Very Large Power System Operators in the World

Slides:



Advertisements
Similar presentations
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Advertisements

Division: EIDD WTO TBT Workshop on Good Regulatory Practice March 2008 Focus on Transparency and Consultation.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Study Committee Representatives Annual Report December, 2012
Planning, optimization and regulatory issues
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
Transmission; Foundation of a Power Market 12 May 2006.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Sustainable Energy Systems Int’l H 2 Safety Conf, Pisa, Italy, 8-10 Sep IPHE projects focus on pre-competitive collaborative research, development.
DUNSRight and XBRL – Enhancing Transparency through a Common Commitment to Global Standards 13 th XBRL International Congress June, 2006 CONFIDENTIAL &
TSO Comparison Group : An Overview
Towards Regional Independent Operators – a main driver for successful market integration.
Western States Energy & Environment Symposium October 27, 2009.
Supergrid Modelling for the Indian Subcontinent Farhan Beg Global Energy Network Institute With Inputs from Mr. Peter Meissen and Mr. Paul Michael Dekker.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
Patricia de Suzzoni, Chair of ERGEG Customer Working Group Citizens’ Energy Forum, London, September 2009 Regulatory aspects of smart metering in.
EU Commission Task Force for Smart Grids Expert Group 3: Roles and Responsibilities of Actors involved in the Smart Grids Deployment Samia Benrachi-Maassam.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
RETHINKING THE ELECTRICITY GRID RETHINKING THE ELECTRICITY GRID 14 May 2012 Presented by: PATRICIA DE SUZZONI ADVISOR TO THE CHAIR OF CRE (French Energy.
Smart Grid Overview Steve Bossart Project Management Center Foreign Service Officers Coal and Power Training Course July 20, 2012.
Update on the California Dairy Future Task Force and moving forward December 5, 2012 CONFIDENTIAL AND PROPRIETARY Any use of this material without specific.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
EU policy objectives and European research on Smart Grids European Commission, DG Research Henrik Dam Research Programme Officer ADDRESS international.
An Overview of Our Regulatory Proposal
Safety Driven Performance Conference 2013 The future of managing asset-intensive businesses John Keefe APM/RBMI Technical Manager Asset Integrity Services.
2 Overview With active participation from individuals and chapters all over the world, the Information Systems Security Association (ISSA)
SARI/Energy Integration South Asia Regional Initiatives for Energy Integration (SARI/EI) Shanker Khagi USAID/Nepal March 7, 2013 Kathmandu, Nepal Supporting.
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
OECD Review of Russian Statistics Peer Review Mission to Russia April 2012 Tim Davis Head, Global Relations, Statistics Directorate.
© 2009 IBM Corporation Let’s Build a Smarter Planet Thongchai Watanasoponwong – Country Manager Power Systems, STG September 15 th, 2009 Green IT เทคโนโลยีสีเขียวเพื่อสิ่งแวดล้อม.
Conformity Assessment and Accreditation Mike Peet Chief Executive Officer South African National Accreditation System.
INTOSAI Public Debt Working Group Updating of the Strategic Plan Richard Domingue Office of the Auditor General of Canada June 14, 2010.
Integration Development Programme in the Field of Statistics of the Eurasian Economic Union for EEC THE EURASIAN ECONOMIC COMMISSION.
Ensuring Food Safety in Europe through Scientific Cooperation and Networking The Role of EFSA Carola Sondermann EFSA Polish Focal Point – Annual Experts.
George A. Godding, Jr. Director, Management and Communications Office of Market Oversight and Investigations Comments are the speakers and do not necessarily.
Christopher Burleson Leslie Kay Ritchie Jitesh Sharma European Energy Restructuring: The Quest for a Competitive Single Energy Market.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
APEC ENERGY WORKING GROUP FRAMEWORK PROPOSAL FOR IMPLEMENTING ENERGY INVESTMENT RECOMMENDATIONS (November 2004).
Energy Agency of the Republic of Serbia
The strategy for improved electricity distribution maintenance 9 June 2008.
1 ELECTRIC POWER POOLS ………more slides. 2 DEVELOPMENT OF NORDPOOL 1996.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
African Regional Director
Electric Energy Systems Smart Grids and IEA ENARD – Annex II: DG System Integration into Distribution Networks Helfried Brunner Operating Agent AnnexII.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
FERC Staff’s Report on Demand Response and Advanced Metering.
Kathy Corbiere Service Delivery and Performance Commission
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
IMF Economic Indicators: Principal Global Indicators (PGI)
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Smart Grid Schneider Electric Javier Orellana
NLDC 1 VLPGO : Group of the Very Large Power Grid Operators.
Sustainable Community EMS Design Including Pollution Prevention Michelle M. Wyman Reed Smith Shaw & McClay LLP EMS Models and Strategies: ISO & Beyond.
LSEC H2020-DS - & CIP Ulrich Seldeslachts, Brussels, January 27th, 2016.
Introduction to the OECD. 4 key questions Who are we? What do we do? How do we do it? What happens next?
Renewable Energy Technologies IEA - ENARD Electricity Networks - Analysis, Research and Development Draft Annex 2: „DER System Integration in Distribution.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
The Transition to a High DER Future
Empowering Electric Industry Human Resources Transformation
Electricity Distribution Network Design Training & Courses
Karen Bartleson, President, IEEE Standards Association
SOUTH AFRICAN INSURANCE ASSOCIATION
ETSI Standardization Activities on Smart Grids
Presentation transcript:

