PILOT PROJECT FOR DEVELOPING A NATIONAL ACTION PLAN FOR STRATEGIC IMPLEMENTATION OF THE GHS IN THE GAMBIA.

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

Comprehensibility Testing and its role in the implementation of the GHS.
PRESENTATION OF THE NATIONAL ACTION PLAN TO IMPLEMENT THE GHS IN SENEGAL Meeting on the Globally Harmonized System for Classification and Labelling of.
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Regional Workshop on GHS Implementation for ASEAN Countries
Pakistan National Services Roadmap. Strategies for increasing Services Exports ~ August, 2007.
Experiences with GHS Capacity Building and Implementation in Nigeria PRESENTED BY BY NATIONAL GHS SECRETARIAT FEDERAL MINISTRY OF ENVIRONMENT, HOUSING.
Regional Workshop on Chemical Hazard Communication and GHS Implementation for Countries in the ECOWAS Region - Health Sector Seminar – 12 May 2008 Chelsea.
Thailand National Focal Point for IFCS Chemical Safety Section Food and Drug Administration Ministry of Public Health July 2003.
Round Table on Implementing Trade Facilitation in Transition Economies Geneva, 31 May 2002 Strategy for the facilitation of transit transport in Ukraine.
GHS Implementation in Zambia Importance and Benefits of National Capacity Development Program David Kapindula ECZ Zambia
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Contents A. Inter-ministerial coordination and committees
Strengthening capacities to implement the GHS in Senegal Progress report Ousmane SOW.
NATIONAL CAPACITY BUILDING FORTHE DEVELOPMENT OF A NATIONAL IMPLEMENTATION STRATEGY FOR THE GLOBALLY HARMONISED SYSTEM OF CLASSIFICATION AND LABELLING.
GHS Conference for ASEAN Implementation Towards 2008 and Beyond 9-11 May 2007,Yakarta, Indonesia By: Lao Delegates Vientiane Capital City, Lao PDR.
GHS for the Classification and Labeling of Chemicals – Zambia’s Experience Paper Presented at the Global Thematic Workshop for Strengthening Capacities.
Country Report – Indonesia
Introducing Regulatory Impact Analysis into the Turkish Legal Framework Prime Minister’s Office, Better Regulation Group The Project Implementation Team.
Regulatory Body MODIFIED Day 8 – Lecture 3.
1 SWAZILAND ENVIRONMENTAL AUTHORITY (SEA) WITH THE SUPPORT OF THE DANISH GOVERNMENT THROGH THE DANISH CO-OPERATION FOR ENVIRONMENT AND DEVELOPMENT (DANCED)
PRESENTED BY ELIZABETH TAMALE ASSISTANT COMMISSIONER MINISTRY OF TRADE, INDUSTRY AND COOPERATIVES AID FOR TRADE, INTELLECTUAL PROPERTY AND DEVELOPMENT-
1 WSSD Global Partnership for Capacity Building to Implement the Globally Harmonized System of Chemical Classification and Labelling Meeting of Partners.
The UNITAR/ILO Programme for Capacity Building to implement the GHS GHS Stocktaking Workshop For Southeast, East and Central Asia September 2010.
Capacity Development Work plan for the Clean Development Mechanism in Uganda ROLES AND COMPOSITION OF THE DESIGNATED NATIONAL AUTHORITY (DNA) Presented.
E-Waste Management Policy and Strategy in Uganda
PROJECT BACKGROUND & PROGRESS NIGERIA POLYCHLORINATED BIPHENYLS (PCB S ) MANAGEMENT PROJECT (P )
NATIONAL STRATEGIC PLAN
National profiles on OSH – Methodology
THE ROLE OF CIVIL SOCIETY IN WELFARE MIX MODEL CREATION Best Practice Model Social Center "Home of colors"
Central Asia Regional Health Security Workshop Co-organized with the Command Surgeon, US Central Command and the George C. Marshall European Center for.
GHS Capacity Building and Implementation 13 May 2008 Abuja, Nigeria.
NATIONAL SAICM IMPLEMENTATION: DEVELOPING A GOVERNANCE FRAMEWORK Gillian Guthrie Ministry of Local Government and Environment June 19, 2006 THE CASE OF.
INTERNATIONAL LABOUR ORGANIZATION Conditions of Work and Employment Programme (TRAVAIL) 2012 Module 4: Maternity Protection at work: Who are the main stakeholders?
