1 Tunnel Engineering for Indian Railways

2 Pir Panjal Tunnel

3 Pir Panjal Tunnel The tunnel is almost straight, extending from north to south. It is 8.4m wide and 7.3m high.

4 Pirpanjal Tunnel Pir Panjal (or T-80) is India's longest transportation railway tunnel at 10.96km. The tunnel section is a part of the 202km Udhampur - Srinagar - Baramulla rail link project undertaken by the Northern Railways

5 Pirpanjal Tunnel It operates 440m below the existing Jawahar Tunnel, which is the only road link from the region to the rest of India.

6

7 Tunnel engineering at a glance

8 1. Topographic survey Topographic survey done for 2000m length and for a width of 100m on either side of centre line of the tunnel Resolution with a grid of size 25m x 25m Gradient of 1 in 200 adopted in the tunnel throughout for easy drainage

9 2. Geotechnical investigations
9 bore holes with a maximum depth of 51.0m below natural ground level Rotary type boring machine with diamond bits was used. Jointed basalt (above crown), breccia (in the Tunnel section), Amygdaloidal basalt, volcanic ash (below invert) etc are encountered.

10 3. Field tests (a) Electrical resisitivity tests Current applied in the outer pair of electrodes Potential difference measured at the central pair of electrodes Resistivity governed by the amount of pore water and arrange of pores

11 3. Field tests (b) Pressure meter tests (Stress – Strain relationship of soil mass and deformation modulus, E) Determine rock strength parameters, E for Basalt is 5000 MPa

12 3. Field tests (c) Lugeon tests (Permeability characteristics of rock mass Permeability values are found to be low. Assessment of grouting requirement.

13 3. Field tests (d) Seismic Tomography Fast emerging powerful tool and precise in-situ determination of seismic velocities Detailed information about the soil and rockmass properties Separation of drill bore holes not more than 60m to give better resolution

14 4. Tunnel Design Design parameters: Density Water absorption UCS Core recovery RQD E value Tensile strength RMR Q value

15 Tunnelling Video Manual Tunnel Boring Machine

16 TUNNELS IN SOUTH CENTRAL RAILWAY

17 Construction of BG Single line Railway Tunnel between Margutti (H) and Kamalapur stations In Bidar – Gulabarga section Tunnel length: 1500 RM

18

19 Tunnel layout Trolley refuge at every 100m Main tunnel Escape tunnel

20 AREA sqm

21 area:25.94 sqm

22 Tunnel radio system VIDEO

23 Thank you