PERMITTING CHALLENGES FOR THE NEW GENERATION OF NUCLEAR POWER PLANTS Ping Wan Bechtel Power Corporation Ninth Nuclear Utility Meteorological Data Users.

Slides:



Advertisements
Similar presentations
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
Advertisements

TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
CURRENT METEOROLOGICAL HAPPENINGS THE SITING AND ACCIDENT CONSEQUENCES BRANCH DIVISION OF SITE AND ENVIRONMENTAL REVIEWS OFFICE OF NEW REACTORS Brad Harvey,
Annual Inspections of First Nation Water and Wastewater Facilities Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater.
Reuse / Revitalization. What is Reuse / Revitalization? Restoring contaminated and potentially contaminated sites to productive use.
Part III Solid Waste Engineering
1 Extension of Construction Authorization for the Mixed Oxide Fuel Fabrication Facility David Tiktinsky Senior Project Manager Division of Fuel Cycle Safety,
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
Acumen7 1 Accelerating UK Nuclear New Build Tony Roulstone July 2006.
Nuclear power plant siting International Nuclear Power Conference October 23, 2009, Tallinn.
1 The Challenges Facing New Generation Capacity An overview and discussion Paolo Gaio Westinghouse International NPP.
School for drafting regulations Nuclear Safety Combined licensing approach Vienna, 2-7 December 2012 Tea Bilic Zabric.
Advancing the Commercialization of Small Modular Reactors Michael Kurth American Nuclear Society & Washington Internship for Students of Engineering.
Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.
Engineering Technology Division
The Nuclear Renaissance & Research Opportunities in the Nuclear Field Dr. Annie Kammerer PEER NEES Quake Summit 2010 San Francisco, California October.
Challenges in developing a Safety Case WG5. How to Develop a Safety Case SC can be a tool for providing information to stakeholders other than regulators.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Ashley Finan, 2006 Page 1 Nuclear Energy and Oil Sands? Ashley Finan Massachusetts Institute of Technology Department of Nuclear Science & Engineering.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
Comanche Peak Nuclear Power Plant Existing and Proposed Units American Society of Civil Engineers Dallas Chapter November 1, 2010.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
ESP / COL Applications Meteorological Data Requirements and Regulatory Conformance Issues Ping Wan Bechtel Power Corporation The Eleventh Nuclear Utility.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
Nuclear Power Plant New Build Activity: A Market Overview
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
13 th Nuclear Utility Meteorological Data Users Group Meeting Lessons Learned From Establishing Design- and Operating-Basis Regional Meteorological Conditions.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
4/2003 Rev 2 I.4.7 – slide 1 of 48 Session I.4.7 Part I Review of Fundamentals Module 4Sources of Radiation Session 7Nuclear Reactors IAEA Post Graduate.
Atoms for Peace +50 Andy White – President & CEO, GE Nuclear Energy.
1 Standards Database Initial Development Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) March 1, 2011
Nuclear Industry QA Initiatives and Opportunities ASQ Southern Jersey Section October 22, 2008 Dinner Meeting October 22, 2008 Dinner Meeting Tom Mudge.
Plant Parameter Envelope for Early Site Permits
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Reiner W. Kuhr Executive Consultant University of Calgary November 2, 2006 PBMR Oil Sands Applications.
Nuclear Power Plant Hearing Combined Construction Permit and Operating License.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD.
Licensing of a Potential Geologic Repository at Yucca Mountain Lawrence Kokajko, Director Division of High-Level Waste Repository Safety U.S. Nuclear Regulatory.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
Wingra Engineering, S.C.1 Evaluation of Gas Turbine Air Quality Impacts from a Community Perspective Steven Klafka, PE Wingra Engineering, S.C Electric.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Briefing on the Pebble Bed Modular Reactor Portfolio Committee on Public Enterprises 18 February Top Secret - 1.
PP571.1 The Prospects for New Nuclear Construction Eugene S. Grecheck Vice President Nuclear Support Services ANS Virginia Section Meeting March 16, 2004.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
Nuclear Power Reactors
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
1 EVALUATING DIVERSITY IN DIGITAL I&C SAFETY SYSTEM DESIGNS Michael E. Waterman Digital Instrumentation and Controls Branch Division of Engineering Office.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
South Carolina Perspective on Part 61 Proposed Revisions
Water Reclamation Plant Feasibility Study Update May 28, 2014
Nuclear Power Update for The Society of American Military Engineers
Adding Nuclear Power to the Grid
Plant Parameter Envelope for Early Site Permits
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Small Modular Reactors: T’s & C’s
Presentation transcript:

PERMITTING CHALLENGES FOR THE NEW GENERATION OF NUCLEAR POWER PLANTS Ping Wan Bechtel Power Corporation Ninth Nuclear Utility Meteorological Data Users Group Meeting October 2003

2 Applicable Regulatory Process 10 CFR Part 52 Process Design Certification Early Site Permitting Combined License (Only design certification process has been demonstrated.)

3 Licensing Process Comparison

4 Major Parts of An ESP Application Part 1 – Administration InformationPart 1 – Administration Information Part 2 – Site Safety Analysis ReportPart 2 – Site Safety Analysis Report Part 3 – Environmental ReportPart 3 – Environmental Report Part 4 – Emergency Response PlanPart 4 – Emergency Response Plan

5 Key Features of ESP Process To demonstrate the suitability of a site without defining and evaluating the acceptability of a particular plant design An ESP is in effect for 10 to 20 years.

6 Permitting Challenges ESP Application Format and Content Maintaining flexibility in deployment of future nuclear technologies Selection of ESP Site Concept of Alternative Site Review

7 Application Format & Content No specific regulatory guidance documents available Most ESP Applicants follow the Format & Content of the NRC Staff Standard Review Plans: – –NUREG 0800 – –NUREG 1555 – –NRR RS-002 (draft)

8 Technology Flexibility that Provides a Broad Overall Outline of a Design Concept.Develop A Technology Neutral Approach that Provides a Broad Overall Outline of a Design Concept. Employ Plant Parameter Envelop Concept.

9 Technology Flexibility PPEs are the single largest (or smaller) value for each parameter, based on engineering, safety and environmental Conservatism.PPEs are the single largest (or smaller) value for each parameter, based on engineering, safety and environmental Conservatism. – –Review Current advanced nuclear technologies – –Collect vendor information – –Define and select bounding plant parameters

10 ABWR ( Boiling Water Reactor ) ESBWR (Boiling Water Reactor) AP-1000 (Pressurized water Reactor) ACR-700 (Light Water Cooled Reactor) IRIS (Next Generation PWR) PBMR (Pebble Bed Modular Reactor) GT-MHR (Gas Turbine Modular Helium Reactor) Advanced Nuclear Power Plant Designs

11 Technology Flexibility / PPE Not to be limited to the seven designs To provide a broad overall outline of a design concept To include other potential designs if they can be demonstrated to fall within the parameter values provided in the PPEs

12 ESP Site Selection Deregulation of Power Industry Concept of “ Region of Interest ” for New Electric Power Generation Merchant Plant Operates in Competitive Marketplace The decision for an ESP Site is Fundamentally a Business Decision.

13 ESP Site Selection Benefits of Co-locating at an Existing Nuclear Plant Site Extensive site information and environmental studies Existing infrastructure Reduce Environmental Impacts and Construction Cost Local community acceptance

14 Alternative Sites Review Objective : To verify there are no “Obviously Superior Sites” Identification of Candidate Sites Evaluation Criteria Site Ranking Process

15 Candidate Sites Site Criteria Not pose significant issues Not degrading local resources Not significantly impacting the surrounding environment Not to be located in proximity to major population centers

16 Candidate Sites Sites Considered: Greenfield - Undeveloped Sites Brownfield – Previously Developed Sites Federal Facility Sites Existing Nuclear Power Plant Sites

17 Evaluation Criteria Environmental (local population, groundwater, ecology, waste) Sociological (Socioeconomic benefits, environmental justice, land use) Engineering (site size, cooling water source, seismic, environmentally sensitive areas) Economic (electricity/market projections, transmission line access, stakeholder support)

18 Site Ranking Process Ranking Criteria Weighting Factors Overall Site Merit Scores

19 Summary of Challenges Technology Flexibility – Conservatism Inherent in PPE Concept “ Region of Interest ” for Power Generation – NRC Acceptance Co-locating at an Existing Nuclear Power Plant Site – Full Justifications Required