THANK YOU!. Regional Adviser, Noncommunicable Diseases, WHO/EMRO Dr Ibtihal Fadhil.
Chemical Management in Laos
1 1 BRANCH: CORPORATE AFFAIRS 1. CORPORATE MANAGEMENT SERVICES To provide financial and strategic support services that enhance service delivery by the.
Thailand Progress of GHS Capacity Building
Overview of UNITAR/ILO GHS Capacity Building Programme in ASEAN UNITAR/ILO Global GHS Capacity Building Programme.
The project is funded by The European Union The project is implemented by IOMC June 2015 Introduction to the IOMC Toolbox for Decision-Making in Chemicals.
1 Strengthening Regional and National Capacities for Implementing the Globally Harmonized System of Classification and Labelling of Chemicals (GHS) Activities.
Supporting a Better Local Business and Investment Climate – AN OVERVIEW – SIMON WHITE Strategies and Practices Toward a More Enabling Business and Investment.
Thematic Workshop on Governance, Civil Society Participation and Strengthening Partnerships for Chemicals and Waste Management and SAICM Implementation.
Promoting CARICOM/CARIFORUM Food Security (Project GTFS/RLA/141/ITA) (FAO Trust Fund for Food Security and Food Safety – Government of Italy Contribution)
Session 5: The Role of Business and Industry, and Public Interest and Labour Organisations in GHS Implementation The perspective of Labour Organization.
OVERVIEW OF THE ROLES OF VARIOUS INSTITUTIONS AND REGULATORY FRAMEWORK FOR AFLATOXIN CONTROL IN TANZANIA RAYMOND N. WIGENGE DIRECTOR OF FOOD SAFETY TFDA.
FOURTH CABINET RETREAT 20 – 21 DECEMBER 2011 PRESENTATION BY MOTIE.
Ivory Coast: Elaborating a strategy to put in place NAMAs at the national level Prepared by: Richemond Informal English Translation of presentation prepared.
1 Strategic Approach to International Chemicals Management (SAICM) SAICM Secretariat.
1 GHS CONFERENCE FOR ASEAN: Implementation Towards 2008 and Beyond Jakarta, Indonesia 9-11 May 2007 STATUS OF GHS IMPLEMENTATION IN MALAYSIA.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
The United Nations Global Initiative to Fight Human Trafficking (UN.GIFT) at the Informal Joint Briefing to Member States, Vienna, 2 March 2012.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
“The Quality Infrastructure in Lebanon” Export Norms, Quality Control and Competitiveness FUTURE PROGRAMME Prepared By Ali Berro Director of Quality Programme.
INTEGRATING INDIGENOUS KNOWLEDGE (IK) INTO UGANDA’S POVERTY ERADICATION ACTION PLAN (PEAP) By Joyce N. Muwanga Assistant Executive Secretary Uganda National.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Legal Aspects of GHS Implementation Compiled by Goh Choo Ta.
PUENTE IN THE CARIBBEAN PROGRAMME PHASE 2: Internship on Social Protection Strategies. October 26 November 3, 2009 Santiago, Chile. Presentation: Progress.
IAEA International Atomic Energy Agency Arusha, Tanzania Uganda Dr. Akisophel Kisolo Project Counterpart 2 – 5 December 2013 RAF9038 Final Coordination.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Strategic Objective 4 To promote the exchange of experiences and regulatory knowledge between NRAs inside and outside PANDRH“ Lessons learned from international.
Capacity Building for the implementation of the Cartagena Protocol on Biosafety by the German Development Co-operation: German Federal Ministry for Economic.
ITC-ILO/ACTRAV Course A Trade Union Training on Occupational Safety, Health & HIV/AIDS (26/11 – 07/12/2012, Turin) Introduction to National Occupational.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
Improving the Garment Sector in Lao PDR:
LABOUR INSPECTION IN LAW AND PRACTICE
PRESENTATION OF MONTENEGRO
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Understanding what is the Phytosanitary Capacity Evaluation (PCE)
Presentation transcript:

PILOT PROJECT FOR DEVELOPING A NATIONAL ACTION PLAN FOR STRATEGIC IMPLEMENTATION OF THE GHS IN THE GAMBIA

PRESENTED BY Mr. MOMODOU CANTEH, TECHNICAL DIRECTOR, NEA

BACKGROUND THE GAMBIA

- LARGE PROPORTION OF PEOPLE EMPLOYED IN AGRICULTURAL SECTOR - COMMERCIAL AND SUBSISTENCE PRODUCTION - CROP AND LIVESTOCK PRODUCTION AND FISHERIES CHARACTERIZE THE AGRICULTURAL SECTOR - THE INDUSTRIAL SECTOR IS CLASSIFIED INTO FORMAL AND NON-FORMAL MANUFACTURING, BUILDING CONSTRUCTION AND TOURISM.

-PRODUCTION OF CHEMICALS IN THE GAMBIA IS MINIMAL -HOWEVER, IT IMPORTS A LARGE QUANTITY OF CHEMICALS(AGRICULTURAL, INDUSTRIAL, CONSUMER, ETC) TO MEET THE CHALLENGES

-PETROLEUM PRODUCTS ARE IMPORTED - COUNTRY DEPENDS VERY HEAVILY ON CHEMICALS TO ENHANCE AGRICULTURAL PRODUCTIVITY.

- CHEMICALS EQUALLY HEAVILY USED IN THE PUBLIC HEALTH SECTOR TO CONTROL ARTHROPOD VECTORS OF HUMAN DISEASES.

NATIONAL CAPACITY BUILDING PROJECT TO DEVELOP A NATIONAL GHS IMPLEMENTATION STRATEGY

-THE GAMBIA RECOGNISES THE IMPORTANCE OF CHEMICAL HAZARD COMMUNICATION AS A KEY TOOL FOR PROTECTING HUMAN HEALTH AND THE ENVIRONMENT. - SIGNED A MEMORANDUM OF AGREEMENT

- WITHIN THE FRAMEWORK OF MOA THE GAMBIA WILL PREPARE GROUND FOR FULL IMPLEMENTATION OF GHS BY GHS WILL THUS: -CONTRIBUTE TO PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT FROM DANGEROUS CHEMICALS, AND FACILITATE TRADE IN CHEMICALS BETWEEN COUNTRIES.

KEY PROJECT PHASES AND ACTIVITIES FOUR MAJOR PHASES: 1. NATIONAL PLANNING AND COORDINATION. 2. PLANNING FOR PHASE PREPARATION OF A GHS SITUATION AND GAP ANALYSIS 2.2 COMPREHENSIBILITY TESTING

4. DEVELOPMENT OF A STRATEGIC PLAN FOR NATIONAL GHS IMPLEMENTATION BY NATIONAL REVIEW WORKSHOP

3. TARGETED GHS CAPACITY DEVELOPMENT 3.1 GHS TRAINING WORKSHOP 3.2 DEVELOPMENT OF A DRAFT LEGISLATION FOR GHS IMPLEMENTATION. 3.3 CAPACITY BUILDING AND STRATEGY 3.4 DEVELOPMENT OF INDUSTRY CAPACITY BUILDING AND STRATEGY 3.5 DEVELOPMENT FOR CIVIL SOCIETY CAPACITY BUILDING AND STRATEGY NATIONAL

1.NATIONAL PLANNING AND COORDINATION. - PRESENCE OF A MULTI- SECTORAL ENFORCEMENT OF HAZARDOUS CHEMICALS AND BOARD FOR PESTICIDES CONTROL AND MANAGEMENT ACT HAS ENHANCED THE ESTABLISHMENT OF A NATIONAL COORDINATION STRUCTURE

- STAKEHOLDERS CONTACTED TO CONSTITUTE THE NATIONAL COMMITTEE FOR THE STRATEGIC IMPLEMENTATION OF THE GHS.