Very Large Power System Operators in the World S.P.Kumar Chief Manager Power System Operation Corporation Ltd. NLDC

Indian Power System : Amongst the Largest in the World National Grid (UK) 68GW Capita: 65m MidWest ISO (USA) 159GW Capita: 40m RTE (France) 93GW PJM (USA) 165GW Capita: 51m Red Electrica (Spain) Capita: 47m ONS (Brazil) 100GW Capita: 170m SO - UPS (Russia) 146 GW Capita: 144m Tepco (Japan) 64GW Capita: 45m KPX (South Korea) 70GW Capita: 49m Terna (Italy) 57GW Capita: 60m SGCC (China) 900GW Capita: 1000m PGCIL (India) 163GW Capita: 1200m Eskom (South Africa) 43.5GW Source: VLPGO, 2010

Snapshot Of Indian Power System April 15, 2017 Snapshot Of Indian Power System SLIDE-1: ALL INDIA POWER MAP ·       Sir, this picture shows the extra high voltage transmission network in India ·       Yellow colour depicts 765 kV lines ·       Red colour depicts 400 kV lines and Purple colour shows plus-minus 500 kV HVDC lines NRLDC 3

Typical Numbers for Indian Power System… Demand :~ 110 GW Generating Units :~ 1600 400kV & above Trans. Line :~ 700 Transformers :~ 2000 Busses :~ 5000 Control Areas :~ 100 Inter-State Metering Points :~ 3000 Schedule Matrix Elements :~ 96 X 100 X (~10) ~=100000 Open Access transactions typical daily :~ 100 Captives participating in market :~ 125

Peculiarities of Indian Power System High Growth Rate Shortage – both (MW & MU) Federal Structure Decentralized Scheduling & Despatch Diversity Floating Frequency Large Hydro Variation Large Demand Variation

How do we relate Internationally to the Other Grid Operators Worldwide ? Associations Worldwide Very Large Power Grid Operators (VLPGO) TSO-Comparison Group (http://www.tso-comparison.com) CIGRE (INTERNATIONAL COUNCILON LARGE ELECTRIC SYSTEMS) - C2 and C5 committees http://www.cigre-c2.org/ System Operation and Control http://www.cigre-c5.org/ Electricity Markets and Regulation (Conseil International des Grands Réseaux Electriques). International Interconnections SAARC

Very Large Power Grid Operators (VLPGO)

Formation of the VLPGO A voluntary initiative of the world’s largest Power Grid Operators Representing together more than 60% of the electricity demand in the world. 14 Largest power grid operators of the world Created in 2004 Not-for-profit organization Followed several blackouts across the world To investigate fundamental issues of common interest to its members To develop joint action plans addressing the improvement of power system security. Formalized in 2009 Specific Focus Issues related to Very Large Power Grids Membership Size > 50 GW

VLPGO : Role of Grid Operators Worldwide Work constantly to plan, monitor, supervise and control the energy delivered as a continuous process 24 hours a day Delivering the electricity that powers modern societies Critical role of Grid Operators includes acting on behalf of Consumers, to ensure quality while minimizing costs and recognizing economic and societal dependence on electricity; a technical role in planning, designing, and managing the Power Systems; an interface role with generators, market participants and distributors, which are the most direct users of the transmission grid; a natural role of interlocutors with power exchanges, regulators and governments.

