January 23 rd, 2008 CNGS & OPERA status Yves Déclais 1 I) CNGS status radiation damage on electronics strip line repair II) OPERA issues Based on the work.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of.
20/01/09 OPERA general meeting Nagoya CNGS report.
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
December 8 th, 2006Detector Construction status report Yves Déclais 1 OPERA Detector Preparation 1. Electronic Detectors: status of installation 2. Brick.
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
New results from the CHORUS Neutrino Oscillation Experiment Pasquale Migliozzi CERN XXIX International Conference on High Energy Physics UBC, Vancouver,
Now2008 Paola Sala for the CNGS SBWG CNGS status Paola Sala, INFN Milano on behalf of the CNGS Secondary beam working group.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
CNGS Operation Results 2008 Edda Gschwendtner AB/ATB on behalf of the CNGS team.
Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
The CNGS Operation and Perspectives l Edda Gschwendtner, CERN.
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
Mechanical and fluidic integration of scintillating microfluidic channels into detector system 1 Davy Brouzet 10 th September 2014.
Radiation Environment at AWAKE Silvia Cipiccia, Eduard Feldbaumer, Helmut Vincke.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
The OPERA long baseline neutrino experiment: status and first results Luigi Salvatore Esposito Laboratori Nazionali del Gran Sasso on behalf of the OPERA.
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
CNGS PROJECT STATUS D.Autiero 21/5/2003 General status 2003 Project review CNGS upgrade.
ATC/ABOC days, 24 January 2007Edda Gschwendtner1 CNGS : Status and Outlook Edda Gschwendtner, AB/ATB Summary of CNGS 2006 Reflector Repair OPERA Brick.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Muon absolute flux measurement in anti-neutrino mode A.Ariga 1, C. Pistillo 1, S. Aoki 2 1 University of Bern, 2 Kobe University.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
Update on radiation estimates for the CLIC Main and Drive beams Sophie Mallows, Thomas Otto CLIC OMPWG.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
Status and oscillation results of the OPERA experiment Florian Brunet LAPP - Annecy 24th Rencontres de Blois 29/05/2012.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
2008 European School of High-Energy Physics - Trest, Czech Republic - 19 August - 1st September Target Tracker Data Analysis In OPERA Experiment S. Dmitrievsky,
LHCf collaboration meeting, Nagoya, January 2009A. L. Perrot LHC news A. L. Perrot CERN, EN/MEF-LE LHCf collaboration meeting, Catania, 6 th July 2009.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
Matters arising RADWG - 3 July 2009
CALIFES 2015 run preliminary results
Heating and radiological
Irradiation test of Commercial (BASLER) digital cameras
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Measurements and FLUKA Simulations of Bismuth and Aluminum Activation at the CERN Shielding Benchmark Facility(CSBF) E. Iliopoulou, R. Froeschl, M. Brugger,
CNGS Run 2007: Radiation Issues
Preparation for CERN test beam
Radiation protection of Linac4 M. Silari Radiation Protection Group
Status of the OPERA experiment
Target and Horn status report
OPERA Stato dell’esperimento Run 2007
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
C100 Activation Status and Projections JLab Ops Staytreat 2016
Damage Levels V. Kain AB/Co
Presentation transcript:

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 1 I) CNGS status radiation damage on electronics strip line repair II) OPERA issues Based on the work done by the CNGS/SBWG and the report given to RPC08 by I. Efthymopoulos proton intensity for the 2008 run OPERA experiment status

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 2 Radiation damage on electronics

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 3 CNGS Electronics - underground Designated “radiation safe” areas for electronics

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 4 Ventilation Electronics - Layout Temperature Probes Ventilation Units Target Chamber Service Gallery Proton Beam Line …electronics equipment Ventilation Chamber Junction gallery

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 5 Electronics Racks inside the Service Gallery Ventilation ducts (to be moved)

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 6 Installed ventilation equipments Unit 231 Ventilation duct Service Gallery TSG4 Unit 232 TSG44 Balcony TCV4 Location of broken PLC

