Estimating the Cost for a Foundation and Footing.

Slides:



Advertisements
Similar presentations
Estimating the Cost for the Concrete Pad
Advertisements

Parts of typical slab formwork
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Concrete Box Culverts (CBC)
Ground-Supported Slabs • Exterior Flatwork
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Group Member: Desiree Andrade Larry Molina Fernando Tejeda Thin Shell Structures.
Chp.12 Cont. – Examples to design Footings
Sketching Techniques. Purposes of Sketching Think through a design Convey your ideas Uses lines and symbols to describe a design.
Motors and Generators. Electromagnets Magnet Poles Parts of a Basic DC Motor Electric Generators From the Power Plant to Your Home.
Construction Cost Estimating Class #5 - Concrete Prof. Ralph V. Locurcio, PE.
Chapter 6 Measuring Masonry and Finishes. Masonry Work Generally It includes clay bricks, concrete bricks and blocks, clay tiles, and natural and artificial.
Composite Functions Consider a person working for a concrete contractor. One of his jobs is to estimate the cost for the product to put in a concrete driveway.
Slide 1 Copyright © 2015, 2011, 2008 Pearson Education, Inc. Linear Measurement Section9.4.
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
Bell Work: Becky reduced the size of the image on the computer screen by 40%. By what percent was the area of the image reduced?
Calculating board Feet linear feet
Estimating Ahmed Elyamany, PhD, AVS. EARTHWORK AND EXCAVATION bank  Earth that is to be excavated is called bank measure. loose  Earth that is to be.
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
Construction Cost Estimanting 4003 Cost Estimating/ Engineering Concrete Structures Prepared by: Ebrahim A Alkooheji Instructor: Proff. Locurcio.
CONSTRUCTING A FIVE CABIN LATRINE
March 13, 2007 DRILL Architecture Styles and Vocabulary QUIZ tomorrow
EDMUND FINLEY TRISHA LOWE NICK MENCHEL ANNA SLEETER BOLIVIA BRIDGE: FINAL DESIGN.
Sinking in Concrete Calculating materials for a concrete job.
Formulas for Perimeter and Area
Wes Marshall, P.E. University of Connecticut March 2007
Construction Math This presentation gives examples of scenarios one would use math in construction situations.
Planning and Sketching a Floor Plan. Bubble Diagrams Quick Sketches.
Sinking in Concrete Day 2 - Sidewalks. Extra Info Now you are ready to move on to the sidewalks. There are two sidewalks in this job –From driveway to.
Measurement Lesson 1 Customary Lengths Customary Units of Length 12 inches (in.)=1 foot (ft) 36 inches =3 feet =1 yard (yd) 5,280 feet=1, 760 yards=
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
 Distance all the way around an object  Example: fence, backsplash, frame, border…  Perimeter is measured in linear units (ft, m, in)
Warm-up Find the circumference and area of the following circles: R = 7 ft D = 20 in.
Copyright © Cengage Learning. All rights reserved. 1.3 Perimeter, Area and Volume.
Basic Measurement.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
Warm Up 1.Write the verbal phrase as a power: Four to the third power: ______________ 2.Evaluate the expression: = _____ (5-2) ÷ 1 = _____ 3. 4 ft.
Gateway – Unit 7 – Green Architecture
House 18 ft 20 ft Sidewalk is 36 inches wide and 4 inches thick. Driveway is 15 feet wide, 60 feet long, and 6 inches thick. DRIVEWAYDRIVEWAY.
Agriculture Mechanics I.  The volume of a triangular prism is equal to the area of the triangle times the length of the prism. ◦ V = ( ½ (b x h)) x l.
Now that I built it, How much did it Cost?
Introduction to Standard and Metric Measurement
Estimating Concrete Construction and Material Cost
Subsystems and Incremental Testing. Subsystems Testing and Incremental Testing Identify Subsystems and Incremental Testing Opportunities.
QUESTION # 4 Compute the number of pieces required for the 2" X 10" X 16' stringers in forming the footing for the stem wall. Apply a waste factor of.
Sketching Techniques. Purposes of Sketching Think through a design Convey your ideas Uses lines and symbols to describe a design.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Concrete Box Culverts (CBC)
Foundation – jay Desai.
Measurement Lesson 1 Customary Lengths
GTT – Unit 7 – Green Architecture
GTT – Unit 7 – Green Architecture
Estimating the Cost of a Concrete Pad & Rebar (Revised: )
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
GTT – Unit 7 – Green Architecture
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Concrete Structures DR. Nabil Dmaidi.
Ellipse Worksheet # 2 Application of Ellipse
Section 9.4 Linear Measurements.
Estimating the Cost for the Concrete Pad
Concrete A structural material made by combining cement, sand, aggregate, and water.
Estimating the Cost for the Concrete Pad
Estimating Length and Area
Introduction to Measurement
Estimating the Cost for the Concrete Pad
Find the Perimeter.
Presentation transcript:

Estimating the Cost for a Foundation and Footing

The Foundation The Footing Calculate and Convert Vertical Rebar Horizontal Rebar Total Cost

The Foundation Base = 900 ft 2 (36 x 25 ft) Calculate the required concrete and reinforcing rod

Foundation 8in. thick 8ft high Volume of foundation = 8in. x 8ft x 122ft (perimeter) The Foundation

Footing 8in. thick 16in. wide Volume of footing = 8in. x 16in. x 122ft (perimeter) The Footing

Calculate and Convert Calculate Foundation Footing ft 3 Convert Order 28.5 yards 3 for foundation system

Vertical Rebar A 10 ft long rebar piece is vertically placed every 3 ft How many 10 ft pieces are needed for a 122 ft perimeter? 41 pieces

Horizontal Rebar 6in. of each 10ft section of rebar is overlapped. Therefore assume a 9.5 ft length. Determine the number of pieces needed at 9.5ft. How many 10 ft pieces are needed for 4 rows with a 122 ft perimeter? Two rows of horizontal rebar are needed for the foundation and two for the footing. 52 pieces

Total Cost Concrete Cost 28.5 yards 3 x $98/yard 3 =$2, Rebar Cost 93 pieces x $4.75 =$ Total Cost $ $ = $3, Note: This does not include labor, excavation, gravel, forming material, etc.

Estimating the Cost for a Foundation and Footing The Foundation The Footing Calculate and Convert Vertical Rebar Horizontal Rebar Total Cost

Image Resources Microsoft, Inc. (n.d.). Clip art. Retrieved July 20, 2009, from