Common Challenges for VLPGO Providing power system reliability and security Smart Grid development Integration of Renewables Integration of Electric Vehicles Capacity development and optimization including system renovation and development, equipment upgrading. Reducing CO2 emissions Improve productivity and energy efficiency Power system visualization Demand Side Management Interconnections Development of new technologies and HVDC Establishment and coordination of new control centers 11

VLPGO Vision and Mission “To be a leader and a catalyst in the transition of the electric power industry to the power grid of the 21st century” Mission Develop an international consensus on strategic issues which are unique to the very large power grid and market operators Develop a common vision with respect to the technologies and best practices required to address those issues Facilitate the implementation of the vision through information exchanges, collaborative projects and cooperation with other international organizations.

Objectives: Transition to Grid of 21st Century Innovate Thinking An international consensus on strategic issues challenging the very large power grid and market operators Technology Advancement A common vision with respect to the technologies and best practices required to address those issues in a framework of social and environmental responsibility of each member. Industry Leadership Through a common Communication Policy, the dissemination and implementation of a common vision through information exchange, collaborative projects and cooperation with other international organizations.

Expectation within VLPGO framework Sharing worldwide experience and knowledge on best practices to improve the power system security and performance Building a common vision on the transition towards a more modern power system (i.e. Smart Grids) Being catalyst towards Manufacturers and Vendors to make available the best technologies to the Power Systems Creating a industry voice on the transition to a more sustainable energy system and the journey to COP 17 and the enabling environments required to support the electricity supply industry worldwide. Enhancement of transmission security: security must be a permanent concern of VLPGO Communication Strategy: PGOs must have communication strategies for regular, risk and crisis situations. 14

VLPGO Delivering Value to its Members Emerging Technology Identify early trends Assess common impacts Develop common solution requirements Shared Learning Identify common key operational risks Share after-the-fact analysis of major events Common Approaches & Solutions Develop common specifications across suppliers Create new market mechanisms Produce guidelines for common reliability issues Best Practices Share “best” Ideas and policies Create methodologies for evaluation or analysis Industry Influence Develop common positions for industry stakeholders

Structure of VLPGO Activities The VLPGO consists of: Governing Board 5 Joint Projects 5 Working Groups 2 Workshops Short-term collaboration on specific project by subset of members One of exploration of topic area Task Task Task Task Task The Governing Board has: Streamlined the working approach between different forums Is writing guidance for conveyors – to improve performance (2010) Focused on a smaller number of activities to deliver material progress & create a multi-year plan A key aspect of the VLPGO mission is to act on issues of common interest to its members. This is accomplished in the following ways: Working Groups addressing specific topics/themes of interest to all the members, as decided at the annual Meeting. Working Groups effort may span over several years, but they act on an annual work plan and set of deliverables. Joint Projects where two or more of the Members decide to coordinate their activities and combine their resources to execute projects of common interest. Workshops, where the majority of the members (typically Governing Board Member representatives) explore together specific themes of interest to all the members' and provide the Steering Board with high level summaries and conclusions/recommendations.

VLPGO 2011 Joint Activities Working Groups WG #1 – Wide Area Monitoring Applications (PJM) WG #2 – Enhanced Security (Terna/ONS) WG 2a – Security vs. Operation Costs (Terna/ONS) WG 2b – Enhanced Network Restoration (Terna/ONS) WG 2c – Equipment Overstressing (ONS) WG 2d –Security of Supply to large metro areas (?) WG #3 – Integration of Renewables (NG) WG #4 – Load Forecasting (REE) WG #5 – HVDC (ONS) WG #6 – Electric Vehicles (PJM) WG #7 – Storage (MISO) Joint Projects Visualization (SGCC) Workshops WS #1 – KPIs (SO UPS) WS #2 – Smart Grid (KPX) 18

