The Boulou Fault Zone Its Geology and its Impacts on the Perthus Tunnel project The Boulou Fault Zone Eastern Pyrenees, France Its Geology and its Impacts.

Slides:



Advertisements
Similar presentations
Xing Zhang Yifan Zhang Fan Yang.  A Large-scale Coal Mine locates at this area.  The problem of subsidence here is quite serious.  Use TRANSIENT.
Advertisements

The Water Cycle Water is recycled through the water cycle.
Water Underground.
28.1 The Hydrologic Cycle Hydrological cycle: natural circulation of water from the oceans to the air, then to the ground, then to the oceans and then.
Yellow River Diversion Project Use of Tunnel Boring Machines to Divert the Yellow River, China John Train & Philippa Reed.
Design Parameters.
Illustrations of flow nets 3D6 Environmental Engineering II Dr Gopal Madabhushi.
Groundwater Control Affects design of: –Permanent Works –Temporary Works May affect viability of scheme Safety Issues –May cause instability of excavation.
STABILITY ANALYSIS IN PRESENCE OF WATER Pore pressures Rainfall Steady state flow and transient flow.
BLM National Training Center SPRING DEVELOPMENTS.
DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project.
Vadose Zone Hydrology (Land Surface to Phreatic Surface)
ENGINEERING GEOLOGY OF THE CHANNEL TUNNEL Richard Rae & Robert Hazelhurst March 2006.
Geological Problems Encountered and Solutions Implemented
FACTORS AFFECTING SLOPE FAILURE Introduction Sr. No Name of the parameters and properties Details 1Geological DiscontinuitiesFault, Joint, bedding plane,
1.3: Fresh Water Flows Underground Groundwater: Water held underground Permeable: A substance that liquids can flow through. Ex: coffee filter, soil,
Malpasset Dam Disaster
Field Borings and Cone Penetration Testing
Factors that Influence the Occurrence of Nitrate in the Upper Willamette Valley Basic Groundwater Hydrology Understanding Nitrate and its Distribution.
1 Teacher : Joanne Fernlund Welcome!! English is the language of the course.
G3 – Environmental Geomechanics (Dr Sam Yuen)
Hydrologic Cycle Groundwater. Water, water everywhere Oceans – 97.2% Ice – 2.15% Fresh water – 0.65%
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
LAGUNA at Fréjus LAGUNA/LAGUNA-LBNO General Meeting March 3 th -5 th, 2011, CERN Eng. Francesco Amberg.
1 GROUNDWATER HYDROLOGY AND CONTAMINANT TRANSPORT CEVE 518 P.C. de Blanc C.J. Newell 1.Porosity and Density Continued 2.Saturation and Water Content 3.Darcy.
Unit 01 : Advanced Hydrogeology Review of Groundwater Flow Malcolm Reeves Civil and Geological Engineering.
Tunnel Engineering for Indian Railways
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
Department of Civil Engineering,
Water Underground. How Water Moves Underground Water underground trickles down between particles of soil and through cracks and spaces in layers of rock.
What happens to rain or snow that falls on the ground?
Chapter 2 Fresh Water Section 5 Water Underground
Water underground MS. COULTER. How water moves underground  Water underground trickles down between particles of soil and through cracks and spaces in.
Geo-Engineering In North Wales A Study of the A55 Between Chester and Anglesey.
Scenarios 1.Tidal influence 2.Extreme storm surge (wave overtopping, max. limit 200 l/s/m, period 2 h) Outlook calibration and validation of 3D model transfer.
1 Lawrence Berkeley National Laboratory, University of California, Earth Sciences Division 2 University of Oslo, Department of Geophysics,
Water Resources A river runs through it…. Water: The Universal Solvent One of the most valuable properties of water is its ability to dissolve. This makes.
Unit 3 – Gradational Processes.  Stability is determined by the relationship between the driving and resisting forces.  Driving forces – move earth.
1 GROUNDWATER HYDROLOGY AND CONTAMINANT TRANSPORT CEVE 518 P.C. de Blanc C.J. Newell 1.Hydrologic Cycle and Water Distribution 2.Soil Horizons 3.Aquifers.
BUILDINGS. Shallow Foundations rafts pads strips Raft Pads.
Faults as fluid flow barriers and their role in trapping hydrocarbons Grp 2.
Construction Technology: Substructure DW57 34 Outcome 2 Methods of groundwater control.
Lecture 7 Mechanical Properties of Rocks
THE HYDROLOGIC CYCLE 2: GROUNDWATER. The Hydrologic Cycle - Fresh Water Storage Reservoir % of Total Fresh Water Glaciers (Frozen)76% Groundwater22% Rivers.
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
Groundwater Water Table Recharge Groundwater Hydraulic Gradient
Chapter 10 S3 Water Underground.
SITE INVESTIGATION.
Aquifer A body of rock or sediment that stores groundwater and allows the flow of groundwater.
Water In what ways have you used water today? How much water is used to make a 1KG burger?
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
GROUND IMPROVEMENT TECHNIQUES
Hydrology. Earth’s Water  Renewable resources can be replenished in a human life span.
CVE 515 EMBANKMENT DAM ENGINEERING ENGR S.O ODUNFA DEPT. OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA.
Radial Flow to an Unconfined Aquifer From Mays, 2011, Ground and Surface Water Hydrology.
Teaching Aids Service by KRRC Information Section.
MAIERATO, ITALY LANDSLIDE (2010)
Aquifers and Groundwater flow
Topic 3, Section 1: Elementary Plate Tectonics
Water Underground.
Ground Water.
Test 1 Review Chapter 1, Hydrologic cycle and the water balance
Patricia Gallagher, Ph.D., P.E. and Robert Swan
28.1 The Hydrologic Cycle Hydrological cycle: natural circulation of water from the oceans to the air, then to the ground, then to the oceans and then.
Department of Civil Engineering
Aquifer A body of rock or sediment that stores groundwater and allows the flow of groundwater.
Unit: Water and the Atmosphere
Water Underground.
Water Underground.
Presentation transcript:

The Boulou Fault Zone Its Geology and its Impacts on the Perthus Tunnel project The Boulou Fault Zone Eastern Pyrenees, France Its Geology and its Impacts on the Perthus Tunnel project Jonathan GERTHOFFERT Marc-Stéphane GINOUX 10/05/20151

CONTENTS Localisation Geology Hydrology Impacts on the Perthus Tunnel Project Solutions 10/05/20152

Localisation Eastern Pyrenees - France/Spain border High speed railway project between France and Spain  Perthus Tunnel excavated under the Pyrenees  Bitube km long  Excavation from the South to the North with TBM designed for good quality rocks 10/05/20153

Geology The Boulou Fault zone:  Part of a large ductile shear zone  25 km long  Dip to the North  Dip angle between 50˚-70˚  Crossed perpendicularly by the tunnel over a distance of 50 meters 10/05/20154

Geology 5 FRANCE SPAIN Pyrenees Source: SEA CONSULTING

Geology Rock composition from the South to the North  Gneiss  Weathered Gneiss  Gneiss Gouge  Fault Gouge  Schist Gouge  Weathered Schist  Schist Top soil  1m deep, clay, fault gouge, very fractured 10/05/20156

Geology 7 FAULT ZONE Stream Source: González et al.

Hydrology High groundwater level Stream at the surface Links with deep thermal sources Abundant presence of clay in the fault gouge due to an old thermal water circulation over the fault plan >>> Fault zone has a low permeability and saturated soil 10/05/20158

Engineering aspect Very bad rocks and low depth excavation (~15 m)  High risk of overexcavation and cave-in  Important settlements at the surface  High risk of water infiltrations  Living area above the tunnel Interception of the geological structure producing thermal sources  Risk of important modification of the aquifer 10/05/20159

Engineering aspect Site investigation to study the Fault zone  Excavation of an experimental gallery  Analysis of the soil thanks to in situ and laboratory tests  Pressuremeter, triaxial tests, …  RMR, compressive strength, …  Hydrological study  In situ : piezometer  Chemical Analysis and flow rate measurements in the thermal baths Modelling and calculation of the soil behaviour and validation with the excavation of the experimental gallery 10/05/201510

Solutions Water Pumping from experimental gallery and 5 water wells to drain groundwater  No infiltration during tunnel excavation Realization of a concrete trench to protect and divert the stream  Environmental protection Jet grouting from the surface and the TBM  Reinforcement of the soils : better mechanical properties allowing excavation Constant speed and medium pressure of the TBM cutting head applied on the rock face 10/05/201511

Conclusion Geologic, hydrologic and topographic surveys during the crossing of the fault The fault zone was crossed successfully  Very low settlements  No overexcavation  Preserved site 10/05/201512

APPENDIX 10/05/201513

10/05/201514

10/05/201515