Copyright © 2008 Industrial Committee on Program Management. All rights reserved. Predictive Measures of Program Performance June 9, 2008 Industrial Committee.

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
1 Earned Value Management a tool for project Portfolio management Jim Strong DLMP PMO Director.
Project Cost Management Chapter 7
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
Monitoring and Information Systems
Project Cost Management Estimation Budget Cost Control
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
 Galorath Incorporated Parametric Performance Monitoring and Control (PPMC) Presented by: Karen McRitchie Galorath Incorporated 100 North Sepulveda.
Chapter 10: Monitoring and Controlling Change
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Earned Value Management
Cost Management Week 6-7 Learning Objectives
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Eleanor Haupt Aeronautical Systems Center Lloyd Carter
Project Management Methodology Project monitoring and control.
Jeff Sestokas November 10, 2009 ARA Project Manager Course Introduction Project Management for ARA Engineers and Scientists.
1 RELATIONSHIP-OBJECTIVE ANALYSIS Getting Full Value From Earned Value With a Value-Added Way of Looking at Performance Measurement Presented at the 14th.
Dave Bachman DAU / CDSC September 9, 2004
© SYBEX Inc All Rights Reserved. Session 10 Project Control.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Software project management (intro)
Project Cost Management
Software Project Management (SPM)
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
Copyright © 2008 Industrial Committee on Program Management. All rights reserved. Predictive Measures of Program Performance March 19, 2009 Industrial.
Copyright © 2008 Industrial Committee on Program Management. All rights reserved. NDIA PMSC Baseline Stability Working Group May 2009 Neil Albert Pete.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Where Module 04 : Knowing Where the Project Is 1.
Understanding Earned Value Management & Analysis Abba Consulting Federal Acquisition Conference & Exposition Washington, DC June 19-20, 2007 Wayne Abba.
Presented by Niyi Ladipo September 14,  Results of the Survey  What is Earned Value Management (EVM)?  EVM vs. Traditional Cost Management 
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
0 Earned Value Management. 1  What is it?  Where did it come from?  What’s so special about it?  How do you do it?  What is an EVMS?
Copyright 2015 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
The Project Management Process Groups
EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY.
Schedule Control (Earned Value)
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
“PMP® Exam Prep” Earned Value Management
Project COST Management
CHAPTER:7 Project Cost Management
Establishing and Managing a Schedule Baseline
Project Cost Management
EVM 202—Lesson 7 Tools Analysis Case Study
September 2016 EVM 202—Lesson 8 Integrated Product Team (IPT) Analysis and Performance Case.
Earned Value Management
Earned Value - What is it
Dave Bachman DAU / CDSC September 9, 2004
Integrated Program Management Case Study Briefing
EVM 202—Lesson 7 Tools Analysis Case Study
LSST Project EVMS Performance Overview Kevin E
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
Earned Value Management
Evaluating the Estimate at Completion (EAC)
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. Predictive Measures of Program Performance June 9, 2008 Industrial Committee on Program Management (ICPM)

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. 2 Members BAE SystemsSusan Dong Battelle Bill Altman Bell Helicopter Bob Kenney Boeing Steve Goo BoeingRandy Steeno Honeywell Keith Munson Honeywell Tracie Thompson Lockheed Martin Peter Wynne Lockheed MartinSteve Stern MCR Neil Albert Northrop Grumman Marilyn McAlice Northrop Grumman Kevin Carpenter Raytheon Skip Burns Rockwell Collins Ron Hornish SI International Bill Chadick ArmyCraig Tallman NAVAIRDave Burgess NAVAIRTed Rogers USAFLtCol Fred Gregory

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. 3 Agenda Recap from last NDIA Meeting Common Definitions Plan and Next Steps Help Needed

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. 4 Recap from NDIA Meeting

METRIC DEFINITION Metric Name: Metric Backup Cost Performance Index (CPI) Purpose of Chart: Compare the value of work performed to the actual cost of that work to determine how efficiently work was performed – “bang for the buck” as one element to assess program progress Deployment Criteria / Linkage : NDIA Industry Standard Metric. Links to SPI, CPI-TCPI Source of Data: Program Management, Program Control Finance Benchmark/Comparative Data: None at this time Applicable Life Cycle Phase: All (Development, Production, Sustainment) Predictive / Leading Qualities: When trended, indicates patterns that can be used to project an outcome based on time phased actual performance Warning Signs & Actions to Take: When rolling average less than 0.95, identify root cause and take corrective action Metric Definition: This metric is the ratio of budgeted cost of work performed (BCWP) divided by actual cost of work performed (ACWP). BCWP / ACWP = % Comp * total BCWS / ACWP [(% Comp * total budget hours) / actual hours] Rating =1.00: On-cost; CPI 1.00: Positive cost Blue: CPI > 1.00; Green: 0.95 < CPI < 1.00; Yellow: 0.90 < CPI < 0.95; Red: CPI < 0.90 Creation Date: 05/16/08 Revision Date: 06/05/08