VLPGO Current Activities - mapped Principle Drivers Renewable Smart Security and Safety of Supply WG #3: Integration of Renewable Technologies WS #1: Smart Grids WG #2a: Enhanced Security - Vulnerability JP #3: Plug-in Hybrid Electric Vehicles JP #2: HVDC in Synchronous Power Systems JP #4: Monitoring and Automation Enduring Drivers New Technology WG #1: SynchroPhasors (Wide Area Monitoring) Efficient Operation WG #2c: Equipment Overstresses #5: Visualization JP #1: Asset Management WS #2 – Key Performance Indicators (KPIs) WG #2b: Enhanced Security - Restoration

VLPGO Accomplishments thus far SynchroPhasors: WAMS Architecture Requirements and PMU Certification Test Methodology Preliminary Report”, 2008 Capacity Markets: “Market Mechanisms and incentive Instrument to Promote Generating Capacity and Demand Response”, 2008 Self Healing Grid: “Cascading Events and How to Prevent Them – Restoration Process Prevention Of Large-Scale Blackouts In The Large Metropolitan Cities”, 2006 - Application Guide “Self Healing Techniques to Prevent Black Outs and Cascading Events”, 2008 EMS Architecture: EMS Architectures for the 21st Century (transferred this work to CIGRE working group D2.24) 20

VLPGO Workplan … Road Ahead NLDC

VLPGO Future Drivers Principle Drivers Connecting low carbon renewable sources of generation Building SMARTer electricity networks of the future & the impact of SMART load changes Ensuring the future Security and Safety of Supply of our networks Enduring Drivers Advancing and implementing new technology to the benefits of our customers Developing network capacity & operating our electricity networks in the most efficient and economical way we can

TSO – Comparison Group The Group of International Comparison of Transmission System Operation Practice

Mission To exchange information on Power System Operators current and future operating practices for the purpose of benchmarking. An annual survey is undertaken to ascertain Equivalent staffing requirements Best practices Performance measures Areas Transmission system operations including generation scheduling and dispatching, Electricity market operation, Operations planning, Settlements, Information technology, training, etc. TSO is managed by a Steering Committee consisting of 6 elected members and supported by KEMA

Most important reasons for being a member Performance Measures Database (> 50 data points) Comparing with other TSOs (Benchmark Model) Identification of peers (Company profiles / Activity Lists) Learning from other TSOs (Best Practice) Informal contacts and TSO Questionnaires (Networking) Counter Benchmark to Regulatory Benchmark (Insurance policy) 25

Members Members Name Country ESKOM South Africa Red Eléctrica de España* Spain Landsnet Iceland Fingrid* Finland Amprion* Germany Transpower NZ* New Zealand Saudi Electricity Company Saudi Arabia TenneT Netherlands Statnett SF Norway PJM Interconnection** PA, USA National Grid Electricity Transmission* United Kingdom CLP Power* Hong Kong ESB NG Ireland Transpower Germany Swissgrid Switzerland Rede Eléctrica Nacional Portugal Hydro Québec Canada Svenska Kraftnät Sweden PSE Poland EWA Bahrain China Southern Power Grid China Power Grid Corporation of India Ltd. India

Benchmarking Model The TSO Comparison Group is using an advanced multidimensional Benchmark Model for comparing TSOs’ System Operation organization. The Model’s “multidimensional approach” provides insight into the efficiency and effectiveness of each TSO with respect to both its own environment (size, structure, regulation et al) and to other TSO environments. The Model’s output has demonstrated the capability of identifying generic differences (resulting in ad hoc peer-groups) as well as generic similarities. The Model’s output has been utilized for mergers (in defining staff sizing requirements), and tested for self-analysis (in validating actual staff sizes).

Features of the benchmarking model The model aids in highlighting the effects of non-traditional changes within peer groups. As non-traditional changes, such as new Market initiatives are developed, the Model will display the areas of change. Although the value of those changes will vary with corporate objectives, the magnitude and the areas impacted by the changes will be highlighted by the Model. The key feature of the Model is that it does not focus on defining the “best” and the “worst” TSOs, but rather focuses on identifying differences between TSOs. Whether differences are good or not will depend on many factors – the Model allows the user to make those value decisions based on the goals of the respective user.

