OTTAWA STREET POWER STATION REHABILITATION AIA Michigan 2013 Honor Awards Program Category: Building.

Slides:



Advertisements
Similar presentations
Meeting the Secretarys Standards: NPS Guidance on Special Issues Gary Sachau, National Park Service Historic Tax Credit Developers Conference St. Pete.
Advertisements

Eligibility and Standards James Garrison Arizona State Historic Preservation Officer.
Modernizing Modernism: Challenges with Preserving Post-War Buildings National Historic Tax Credit Conference Chicago, Illinois September 25, 2008 The Inland.
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Investment Opportunity
Andrew renfree PULSE - home. andrew renfree PULSE - home.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Skyscraper Construction
Beloit College. Master Plan Goals Create a Vision for the Next 25 Years Enrich the legacy of the campus Manifest the Strategic Plan in the campus facilities.
Hawthorne Plaza 715 N. 9 th Street Salina, Kansas
ACCESSIBILITY: A CODE COMPLIANCE AND EXISTING CONDITIONS ASSESSMENT AND SURVEY OF THE LIMERICK TOWN HALL MAIN STREET LIMERICK, ME ttl-Architects LLC 28.
Project Title Eli and Edythe Broad Art Museum Award Category Building.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Passive Heating and Cooling
City of Scottsdale Senior Center at Granite Reef
“TOD” Development Opportunity Case Studies for Reference & Historic Preservation Opportunities Moline, Illinois October 18, 2011.
th Street - Matarozzi/Pelsinger Building By Eric Bobrow.
2012 Heartland Design Awards. A bold, dramatic and dazzling dining room sets the tone for a modern redesign of a single-family home in the suburbs. This.
Zhuhai, China. Planning and Design Rationale Design Concept The concept consists of a complex of three distinct yet richly connected.
Old Mankato Railroad Station By: Ryan Carlson Adam Otto.
Intersections Plan Outcomes  Skyway system  Downtown population  Hiawatha Light Rail Corridor  New cultural assets  Target Field  Historic.
INTERIOR WALL FINISHES
BECOMING GREEN Santa Margarita High School Academic Building.
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Solar thermal energy Eng. Elamir Ahmed. Definition of solar thermal energy  Solar thermal energy is a renewable energy source.  Solar thermal uses technology.
U Building Area: (sf) 2,500,000 SF Anticipated date of completion: Estimated Completion 2012 Location of Project: Miami, FL Type of Project: Mixed-use.
Name: Ieoh Ming Pei Nationality: American Birth date: April 26, 1917 ( ) (age 92) Birth place: Guangzhou (Canton), China Work Practice name: Pei.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Land Use Study for the Community of Winchester May 21, 2012.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
Alex Raver Mike Zeeck Deric Wallace Joe Roach Lumiere Place - St. Louis  Floating floor casino  Under budget  Mixed use building Alex Raver.
Green Building Residential Construction
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
City Council 2642 Second Street Appeal of Landmarks Commission Approval of Certificate of Appropriateness 07CA-009 February 12, 2008.
The Role of Compact Storage in Green Building Design Program No.: CSGBD Provider Name: Spacesaver Corporation Provider No.: J197.
City of Brisbane Open Space & Ecology Committee April 27, 2006 Baylands EIR Scoping.
Schematic Design Proposal Dan Rusnack 11/14/03 Lighting/Electrical option Thesis project The Hall Corporate Headquarters.
The Terry Thomas Sustainable and Ecological Architecure By: William Wenik.
Wegmans Fairfax Schematic Design Joseph Lookup The Pennsylvania State University 5 th Year - Architectural Engineer Lighting/Electrical.
International Downtown Association 2013 Downtown Achievement Awards Downtown Transformation Initiative Battle Creek, Michigan.
GROUP MEMBERS: Ramos Ivett # Lugo Valmore #
U Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction.
Intermodal Center / Multimodal Terminal Presentation Guidelines.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Formerly known as “91 Turkish” and part of the abandoned RJ Reynolds Tobacco Co. manufacturing complex, the historic rehabilitation of this property initiated.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Los Angeles County High School for the Arts Los Angeles, CA Design Concept Award HMC Architects 2008 Exhibition of School Planning and Architecture.
Robert M. Arnold Building Fred Hutchinson Cancer Research Center
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Wellspring Medical Center Clark/Kjos Architect, LLC.
7 Planning the Living Area Chapter. Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Identify the three.
Restoration is defined as the act or process of accurately depicting the form, features, and character of a property as it appeared at a particular period.
Cultural Resources office — St. Louis Planning & Urban Design Agency an introduction.
Potomac Hill Campus Master Plan Preliminary Planning Principles “Observing the Past, Planning the Future” Campus Master Plan Potomac Hill.
1 City of Portland Bureau of Development Services Staff Presentation to the Historic Landmarks Commission Type II Appeal of Approval LU HDZ –
Fundamentals of Construction
THIS IS JEOPARDY.
Fun Facts: James M. Bennett High School
A10.01 Project Description:
The AstroPower Headquarters Newark, Delaware
Erich Heneke Director of Supply Chain Mayo Clinic How does an Association need to Develop to become Sustainable?
By Adam Beneroff Manitoba Hydro Place.
Fundamentals of Construction GTT – Unit 7 – Green Architecture
A10.01 Project Description:
The Beehive House, Castledine Street, Loughborough
1 Semester Project Design A Multi Story Office Building
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
No. 4 Wood Street, Mansfield
Presentation transcript:

OTTAWA STREET POWER STATION REHABILITATION AIA Michigan 2013 Honor Awards Program Category: Building

Lansing’s Ottawa Street Power Station, located on the Grand River not far from the commercial center and state capitol, is a unique Art Deco masterpiece. Constructed in 1939 and 1946 as the region’s primary coal-fired electrical generation plant, the nine-story building’s exterior masonry color rises from black at its base through reds and oranges up to gold at its peak, turning the entire building into a stylized flame symbolizing the combustion of coal. Decommissioned in 1992, the building stood purposeless, challenging the design, development, and construction communities to find a strategy for reusing its largely floorless, 164 foot tall tower. Rising to that challenge, the design team, developers, contractors, and building users created a national corporate headquarters, fitting 122,000sf of Class A office space into the historic building and accommodating another 105,000sf in a compatible addition. Working closely together, they delivered the project on schedule and within the original budget, returning the building to its status as a local landmark. CHALLENGES & OPPORTUNITIES A riverfront site with significant pollution in a flood plain Views of building disrupted by later additions and adjacent construction Programmatic need for nearly 50% more floor area than building offered Significant cracking and movement of the exterior masonry Rusted, energy-inefficient windows No usable floor area in the former boiler stack Showplace turbine hall with significant volume, but limited floor area Exposed masonry walls with no insulation High style historic entry lobby hidden behind inappropriate alterations Visually intriguing steel structure with no fire protection Project Statement Ottawa Street Power Station Rehabilitation Accident Fund Holdings (client) Christman Capitol Development Company (developer)

DESIGN RESOLUTION Sculpted site to shift flood plan away from building Created pedestrian spaces adjacent to the river, established a pedestrian link to the adjacent street “C” shaped addition that reflects scale and materials of original building and established visual connection between new and old Extensive restoration of the complex masonry exterior, installation of new energy efficient windows with custom details to closely match look of original windows Created Revit model using laser point cloud technology, precluding dangerous and time- consuming field survey Removed excess original structure and installed significant structure to support new floor plates Hung new floors in turbine hall for necessary floor area while protecting the historic glazed tile walls, retained sense of space’s volume Engineered insulation of the exterior masonry walls to minimize vapor damage the walls; exposed masonry at exterior walls Reclaimed original Art Deco lobby; museum- quality restoration of unique lobby elements Created contemporary office space while retaining structural elements and industrial details SUSTAINABILITY The design team successfully incorporated sustainability into the design process to achieve LEED Gold certification. The building’s sustainable design features include 41% less water usage than typical new developments, a raised floor mechanical system distribution that gives employees temperature control in their workspaces, and low emitting interior finishes and furnishings. The design takes every advantage of the ample daylight to lessen energy use and ensure that every workspace benefits from ambient light and striking exterior views. Project Statement (continued) Ottawa Street Power Station Rehabilitation Accident Fund Holdings (client) Christman Capitol Development Company (developer)

The project connects the heart of downtown Lansing with its scenic riverfront. South and West Elevations Before

A contemporary design vocabulary for the addition provides a vibrant visual relationship between the old and the new. D

The scale and location of the addition reinforces the scale of the historic building while emphasizing the drama of its tower. The dark stone base and vibrant orange brick of the addition reinterprets the design of the original building while remaining respectful of its iconic status. North and East Elevations Before

The former service entrance was transformed to create an entry court where the historic building and its new addition meet. A glass atrium connects the two buildings and opens a path from the street to the riverfront. Before

A skylight atrium unites the historic building to the new addition, functionally and visually connecting the old and the new.

Skylights at the atrium echo the window pattern of the original building while offering a dramatic view of the historic tower. The restored original exterior windows now present interior views of the atrium and addition.

Before Transformation of the former coal yard into a plaza visually and functionally extends the employee dining room and creates a riverfront space for public events.

New floors provide necessary additional office space, but maintain the original turbine hall’s sense of scale by hanging from new beams. Careful detailing of the new and old beam intersections avoided damage to decorative elements of the historic glazed terra cotta walls. Before

A large industrial crane and steel doors are reminders of the building’s original use.

Before Brick walls and exposed original steel framing throughout the building are reminders of its original industrial use.

Exposed brick maximizes the visual impact of public spaces and circulation areas. Exterior walls in other locations are insulated with an engineered system to ensure that the walls are not damaged by condensation. Mechanical and electrical distribution through a raised floor system optimizes energy efficiency and user comfort.

The Art Deco lobby with its unique steel doors was carefully restored to its historic appearance.

J Historic Building New Bldg

ACCIDENT FUND NATIONAL HEADQUARTERS

The project transformed a polluted industrial site and obsolete power station into corporate headquarters with outdoor amenities and a public river walk that connects two city parks. South and East Elevations Before