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 7 Junction Gallery

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 8 Radiation field – FLUKA simulation Energetic (>20 MeV) hadron fluence (/cm 2 /yr 1 ) for a nominal CNGS year of 4.5E19 pot ~ 10 7 – 10 9 h/yr A.Ferrari, et. al., 2007 Location of observed failures Can create Single Event Effects on electronics (bit flip, single event upsets...) A fluence of ~10 9 h/yr would correspond to ~19 failures/yr per device

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 9 Radiation field – FLUKA simulation Total dose in Gy/y for a nominal CNGS year with 4.5E19 pot ~ 0.1 – 10 Gy/y A.Ferrari, et. al., 2007 Commercial electronics typically do not fail below 1 kRad (10 Gy)

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 10 Radiation field – FLUKA simulation ~ 10 9 – n/cm² A.Ferrari, et. al., 2007 Commercial electronics typically do not fail below n/cm 2 1 MeV eq. neutron fluence (cm -2 yr -1 ) for a nominal CNGS year of 4.5 E19 pot

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 11 Radiation effects on electronics  The ventilation electronics that failed were installed along the TSG4 gallery next to the ventilation ducts and in the TCV4 balcony  In both areas the radiation levels as predicted by the simulations are far too high for COTS components  the electronics should have failed and they did !  No failures to electronics in the TSG4 “safe” area were observed  Should not have happened according to simulations for the beam intensities we had, however  would have happened if we were running longer...  During the 2007/2008 shutdown, work is organized to remedy the problem and assure nominal running of the facility for 2008 and beyond.

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 12 Actions for 2008 shutdown General guideline:  Move whatever is possible of the electronics out of the CNGS tunnels  For the equipment, which needs/must stay in the area:  Create a “radiation-safe” area by adding adequate shielding and move all the electronics in there  Address the sensitivity to radiation of the installed electronics and investigate upgrade possibilities to rad-tol components  Assure a MTBF – of at least 1 year  redundancy and preventive maintenance actions  Install radiation monitoring system for electronics as in LHC

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 13 Ventilation duct layout TCV4 TCC4 TSG4 old TCV4 TCC4 TSG4 new Shielding plugs

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 14 New shielding plugs – TSG4 & TSG41

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 15 Status  The layout modifications will have no impact on operation and design principles of CNGS  However, access rules, procedures and dose estimates for maintenance operations need to be updated  Simulation studies are ongoing to estimate the radiation field for the electronics  Preliminary results with “ideal” shielding (minimal penetrations) show a reduction of at least 10 4 in the high energetic hadrons, reality could be x10 lower  Work is ongoing to implement the final shielding geometry as to be built.  Basically no work will be executed close to the “hot” areas in TCC4. In the rest of the areas the radiation levels are rather low.  Nevertheless, for the planning and execution of the works in-situ the same procedures as with the horn repairs will be followed  Optimization of design and execution taking into account RP and safety constraints  Detailed planning of activities in parallel to dose planning  Supervision of the works/workers in-situ ; use of appropriate materials for RP and waste handling

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 16

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 17 Ventilation: modified layout in TSG41

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 18 Shielding layout in TSG41

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 19 Tentative Schedule of the work Very tight schedule:  no contingency,  1-2 weeks to be added for beam commissioning

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 20 Gy/yr for a nominal CNGS year of pot No shielding With shielding (caveat: the option simulated in TSG41 does not include the ventilation ducts)

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 21 1 MeV eq. neutron fluence (cm-2 yr-1) for a nominal CNGS year of pot No shielding With shielding (caveat: the option simulated in TSG41 does not include the ventilation ducts)

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 22 Energetic (> 20 MeV) hadron fluence (cm-2 yr-1) for a nominal CNGS year of pot No shielding With shielding (caveat: the option simulated in TSG41 does not include the ventilation ducts)

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 23 Fluences in front of the shielding

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 24 TSG41 shielding : preliminary results Fluence of high energy hadrons Absorbed dose [Gy per particle] simu

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 25 Strip Line Repair

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 26 Reflector flexible cable : Strip line  Failure observed only in the outer plate of the reflector  The break is due to material fatigue from the mechanical & thermal effects during pulsing, most likely enhanced by the treatment during construction (brazing, etc..)  Last minute discovery before the 2007 startup  Flexibles are needed to compensate for mis-alignment errors in the striplines and absorb the thermal dilation during operation