Transmission Operation For Benchmark purposes a ‘standard TSO’ with five key System Operation processes has been defined.. Market Operation Transmission Operation System Operation 29

..and a process which takes into account the remaining differences between TSOs Input Data Data Definition Data Collection, Verification, Validation Bench mark Benchmark Calculations Evaluation of Benchmark Results Results Discussion of Differences Identification of Learning Points Company Profile Activity List 30

Data Collected annually since 2000, validated by KEMA, verified by group Example of data points: Operations Planning (1 year to 2 weeks before day of operation) Number of Planned Transmission Outages Number of Planned Generating-unit Outages Scheduling (2 weeks to 1 day before day of operation): Accuracy of peak load forecast Accuracy of minimum load forecast Transmission congestion: Generation constrained "on". Foreseen transmission concerns Scheduled transmission outage requests Scheduled generation outages Real Time Operation (Day of Operation): Frequency control performance Average overall system deviation Generation and load instructions Personnel on shift RTO transmission outages taken Support Operator training hours of teachers Number of SCADA database points (Status points, Analog points, Control points) Overall Performance: Transmitted energy at risk Response Time of Area Control Error or Frequency Energy unsupplied due to 'unsupplied energy incidents' Unsupplied energy incidents Voltage excursions Reference Data Number of Staff in Full Time Equivalents, separately for each process Costs, separately for each process and network losses Network date, including e.g. Circuit Ends, Line lengths, Generators, Peak Load, Transmitted Energy, Interconnectors. Support All data are available for members 31

For each process, two benchmark models have been developed… COST Based Model PERFORMANCE Based Model TSO Process Input (staff, cost) Output (uniform) Environmental Factors (e.g. network size) 32

..Here, an example of one of the 10 benchmark models is shown Environmental Factors EF1: Network Size (circuit ends, generators, interconnectors) EF2: Planned Outages (Transmission and Generation) Operations Planning Input FTE Output (uniform) Model parameters based on regression of TSO data 33

Real Time Operation FTE Model At the Interim workshop it was decided to apply a fix constant of 6 for the RTO (FTE) model, which is considered to be to be the minimum staff required for 24 x7 operation in a control centre. EF1= NTW3 + NTW3a + 5*(NTW4 + NTW10a + NTW10b) EF2= RTO5 FTE = ß1 EF1 + ß2 EF2 + 6 ± error NTW3 = Circuit Ends NTW10a = AC Interconnectors NTW3a = Switched circuit ends NTW10b = DC Interconnectors NTW4 = Generation Units RTO5 = RTO Transmission outages taken

Operation Planning FTE Model EF1= NTW3 + 5*(NTW4 + NTW10a + NTW10b) EF2= OPL1 + OPL2 + SCH3 NTW3 = Circuit Ends OPL1 = Planned Transmission outage requests NTW4 = Generation Units OPL2 = Planned Generation unit outages NTW10a = AC Interconnectors SCH3 = Foreseen Transmission concerns NTW10b = DC Interconnectors

Scheduling FTE Model EF1= SCH3 + SCH5 + SCH6 SCH3 = Foreseen Transmission concerns SCH5 = Scheduled Transmission outages SCH6 = Scheduled Generation outages

After the Fact FTE Model Cost or FTE EF1= NTW3 + 5*(NTW4 + NTW10a + NTW10b) EF2= OAP4 NTW3 = Circuit Ends OAP4 = Unsupplied energy incidents NTW4 = Generation Units NTW10a = AC Interconnectors NTW10b = DC Interconnectors

Support FTE Model EF1= NTW3 + 5*(NTW4 + NTW10a + NTW10b) EF2= SCH5 + SCH6 NTW3 = Circuit Ends SCH5 = Scheduled Transmission outages NTW4 = Generation Units SCH6 = Scheduled Generation outages NTW10a = AC Interconnectors NTW10b = DC Interconnectors

Which results in an assessment for each process for FTE and Cost Example of Benchmark Results Details are available to members only 39

Simultaneously differences between TSOs are being investigated… Part of ‘Activity List for Operations Planning process’ Share in IT costs Details are available for members 40

And summarized in management presentations Data Data Definition Data Collection, Verification, Validation Bench mark Benchmark Calculations Evaluation of Benchmark Results Results Discussion of Differences Learning Points Company Profile Activity List Sum of five benchmark results Quality of System Operation (frequency, energy not supplied, Voltage) 41

Results of Annual Survey An important basis for performance comparison and for improvement of operating practices. Experience of Members of the Group discussed each year in one or two Workshops upon invitation of one of the participating companies Membership of TSO is presently restricted to up to 30 companies / departments that qualify as an operator of a bulk transmission system