STRUCTURE STRUCTURE PIU – PROJECT IMPLEMENTATION UNITY PCC – PROJECT COORDINATION COMMITTEE STAKEHOLDERS

THE NATIONAL GHS COMMITTEE NOW COMPRISES ORGANISATIONS THAT DIRECTLY DEAL WITH EACH OF THE FOUR SECTORS OF TRANSPORT, INDUSTRIAL PRODUCTION, AGRICULTURE AND CONSUMER CHEMICALS:

 National Agricultural Research Institute (NARI)  - NATIONAL AGRICULTURAL DEVELOPMENT AGENCY(NADA) - DEPARTMENT OF STATE FOR THE INTERIOR - THE GAMBIA RED CROSS - THE GAMBIA CHAMBER OF COMMERCE AND INDUSTRY - THE CUSTOMS AND EXCISE DEPARTMENT - FIRE AND AMBULANCE SERVICES

- ATTORNEY GENERALS CHAMBERS - NATIONAL TRANSPORT CONTROL ASSOCIATION - THE ASSOCIATION OF HEALTH AND ENVIRONMENTAL JOURNALISTS - STANDARDS AND CONSUMER PROTECTION BOARD - THE GAMBIA WORKERS CONFEDERATION - AGRICULTURAL WORKERS ASSOCIATION

2. PLANNING FOR PHASE NATIONAL GHS SITUATION AND GAP ANALYSIS

THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT (ENACTED IN 1994) PROVIDES BOTH REGULATORY AND LEGISLATIVE FRAMEWORK FOR ENVIRONMENTAL MANAGEMENT IN THE GAMBIA. IN THE SAME YEAR, THE HAZARDOUS CHEMICALS AND PESTICIDES CONTROL AND MANAGEMENT ACT WAS ENACTED AND A BOARD ESTABLISHED.

ENFORCEMENT THE BOARD HAS THROUGH NEA ESTABLISHED AN INSPECTORATE SUPPORTED BY A NETWORK OF DESIGNATED INSPECTORS FOR THE ENFORCEMENT OF PESTICIDE LAWS. DESIGNATED INSPECTORS ARE APPOINTED FROM COLLABORATING DEPARTMENTS

SITUATION ANALYSIS NATIONAL PROFILE TO ASSESS THE NATIONAL INFRASTRUCTURE TO MANAGE CHEMICALS IN 1997 IN 1999, THE GAMBIA DISPOSED OF ITS OBSOLETE PESTICIDES BY SHIPMENT TO THE UK

GAP ANALYSIS THE ABSENCE OF A FULLY OPERATIONAL POISON RECORD CENTRES AND INSUFFICIENT GOVERNMENT STAFF KNOWLEDGE ABOUT LEGAL AND TECHNICAL ASPECTS OF GHS.

COMPREHENSIBILITY TESTING (CT) LABEL, WARNING, OR SAFETY DATA SHEET TO ADEQUATELY UNDERSTAND THE INFORMATION ENOUGH TO TAKE THE APPROPRIATE PRECAUTIONARY MEASURES

3.Project Phase 2:Targeted GHS Capacity Development 3. TARGETED GHS CAPACITY DEVELOPMENT 3.1 NATIONAL TRAINING WORKSHOP FOR THE DEVELOPMENT OF A NATIONAL GHS IMPLEMENTATION STRATEGY FOR CIVIL SOCIETY

MAIN OBJECTIVE OF THE WORKSHOP WAS TO ENABLE CIVIL SOCIETY IDENTIFY CAPACITY BUILDING INTERVENTIONS NEEDED IN PROTECTING HUMAN HEALTH AND THE ENVIRONMENT FROM CHEMICAL HAZARDS.

3.2 DEVELOPMENT OF A DRAFT LEGISLATION FOR GHS IMPLEMENTATION - PCC HIRED THE SERVICES OF A LEGAL CONSULTANT TO DEVELOP GHS IMPLEMENTATION REGULATION - FIRST DRAFT SUBMITTED, REVIEWED AND VALIDATED.

REGULATIONS RECOMMENDED FOR INCORPORATION INTO EXISTING HAZARDOUS CHEMICALS AND PESTICIDES CONTROL AND MANAGEMENT REGULATIONS.