METRIC DEFINITION Metric Name: Metric Backup Schedule Performance Index (SPI) Purpose of Chart: Compare the value of work performed to the value of work scheduled Deployment Criteria / Linkage : NDIA Industry Standard Metric. Links to CPI Source of Data: Program Management, Program Control Finance Benchmark/Comparative Data: None at this time Applicable Life Cycle Phase: All (Development, Production, Sustainment) Usage Assumption: SPI should be used in conjunction with detailed schedule milestone metrics (late start, late finish, etc.) Predictive / Leading Qualities: When trended, indicates patterns that can be used to project an outcome based on time phased actual performance Warning Signs & Actions to Take: When rolling average less than 0.95, identify root cause and take corrective action Metric Definition: This metric is the ratio of budgeted cost of work performed (BCWP) divided by budgeted cost of work scheduled (BCWS). BCWP / BCWS = % Comp * total BCWS / BCWS [(% Comp * total budget hours) / budget hours] Rating =1.00: On-schedule; SPI 1.00: Ahead of schedule Blue: SPI > 1.00; Green: 0.95 < SPI < 1.00; Yellow: 0.90 < SPI < 0.95; Red: SPI < 0.90 Note: SPI does not guarantee that the work completed is the same work that was planned and should be used with detailed milestone metrics. Creation Date: 05/16/08 Revision Date: 06/05/08

METRIC DEFINITION Metric Name: Metric Backup Estimate at Completion (EAC) Purpose of Chart: Measure the estimate of total cost for authorized work (EAC) including actual costs plus estimated costs to complete Deployment Criteria / Linkage: NDIA Industry Standard Metric. Links to SPI, CPI, Average Cost, Burn Rate Source of Data: Finance Benchmark/Comparative Data: None at this time Applicable Life Cycle Phase: All (Development, Production, Sustainment) Usage Assumption: EAC should be used in conjunction with other metrics: 1) schedule completion, 2) performance to date, 3) remaining work and its anticipated performance, 4) rates, 5) outstanding commitments, 6) approved and/or pending scope changes, 7) funding constraints, 8) subcontractor EACs, and 9) program risks and opportunities Predictive / Leading Qualities: When trended, provides a comparative analysis (objective indicator) of projected outcomes based upon actual performance Warning Signs & Actions to Take: If Program EAC is less than CPI-derived EAC, understand the differences; if not rationalized, take management reserve against EAC to align with statistical EAC. Metric Definition: Management's assessment of probable outcomes based on current relevant information (i.e. performance to date), realistic plans and assumptions, cost quantification of risks and opportunities (e.g. cost to mitigate risks and opportunities with cost reductions), comparison/usage of available management reserve, sound management judgment, and the proper inclusion of financial assessments and assumed liabilities. Compares Program “Grass Roots” EAC with forecasted EAC calculated based upon past performance. Key Attributes/Thresholds: IPT EAC CUM CPI EAC 6-month EAC Creation Date: 05/16/08 Revision Date: 06/05/08 NORTHROP GRUMMAN PRIVATE/PROPRIETARY–LEVEL 1 NORTHROP GRUMMAN PRIVATE/PROPRIETARY–LEVEL 1 Stat EAC vs. EAC Jul-05Aug-05Sep-05Oct-05Nov-05Dec-05 $ in Millions IPT EAC Cum CPI EAC 6 Mos EAC

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. 8 Plan & Next Steps Determine Metrics Determine Metrics Define Relevant Predictive Metrics Define Relevant Predictive Metrics Determine Alarms, Warning Signs & Actions to Take Determine Alarms, Warning Signs & Actions to Take Coordinate Metrics with Working Group Coordinate Metrics with Working Group Finalize Metric Definitions Finalize Metric Definitions Propose Metric Definitions to NDIA Propose Metric Definitions to NDIA 4/30 5/16 5/23 6/6 6/9 3/17 Estimate at Completion (EAC) Cost Performance Index (CPI) Schedule Performance Index (SPI) Approved? Analyze Aggregate Relationship(s) Analyze Aggregate Relationship(s) Select Next Metrics Yes No

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. 9 Help Needed None

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. 10 BACKUP

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. 11 Charter & Objective – Program Measures & EVM Charter Facilitate the use of predictive measures including earned value to ensure program success Meeting frequency Period of performance Objective Communicate a set of predictive measures that will help contractors and their government counterparts predict program performance (early enough to make corrective action effective) and understand root causes of performance –Predictive measures that cover the program’s lifecycle from pre- award through contract close-out –Predictive measures that can be tailored to the contract characteristic, contract type, and phase of the program Recommend joint next steps

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. 12 Commonly Measured Predictive Metrics Metric CategoryExamples EVM Cost PerformanceCPI vs TCPI Estimate at Completion (EAC)IEAC vs Program EAC Staffing (Critical Skills)Open Requisition/Aging, Fill Rate Risks and OpportunitiesRisk Burndown & Opportunity Capture integrated with MR; MR Burndown, %ETC, Risk Register Schedule (IMS) Quality & PerformanceSPI, BEI, CPLI, Float, Late Starts/Finishes Requirements Definition & StabilityAdded, Changed, Deleted Requirements, Volatility, Validation, TBD Burndown Technical Performance MeasuresSLAs, TPP, KPP Contract HealthUCAs, Volume, Traffic, Requests, Funding Profile Supply Chain PerformanceCost, Schedule, Quality, Delivery Performance, Process Compliance 30/60/90 Day Look AheadSignificant Upcoming Milestones/Events Comparison Top Issues & Action ItemsCorrective / Preventive, Latency, Product QualityDefect Rate (Actual vs Predicted), Timeliness of delivery Program Financial SummaryBillings, Expenditure Profile, Funding ResourcesInfrastructure, Availability of PP&E, GFE Availability & Quality Customer SatisfactionCPAR, BPAR, Award Fee, Survey Productivity VariancePlan vs Actual Component per Unit