Issues to be Considered in International Interconnections

Guiding Attributes Spirit of regional cooperation Approach towards long-term planning Energy policy structure and goals Adherence to international agreements Encourage cross border trades

International Interconnections - Benefits Improving Reliability and Pooling of Reserves Reduced investment in generating capacity Improving load factor and increasing load diversity Economies of scale Diversity of generation mix and supply security Economic exchange Environmentally benign dispatch and siting of new plant Coordination of maintenance schedules

International Interconnections – Various Aspects Technical Commercial Regulatory/Legal Coordination

Technical Objectives Economy Security Reliability Efficiency Minimal environmental impact Quality

Coordination Working level coordination committee Technical Operation Commercial Protection

Weblink: http://www. un

International Interconnections Nepal Bhutan Over 16 links of 132/33/11 KV Radial links with Nepal Net import by Nepal Tala: 1020 MW Chukha: 336 MW Kurichu: 60 MW Net import by India India- Bhutan synchronous links 400 kV Tala-Binaguri D/C 400 kV Tala-Malbase-Binaguri 220 kV Chukha-Birpara D/C 220 kV Chukha-Malbase-Birpara 132 kV Kurichu-Bongaigaon Bangladesh 400 KV AC line between Baharampur(India) and Bheramara(Bangladesh) with 500 MW HVDC sub-station at Bheramara Sri – Lanka Madurai(India) and  Anuradhapura(Sri-Lanka) through ±500 KV HVDC under sea cable Maps not to scale

Survey Questionnaires Questionnaire I – Present Power Supply Position Questionnaire II Organization of the Electricity Supply Industry Power System Planning & Planning Criterion Legal / Regulatory Issues Load despatch function Technical Issues Balancing Supply – Demand Electricity Market Ancillary Services Renewable Energy Resources Transmission Pricing Congestion Management Grid discipline Investments Existing International Interconnections Questionnaire III – Long term projections

Draft Template – Contents

Draft Template – Tables and Figures

CIGRE (INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS)

Aim CIGRE (International Council on Large Electric Systems) is one of the leading worldwide Organizations on Electric Power Systems, covering their technical, economic, environmental, organisational and regulatory aspects. A permanent, non-governmental and non-profit International Association, based in France, CIGRE was founded in 1921 and aims to: Facilitate the exchange of information between engineering personnel and specialists in all countries and develop knowledge in power systems. Add value to the knowledge and information exchanged by synthesizing state-of-the-art world practices. Make managers, decision-makers and regulators aware of the synthesis of CIGRE's work, in the area of electric power.

CIGRE: Developing Technical Knowledge CIGRE develops technical knowledge through 3 types of activities: - Organizing Conferences and meetings, where papers are discussed, - Carrying out Permanent studies by 16 Study Committees, each dealing with a specific technical field,  publishing reports and organizing Tutorials.   - Making its publications available to members of CIGRE and others. 

Study Committee C2 - System Operation and Control The Study Committee C2 serves within Cigré by forming a working concept for the functionalities, structures and competence needed to operate integrated power systems in a way that is in compliance with the social requirements for security of electricity supply. The performance of power systems in real time depend on technical quality factors built into the systems through various activities and knowledge currently covered by the other Cigré Study Committees. SC C2 therefore needs to use and combine results provided within these committees. An area which is unique for C2 is however the dependency on a good performance of human resources in real-time system operation activities. In these respects SC C2 encircles a wide range of competence areas and interfaces to other disciplines.

Mission and Scope of CIGRE Study Committee C2 Mission of SC C2: To facilitate and promote the progress of engineering and the international exchange of information and knowledge in the field of system operation and control. To add value to this information and knowledge by means of synthesizing state-of-the-art practices and developing recommendations. The Scope of SC C2: The scope of the SC covers the technical, human resource and institutional aspects and conditions for a secure and economic operation of existing power systems under security requirements against system disintegration, equipment damages and human injuries

Driving forces for future work The priorities to important emerging factors that will influence and define new requirements on the System Operation performance. Directions are: Integration of regional and national grids into large open markets Management of generation capacity and energy shortages Management of capacity shortages Impact from new sources of dispersed generation and related system requirements Influence from customer needs and response Interaction between open market trading mechanisms and power system operation in congestion and transit flow management Integration of information and communication technology