CIVIL SOCIETY AND INDUSTRIAL WORKSHOP THE GAMBIA WORKERS CONFEDERATION AND NATIONAL ENVIRONMENT AGENCY (NEA) WITH SUPPORT FROM THE UNITAR/ILO GLOBAL GHS CAPACITY BUILDING PROGRAM FUNDED BY THE GOVERNMENT OF SWITZERLAND, SUCCESSFULLY CONDUCTED A NATIONAL WORKSHOP FOR CIVIL SOCIETY.

LOBBY AND AWARENESS CREATION IN INDUSTRIES MAIN OBJECTIVE IS TO EQUIP THE INDUSTRIAL SECTOR WITH A BETTER UNDERSTANDING OF GHS PRINCIPLES

THE TEAM WAS ABLE TO COVER THE ENTIRE COUNTRY, VISITING A TOTAL OF 34 INDUSTRIAL SITES AND A TOTAL NUMBER OF ABOUT 700 INDIVIDUALS INCLUDING PROPRIETORS, MANAGERS AND INDUSTRIAL WORKERS.

ACTION PLAN DEVELOPMENT AND APPLICATION OF GHS THE “ROAD MAP” DESIGNED AT THE CIVIL SOCIETY WORKSHOP WAS FURTHER DEVELOPED BY A TASK TEAM AND PRESENTED AS A NATIONAL DOCUMENT DEVELOPED FOR EFFECTIVE IMPLEMENTATION AND ENFORCEMENT OF GHS REGULATIONS FROM 2008 – 2010.

A NATIONAL PLAN AND IMPLEMENTATION FRAMEWORK ON GHS FOR

No. ACTIVITY OBJECTIVE(S)OUTPUTRESPOSIBI LITY BUDGE T (US$) 1 TRAINING - Training needs assessme nt - Training proper - Field monitorin g and Evaluation of trainees - To conduct in-service course for Inspectors on GHS - Number of designated inspectors – Phytosanita ry, Customs, Health, etc. trained NEA, NADA (National Agricultura l Developme nt Agency), Customs 180, To train more Stakeholders on GHS - Number of stakeholder s trained NEA, NADA, Civil Society, Police - To train Popular Theatre Groups to act and formulate songs on GHS - Drama and songs made on GHS NEA, NADA, Civil Society, Police, ACD

No. ACTIVITY OBJECTIVE(S)OUTPUTRESPOSIB ILITY BUDGE T (US$) 2.INFORMATI ON, EDUCATION & COMMUNIC ATION (IEC) - Sensitisatio n, - Awareness campaigns - Monitoring and Evaluation - Mass sensitization of Stakeholders from the four categories - Industry, Agriculture, Transport and Consumers on GHS, using:- National Radio and Television, - Community and Private Radios, - Print media (Posters, banners,T-shirts, etc.) - Number of stakehold ers sensitized on GHS - Number of TV Radio notices/ shots made - Number of print media produced NEA, NADA, Civil Society, Police, ACD (Agricultur al Communic ation Division) 180, 000

No. No. ACTIVITY OBJECTIVE(S)OUTPUTRESPOSIBI LITY BUDGET (US$) 3.3. LEGISLATION - Enforcement of GHS regulations; -Monitoring and Evaluation -T o strengthen legal requirements on Licensing and Registration -To improve legal framework for the implementation of GHS - Licensing and Registrati on improved Attorney General’s Chambers, NEA, NADA 22, STRENGTHEN ING EXISTING LABORATOR Y -To build the capacity of lab assistants - To equip the lab -Five Lab assistants trained - Facilities provided for running the lab NEA200, 000 TOTAL 582,500

NEGOTIATED RESOLUTIONS Complementary to the strategic plan are the Resolutions, which have been during the process negotiated and endorsed through larger stakeholder consultations. The Resolutions have been also presented at the National Review Workshop for endorsement.

NATIONAL REVIEW WORKSHOP The workshop was attended by a fair representation of governmental, nongovernmental organizations, and Civil Society/ labour groups.