GMWG - 3. October 2005 Brian Parish AML Specifications Manager UKHO Brian Parish AML Specifications Manager UKHO.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 2: Functional Testing.
Advertisements

©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
BROUGHT TO YOU BY THE LETTER “Q”:The Qualfied Mortgage and Qualfied Residential Mortgage Joseph Pigg, Vice President and Sr. Counsel aba.com |1-800-BANKERS.
What’s New - CARIS AML Production Tools
©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
Agenda item 5 ISSAI 200 and ISSAI Changes to the ISSAIs.
Software Process Improvement in Small Organizations A Case Study.
Industrial Avionics Working Group 18/04/07 Assessing the Safety Case Architecture Optimising the Design Architecture and Safety Case Architecture.
EContentPlus Programme European Commission Community Programme
QinetiQ Proprietary AN ISO standard for high integrity software.
1 Light Truck Tyres (C Tyre types and LT Tyre types) Roadmap for Harmonization March 2009 Informal document No. WP (147th WP.29, March.
1 United States Patent and Trademark Office Revised PCT International Search and Preliminary Examination Guidelines Biotech/ChemPharm Customer Partnership.
GMWG - 2. March 2005 Brian Parish AML Specifications Manager UKHO Brian Parish AML Specifications Manager UKHO.
SOFTWARE AND VENDOR SELECTION
Update on CARIS AML Production Tools NATO GMWG Technical Session Lo-Skolen, Helsingor, Denmark Speaker: Christian Fellinger March 2005.
©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
1 Chapter 8++ The Final Design Report. 2 Motivation The main purpose of the design report is to provide all the information necessary to: The main purpose.
Doc.: IEEE /0136r0 Submission March 2006 Abbie Mathew, NewLANS Project: IEEE P Working Group for Wireless Personal Area Networks Submission.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
Evaluation Criteria and Traffic Models Update Farooq Khan IEEE Plenary Meeting Orlando, FL, USA March 15-19, 2004.
MWIF Architecture Status Jan Paul Reynolds TC Chair.
©2015 SAP SE. All rights reserved.1 Use case description 1/3 Company name Main contact name Project type (if migration please provide information on existing.
TickIT Main Goals - make developers think how - quality relates to software - to achieve quality in software - to continuously improve qaulity management.
NFC Devices WG Infineon Technologies Change Request to Type 2 Tag Operation Specification 1.1 Remove inconsistency of memory size indication.
©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
Impact Assessment Mod_17_12 : Report on Offered Capacity in Implicit Auctions 24 October 2012.
3GPP2 Input MMS Workshop November 7, 2003 Nadia Bishai Chair, 3GPP2 TSG-X PSN MMS Ad Hoc.
Introduction to System Analysis and Design MADE BY: SIR NASEEM AHMED KHAN DOW VOCATIONAL & TECHNICAL TRAINING CENTRE.
Compound Types for Java Object Oriented Systems and Languages © 2001 Marcus Handte.
The Digital Media Project1 Leonardo Chiariglione.
Core Competencies, R&D Management and Partnerships Samuli Hynönen
Customer focusLeadership Involvement of people Process approach System approach to management Continual improvement Factual approach.
3GPP2 Input MMS Workshop November 7, 2003 Nadia Bishai Chair, 3GPP2 TSG-X PSN MMS Ad Hoc.
©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
HIRING FOR CONSULTATION Marlon Murahwa. CONTENTS 1.Preamble 2.Service Description 3.Deliverables 4.Rates and Pricing 5.Consultation Process 6.Terms and.
2-D Bar Coding Indiana use of 2-D Bar Coding in 1999 filing season with market partners Results positive - utility proven in tax return processing Indiana.
DOCUMENTATION DEVELOPMENT LIFE CYCLE (DDLC)
Performance Testing Services. Table Of Contents Contents 1.1. Company Profile 2.2. Performance Testing Methodology 3.3. Benefits of Performance Testing.
Hire Toyota Innova in Delhi for Outstation Tour
DV Infosoft Pvt Ltd | Best Software Development Company in Bhopal, Website Designing, SEO Services, Web Development, E-Commerce Portal Services
 Software Engineering -KPVE provides high- quality software engineering services for all types of companies. We provide an array of solutions that help.
BACK SOLUTION:
Report of the ENC Standards Maintenance Working Group
DG Environment, Unit D.2 Marine Environment and Water Industry
Prism Communications, Inc.
UFNPT Planning and Development Work Plan, Milestones and Timelines
Welcome to CT1315 Project1 Latifa AlAbdlkarim King Saud University October,2009.
DG Environment, Unit D.2 Marine Environment and Water Industry
Date Submitted: [March 13, 2011] Source:[Ben Rolfe] Company [BCA, SSN]
Status report from UNECE Task Force on Cyber Security &
The Centers for Medicare & Medicaid Services
Purchasing a Solution Chapter 9.
Best Social Media Marketing Company
IEEE IMT-Advanced Review Process
Business Intelligence Tools
Topic raised at July 2009 Distribution Workstream
Why OFDM for the High Rate b Extension?
Hydrographic Services and Standards Committee
Report of Defence Geospatial Information Working Group (DGIWG)
MIPC Proposal – <INSERT TITLE> for <INSERT INDUSTRY>
Chapter 7 Quotients.
IEEE IMT-Advanced Review Process
- '1:- bs? a ' I.
Sports and Entertainment Marketing 1
Designed & Developed by Sampada Software Solutions
Practice Geometry Practice
SDI from a technological perspective: Standards
Business Intelligence Tools
Presentation transcript:

GMWG - 3. October 2005 Brian Parish AML Specifications Manager UKHO Brian Parish AML Specifications Manager UKHO

GMWG - 3. October 2005 VPF annex B  VPF annex B for v2.0 CLB published July 05  Fundamental problems with other draft annex Bs  Feature mapping is flawed (word matching)  DFDD is converging with S-57  Geometry issues (HIHWG may have resolved)  UKHO will expend less effort on this in future  Requirement still exists  Can we involve industry in the solution?

GMWG - 3. October 2005 VPF annex B, Proposal to Industry n The Annex B could be a by-product of VPF data production system software development. –There is a requirement & market for a VPF solution –There are many VPF reading legacy systems –A NATO GMWG endorsed Annex B is necessary n GMWG to specify VPF requirement –How much of the S-57 capability can we concede –Define an acceptable, pragmatic level of functionality in light of experience gained –Build on the work of the HIHWG and continue into the AML & TOD content models as recommended by IDON. n The company or industry consortium which develops the system and annex B is first to market following GMWG endorsement