Sub – Committees of C2

Study Committee C5 - Electricity Markets and Regulation The Mission of Study Committee C5 is "to facilitate and promote the progress of engineering and the international exchange of information and knowledge in the field of electricity markets and regulations. To add value to this information and knowledge by means of synthesizing state-of-the-art practices and by developing recommendations." SC C5 Strategic Goals Development and changes in the Business of System Operations Market Entities Market Activities and Market Design Market Regulations

Working Groups of C5 Committee The six Working Groups and one Joint Working Group approved by Technical Committee are: WG C5-3 Investments & Financing of new Transmission and Generation Assets in a Deregulated Environment WG C5-7 Market Design – Structure and Development of Electricity Markets WG C5-8 Renewables and energy efficiency in a deregulated market WG C5-9 Retail Market Competition – Customer Switching, Metering and Load profiles WG C5-10 Establishment of Effective and Sustainable Regulatory Incentives for Capital Investments in Electricity Networks and Generation WG C5-11 Market design for large scale integration of renewable energy sources and demand side management JWG C2/C5–5 Development and Changes in the Business of System Operators

CIGRE WG/Task Force/Study Committees NLDC

CIGRE WG/Task Force/Study Committees

System Operation Models

Possible Models for Regulatory & Commercial Relationships ISO: Independent System Operator AO: Asset Owner

Scope of System Operation Activities

EUROPEAN & SOUTH AFRICAN MODEL G G G G G T + SO D D D D D This model is followed in UK by NGC, in Norway by Statenett, in Sweden by Svenska Kraftnet, in Finland by Fingrid, in Netherland by Tennet, in Denmark by Eltral/Elkrafts and in South Africa by Eskom.

G T + SO D RTE EdF FRENCH MODEL This model is followed in France, wherein Transmission and System Operation functions have been delegated to RTE. EdF is responsible for the Generation and the Distribution.

MALAYSIAN AND KOREAN MODELS G G G T + SO + D This model is followed in Korea by KEPCO and in Malaysia by TNB. These entities are now in the process of separating the distribution function from Transmission & SO functions.

G G G G T T T SO TA D D D D CANADIAN MODEL This model is followed in Alberta of Canada. In this model, since, there are more than one main transmission companies, an independent System Operator and Transmission Administrator exist.

G G G G G G RTO SO T T T SO D D D D D D AMERICAN MODEL G G G G G G RTO SO T T T SO D D D D D D This model is followed in USA. Based on their California experience, USA is now moving towards TSO model through RTO.

ORGANISATIONAL SET-UP OF POWERGRID CTU FUNCTIONS Inter-state Transmission Services NON-CTU FUNCTIONS Telecom, Consultancy, Distribution Ring Fenced System Operation Through NLDC / RLDCs LICENSEES

ISO Models: Balancing, Operational & Deep ISOs

Website of System Operators Worldwide S.No. Name of the TSO Country Web Presence 1 ESKOM South Africa www.eskom.co.za 2 Red Eléctrica de España* Spain www.ree.es 3 Landsnet Iceland www.landsnet.is 4 Fingrid* Finland www.fingrid.com 5 Amprion* Germany www.amprion.net 6 Transpower NZ Newzealand www.transpower.co.nz 7 Saudi Electricity Company Saudi Arabia www.se.com.sa 8 TenneT Netherlands www.tennet.org 9 Statnett SF Norway www.statnett.no 10 PJM Interconnection** PA,USA www.pjm.com 11 National Grid Electricity Transmission* UK www.nationalgrid.com 12 CLP Power Hong Kong www.clpgroup.com.hk 13 ESB NG Ireland www.eirgrid.com 14 Transpower www.transpower.de 15 Swisssgrid Switzerland www.swissgrid.ch 16 Rede Eléctrica Nacional Portugal www.ren.pt 17 Hydro Québec Canada www.hydroquebec.com 18 Svenska Kraftnät Sweden www.svk.se 19 PSE Poland www.pse-operator.pl 20 EWA Bahrain www.mew.gov.bh 21 China Southern Power Grid China www.eng.csg.cn 22 Power Grid Corporation of India Ltd. India www.powergridindia.com / www.nldc.in