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 27 Reflector flexible cable : strip line Temporary measures taken in 2007 to continue with the run:  Insulating sheets installed on the flexible section  Protects against short-circuits  Installed on horn and reflector  Put an electrical by-pass in place  Ensure that current still flows in case last cable breaks  Installed on most outer reflector plate In shutdown 2008:  Design new flexible strip lines  Replace existing ones for both horn & reflector

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 28 Proton intensity for the 2008 run

January 23 rd, 2008 CNGS & OPERA status Yves Déclais run : SPS schedule 147 days max for the CNGS Spread over 23 weeks (Nominal CNGS year : 200days) May 29 th November 10 th

January 23 rd, 2008 CNGS & OPERA status Yves Déclais run : Super-Cycle SPS super cycle as in the proposal Proposed super cycle in 2008: Extended to 39.6 sec in 2007: 3 CNGS : 18 sec fix target cycle 16.8 sec (flat top 4.8  9.6 sec) MD cycle added (4.8 sec)  Adding LHC pilot cycle: 8.4 sec  super cycle = 48 sec !  tuning parameters: o replace the LHC pilot cycle (and MD cycle ?) by CNGS cycles when LHC R&D is off o reduce the flat top for fixed target experiments to 4.8 sec

January 23 rd, 2008 CNGS & OPERA status Yves Déclais run : expected statistics Expected 2008 runNominal CNGS Number of days Super Cycle (sec.) Circulating proton efficiency70%80%55% Integrated pot Total number of interactions2770 CC events2070 NC events455 Electron events16 Charm decay83 Tau candidate eV 2 )1.1 Minimal granted by CERN If no delay in the CNGS repair ~120 evts/week

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 32 Possible gain for the number of CNGS cycles (A) Nominal 2008 Super Cycle  3 CNGS / 48 sec 1800 CNGS/shift 1. (B) Reducing flat top to ~4.8 sec  3 CNGS / 43.2 sec 2000 CNGS/shift 1.11 (C) B + adding 1 CNGS cycle  4 CNGS / 49.2 sec 2341 CNGS/shift 1.30 (D) C + replacing LHC & MD by CNGS  6 CNGS / 48 sec 3600 CNGS/shift 2.00 (E) CNGS dedicated mode  1 CNGS / 6 sec 4800 CNGS/shift 2.7 Only way to increase the nb of pot and (or) compensate CNGS delay Example of an optimized week (for OPERA): scenario C during day shifts (working days) scenario D during night shift and WE Gain : ~1.7 This would imply up to ~200 evts /week Can OPERA handle this rate ?

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 33 OPERA issues: Status of the preparation of the OPERA experiment : Detector filling Electronic detectors Brick handling, processing, scanning In 2008, our main goal is to get a full year of data taking:  First OPERA year  First  candidates

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 34 Detector filling Remember what was the situation one year ago ! Warmest congratulations to the teams involved: Brick components (Lead & CSd), BAM & BMS Coordinated in a Kaisen way by Salvatore June 10 th July 28 th October 25 th Achieved ! Including 15% contingency (~3 weeks)

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 35 Electronic Detectors SM1 Veto BMS Target tracker SM2 Spectrometer: XPC, HPT, RPC, magnet  all installed & commissioned  DAQ validated, data transfer onto the DB implemented  data analysis tools being tuned on real data ! o HPT reconstruction still to be validated o Event reconstruction & Brick Finding:  more data needed for a complete tuning

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 36 Brick Handling, Processing & Scanning This subject was the purpose of this Workshop  it was a very fruitful meeting, organized in a smart way thanks to Nakamura san, Hoshino san, Sato san & Kodama san  better to look at the summary reports from the Working groups Recommendation: 1)Do not underestimate the amount of work for a nominal OPERA year with 5200 events  this year 320 shifts to be fulfilled for the film development  improving the track finding efficiency in the CSd is an issue 2)Quality control is essential during the brick processing

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 37 CONCLUSION Looking forward to discuss the first Tau candidates next year in Nagoya Keep your fingers crossed … in your mind, you need your hands for working !

January 23 rd, 2008 CNGS & OPERA status Yves Déclais 38 title