PERFORMANCE ASSURANCE SYSTEM Integrated Safety Management Summit Knoxville, TN August 24-27, 2009 Presented by: Gary Grant.
2009 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 6, 2009.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
Implementation Logistics What we used to do What we did this year How it turned out What we would do different.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Combination of People, Process and Technology to manage the procurement and administration of contingent workers at the State of South Carolina Requisitions.
Module 3 Organization Overview Module 3 Organization Overview Subjects to be covered in this module include: Terminology Terminology Organizational structure.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Project Stakeholder Integration in Off-Site Construction May 24, 2016 Partners in Progress.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
New Grantee Orientation Webinar Series Is Your House in Order?: Preparing for the Compliance Visit October 29 th 2012; 2:00 - 3:00 PM (EDT)
Davis-Bacon Compliance Principles
Legal requirements and contractual duties
Module 3 Organization Overview
Temporary Works Co-ordination
Physical Security Office
Planning and BMPs for Large LUPs
Construction Management Services April 16, 2018
Session 11: Finance Function
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Project Management Role Swan – Tyee Intertie Project

Swan-Tyee Intertie Southeast Alaska Tubular steel138 kV tie line 57 miles in length. The STI ties the hydro facilities of Ketchikan, Petersburg and Wrangell together. Closest community – Ketchikan, 30 air miles from closest point

Difficulties Included No roads, Helicopter access only Rugged terrain, 4 long span crossings, spans over 3,490’ to 6,890’ in length Weather: rain, snow, wind, fog High winds can cause shutdowns and fog which moves in and out quickly stops your helicopter supply line in its tracks. Helicopter shutdowns can leave field personnel stranded. Short construction season Snow made it difficult to start before June Storms and shorter day light hours markedly reduced productivity after mid-September Logistics: truck, barge, helicopter Tubular steel was fabricated in PA, shipped by truck to Seattle, barged to Ketchikan. Then assembled/barged and lifted into place by helicopter.

Camp at Shrimp Bay

Helicopters on the Barge

Erickson Air-Crane

A good day – only rain

Helicopters in the Fog

Steep Hillside Drilling

Materials all organized.

Towers on Barge

Another day at the office?

Brief History Several Project Owners Funding from several sources Several Engineering Approaches Clearing Started 2002 Foundations Started and Stopped 2004 Project Resurrected in 2007 Construction restarted 2008 Energized 2009 Required Focused Vision to Complete

Project Management Role Represent SEAPA’s Interest Onsite Move the Project Forward Keep Accurate Records Provide Professional Advice

Project Management Service Myself as On-site Representative A local hire Administrative Assistant – invaluable Off-site Assistant PM – ready to step in at a moments notice. Scheduling, design and construction specialist available as needed

PM Primary Duties A single point of contact for all involved entities: Reviewed and recommended approval for payment of invoices Monitored budgets and schedules Developed Cash Flow analysis Provided reports to AEA to meet Grant obligations Scheduled and chaired frequent project meetings –Established Agenda –Issued Minutes –Identified critical issues early on

PM Primary Duties A single point of contact for all involved entities: –Owner: Southeast Alaska Power Agency (SEAPA) –Engineer/Construction Manager: Dryden & LaRue –Contractor: Wilson Construction –Foundation Subcontractor: Crux Subsurface –Clearing Contractor: Columbia Helicopter –Environmental Monitor: Tetra Tech EC –Primary Permitting Agency: USFS –Steel Pole Supplier: Valmont Industries –Conductor Supplier: APAR Industries –Many other material and service providers

Other Less Obvious Duties Assisted with travel arrangements for Off-site visits by Others Arranged local PR events Coordinate public dissemination of project: –Newspapers –Radio Became part of the community

Approach and Emphasis Primary Emphasis was on: –Fostering good communication between ALL parties - keep everyone talking and resolving issues before they impacted the Project Communication is important – Listening is an important part of communication

Successful Project One that is: Constructed safely, on schedule, within budget, and with high quality that meets all permit, regulatory and code requirements. This project met the goals: –Particularly proud that their were No Significant Accidents

Was it Luck? Luck is Created Through Dedication and Hard Work

I believe the success of the project was because everyone had a common vision and worked towards a common goal. This starts with the Owner and it was our job as Project Manager to keep the Owners vision alive through out the project. This was done through good open and honest communication.