JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.

Slides:



Advertisements
Similar presentations

Advertisements

Acquisition Planning and Adequate Market Research National Oceanic and Atmospheric Administration Acquisition and Grants Office Oversight and Compliance.
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
O&S Cost Estimating JHP Case Study 1 UNCLASSIFIED notional data for notional program.
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
JHP Case Study Exercise 1 UNCLASSIFIED notional data for notional program.
Framework for the Service Acquisition Process Conduct Historical Analysis Define Stakeholder & Customer Needs 2. Review Current Strategy 3. Market Research.
OASD Logistics and Materiel Readiness
Cost 101 for Life Cycle Logisticians R&D Cost: program costs primarily associated with the development of a new or improved capability to the point where.
1 Doc # USAMC LOGSA--Supporting Warfighters Globally U.S. Army MaterielCommand US AMC LOGSA Parts Management Plan Builder 29 April 2008.
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
LTC Linwood Clark OADUSD (MPP&R) DSN
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
LOG 101 Curriculum Review 16 Jul 04 Richard A. Andrews, CPL Course Manager.
1 Twelfth PEO/SYSCOM Commanders Conference The NAVSEA Perspective On Full Service Partnering Mr. John Goodhart Assistant Deputy Commander Fleet Logistics.
Life Cycle Logistics.
LOG 236 Curriculum Review 15 Jan 2010 Curriculum Review LOG 236 Performance Based Logistics Presented to the Life Cycle Logistics (LCL) Functional Integrated.
1 DISTRIBUTION A. Approved for Public Release; Distribution Unlimited. 88ABW , 23 May Integrity  Service  Excellence ADT 101: Introduction.
1 Life Cycle Logistics FIPT FIPT Action Items 19 OCT 12.
LOG 101 Curriculum Review 16 Oct 2009 Curriculum Review LOG 101 Acquisition Logistics Fundamentals Presented to the Life Cycle Logistics (LCL) Functional.
Strategic Vision Life Cycle Logistics Functional IPT Mrs. Sue Dryden DASD(Materiel Readiness) January 13, 2012.
Performance-Based Logistics Affordability: Can We Afford Categorical Conversion to Performance- Based Acquisition? Warner Robins Air Logistics Center Andrew.
Curriculum Review Product Support Assessment-Driven DAU Performance Based Logistics (PBL) Learning Asset Transition Roadmap Presented to the Life Cycle.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
Materiel Development Decision (MDD) Information Requirements
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
LOG 200 Curriculum Review 15 Apr 2011 Curriculum Review LOG 200 Intermediate Acquisition Logistics Presented to the Life Cycle Logistics (LCL) Functional.
LOG 101 Curriculum Review 28 Jun 02 Richard A. Andrews, CPL Course Manager.
Condition Based Maintenance Plus (CBM+) Overview
ARMY CAUCUS DSP Conference 23 May Army Caucus Recommendations Problem: The Army Standardization Program’s products and services are not recognized.
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
UNCLASSIFIED PSM Support to Cost Reporting 1. UNCLASSIFIED PSM Help Required 2 DoDI requires cost reporting on ALL Sustainment Contracts over.
Action/Initiative Date Action Initiated: December 2003 Status: On-Going Government and Industry Forum consisting of all military services, weapons system.
Business, Cost Estimating & Financial Management Considerations
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
DoD Template for Application of TLCSM and PBL
Contracting (Product) Considerations
T45 Contractor Logistics Support
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Parts Management Plan Builder 26 July 07
Summary of Changes to the
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
ISA 201 Intermediate Information Systems Acquisition
PSM Lessons Learned Background
Materiel Solution Analysis (MSA) Phase
Production Considerations
Milestone A to Milestone B Requirements Management Activities
Acquisition Sustainment Tool Kit (ASTK
Product Support Strategy Demonstrated Performance
Product Support BCA Exercise – JRATS/JTAMS
ISA 201 Intermediate Information Systems Acquisition
Test and Evaluation Considerations
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
A B C Solution Analysis Technology Maturation & Risk Reduction
Sustainment Reporting CADE Sustainment Reporting
Product Support Considerations
Adjustments required for program or funding changes Options
c EMD Focus Plan to define product support package & supply chain
Product Support Strategy
O&S COST MANAGEMENT: O&S COST INFLUENCE ON PROGRAMS
Fielding plan details and adjustments
Fielding plan details and adjustments
Product Support Strategy Demonstrated Performance
Presentation transcript:

JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program

Purpose Create a notional program and PSM to foster critical thinking – Create a scenario for a ‘new but experienced’ PSM checking in but no previous PSM to ask questions… – Large/multi-Service program with Service-Unique depot planning – Create tension from a program approaching the Pre-Milestone B/Request For Proposal DAB New O&S costs estimates exceed the previous cost goal “Why have a Use Case?” – To foster the ‘mentoring’ mentality that should be taking place – Consider how to apply the speaker and panel presentations 2 UNCLASSIFIED notional data for notional program

Joint Helicopter Program Helicopter being replaced is the “HH-66” SAR – IOC in 1990 with an estimated operational life of 5,000 flight hours and now needed ‘soon’ Draft Capability Production Document – Requirements for sustainment Understand changes from the Capability Development Document Ensure LCSP is updated to reflect them – Impact? UNCLASSIFIED notional data for notional program 3

Joint Helicopter Program Acquisition Strategy – Competition and down selection Guide the Source Selection Criteria for sustainment – Intellectual Property – Other? Impact to CORE workload considerations – Non-Developmental Item approach Should mean less unique sustainment acquisition Opportunities to leverage existing capabilities Better cost data fidelity UNCLASSIFIED notional data for notional program 4

Joint Helicopter Program Request for Proposal (RFP) – Short Engineering and Manufacturing Development Phase Less time to develop unique sustainment (if required) Impact to Organic Depot Stand Up? – Includes Low Rate Initial Production Look ahead to supporting OT&E and first unit fielding Transition to Organic capability – Field Service Representatives » How Many? How Long? – Training Materiel Updates – Tech Data Updates UNCLASSIFIED notional data for notional program 5

Joint Helicopter Program Fleet of 400 operated by the Army, Navy, Marine Corps, and Air Force – Replaced System Sustainment Plan – More fuel efficient – More reliable Is it cheaper to operate than legacy helo? Why or Why Not? UNCLASSIFIED notional data for notional program 6

Joint Helicopter Program “Interim Contractor Support (ICS) until four years after the first Initial Operational Capability” – Is this necessary? NDI acquisition? – Leverage existing capability? “Includes all training systems” – Sustainment and throughput Good PBL/Partnering Candidate? UNCLASSIFIED notional data for notional program 7

Joint Helicopter Program LCSP – Support equipment is GFE and sustained by contractor Does this make sense? “Each Service would stand up organic government Depots” – Is this least-cost? – Other benefits? – When does throughout justify additional repair lines? Service-unique school houses to train the operators and maintainers – A Sustainment Business Case Analysis (BCA) should be performed to prove that this is the ideal strategy for the system UNCLASSIFIED notional data for notional program 8

Milestone A Quad Chart UNCLASSIFIED - notional data for notional program 9 LCSP Update Product Support Strategy Final Metric HH-60 Actual JHP Original Goal JHP Current Goal Current Estimate / Actual Materiel Availability 58.4%83% Materiel Reliability: 20.5 hrs 0.25 hrs >28.5 hrs >0.30 hrs >28.5 hrs >0.30 hrs >28.5 hrs >0.30 hrs Mean Down Time 26.0 hrs≤20.8 hrs O&S Cost (BY2013$M) $32.62M $30.58M Sustainment Schedule O&S Data (Annual BY2013$M) 1 MS B MS C IOC FRP FY12 FY14 FY16 FY18 FY20 FY22 Contract Award  Performance based strategy throughout life cycle  2-level Mx Concept (same as HH-66)  ICS then transfer to Organic (O & D)  Field Service Rep (FSR) support O-level Issues  None Resolution  None BCA CDR IOT&E FSR Support Organic O Lvl CLA Metrics Data 9 Draft BCA Interim Supply Support BCA MTBCF MTBM MS A Sustainment Approach Date: Feb 12, 2013 LCSP Final Draft Organic D Lvl LCSP Update Final Draft LCSP Update Final Draft Cost Element HH-66 Estimate BY2013$K/system/year JHP Estimate BY2013$K/system/year 1.0 Unit-Level Manpower$892.13$ Unit Operations$562.11$ Maintenance$2,415.00$1, Sustaining Support$21.25$ Cont. Sys Improvements$ Indirect Support$84.09$73.31 Total$4,078.08$3, Total O&S CostsHH-66JHP BY2013$M$32,624.66$27, TY$$37, Note 1: Quantity of 400 aircraft with a service life of 20 years each.

QUESTIONS? UNCLASSIFIED - notional data for notional program 10