DESIGN OF WASTEWATER TREATMENT PLANT

Slides:



Advertisements
Similar presentations
CE 370 Sedimentation.
Advertisements

Stone media TF design Example 1
CLARIFIERS Prepared By Michigan Department of Environmental Quality
Treatment of Slaughterhouse Wastewater
Biological waste water treatment
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
Introduction to Septic Tanks John R. Buchanan, Ph.D., P.E. University of Tennessee.
An-Najah National University Civil Engineering Department
FE Review for Environmental Engineering Problems, problems, problems Presented by L.R. Chevalier, Ph.D., P.E. Department of Civil and Environmental Engineering.
CE 370 Filtration.
Trickling Filters and Rotary Biological Contactors
SEDIMENTATION.
Stoke’s Law and Settling Particles
WASTEWATER ENGINEERING
Math Basics I Area, Volume, Circumference, Converting Inches to Feet, Converting Flow, Converting Percent/Decimal Point, Decimal Point, Detention Time.
Stabilization Ponds CE General Characteristics Quiescent and diked Quiescent and diked Wastewater enters the pond Wastewater enters the pond Organic.
Review of Settling AKA sedimentation – suspended solids removed from liquid phase by gravity Common applications in Wastewater Treatment – grit chamber,
WASTE STABILIZATION POND (WSP). Advantages:Simplicity simple to construct simple to construct simple to operate and maintain simple to operate and.
1) Introduction Koruma Industry Koruma Tarım Established in 1949
Attached Growth Biological WW treatment Systems
SETTLING TANKS.
7.1 Wastewater Treatment Process
Sedimentation.
CHEE 370 Waste Treatment Processes
Flotation Flotation involves separation of solids from the water phase by attaching the solids to fine air bubbles to decrease the density of the particles.
Module 4: Fundamentals of Wastewater Treatment Wastewater Treatment Plant Operator Training.
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
Notes on Hydraulics of Sedimentation Tanks. A Step by Step Procedure.
Why do we need to treat wastewater ?
CE 370 Grit Removal.
Environmental Engineering Lecture 6. Sources of Drinking Water  Rivers: upland and lowland  Lakes and reservoirs  Groundwater aquifers  Sea water.
Physical Treatment Processes
DAF System Air Supply Pressurizing Pump Retention Tank
Wastewater Treatment Processes
SEWAGE TREATMENT.  Sewage is the mainly liquid waste containing some solids produced by humans, typically consisting of washing water, urine, feces,
DECENTRALISED WASTEWATER TREATMENT AND REUSE Components and Designing
Q UESTION Lecture 7: Philadelphia University Faculty of Engineering Department of Civil Engineering First Semester, 2013/2014.
ERT 417/4 WASTE TREATMENT IN BIOPROCESS INDUSTRY SEM 1 (2011/2012)
5.6 SEDIMENTATION Objective
TERTIARY PROCESS PRIMARY PROCESS SECONDARY PROCESS Wastewater Bar Rack/ Comminutor Grit Chamber Equalization Basin Primary Settling Biological Treatment.
1 IV. Wastewater Treatment Technologies Topic IV. 10. Wastewater Treatment Facilities with Attached Biomass - Trickling Filters: Kinds, Structures, Basic.
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
Secondary Clarifier Jae K. (Jim) Park, Professor
ENVE-2110 EXAM III Help Session DCC pm.
Secondary Clarifier 1.
CE 356 Fundamental of Environmental Engineering
Design of Primary Sedimentation Tank. A primary sedimentation tank is a simple settling tank, normally rectangular or circular (cylindrical) in shape.
Engineered systems for wastewater treatment and disposal.
CTC 450 Review WW Collection Systems Types of pipes Installation.
Welcome to American-Bath Wastewater Treatment Plant.
Mechanical Operation ( ) Prepared By, Hardev Jadav ( ) Sanjay k Prajapati ( ) Ravina Solanki ( )
Attached Growth Biological WW treatment Systems
DAF System Air Supply Pressurizing Pump Retention Tank
CTC 450 Review Preliminary & Primary Treatment Measure flow Screen
Settling and Flotation
Individual Household Treatment Systems (Septic Tanks)
Sizing Septic Tank Volume:
Sedimentation Tank Configurations
Environmental Engineering
Wastewater Treatment Secondary Treatment.
Maximum daily demand = 1.8 x average daily demand
6.1 Configuration of sedimentation tank
Demonstration of the sedimentation tank removal efficiency evaluation (coursework 1)
Maximum daily demand = 1.8 x average daily demand
Wastewater Treatment Secondary Treatment.
Sedimentation Sludge Zone Inlet Zone Outlet Zone V o = Q/A s The overflow rate H.
Clarifier Calculations Prepared By Debremarkos Department of HWRE Water treatment unit.
Environmental Engineering
5.7 Flocculation   Flocculation is the process of gentle and continuous stirring of coagulated water for the purpose of forming flocs through the aggregation.
Design Of Nablus-West WWTP
Presentation transcript:

DESIGN OF WASTEWATER TREATMENT PLANT

Clarifier/Sedimentation Tank Design

Design criteria The following design criteria are generally assumed to design a Primary Settling Tank / Sedimentation A) GENERAL No. of Tanks 2 or more (usually) Types of tanks Circular or rectangular Removal of Sludge and Scum Mechanical (usually) Tank bottom slope 60-150 mm/m Speed of sludge scraper 0.02 – 0.05 rpm

B) DIMENSIONS C) TECHNICAL Range Typical Rectangular Tank Length (m) 15-100 30 Width (m) 3-30 10 Depth 2.5-5 4 Circular Tank Diameter (m) 3-60 Depth (m) 3-5 Bottom slope, (mm/mm) 0.02 – 0.05 0.03 B) DIMENSIONS Range Typical Detention Time, t (hr) 1.0 – 4.0 2.0 Flow Through velocity (m/min) 0.6 – 3.6 0.9 SLR (m3/m2/hr) at average flow 1.2 – 2.5 1.6 Peak Hourly Flow 2.0 – 5.0 4.2 WLR (m3/m/d) 125 - 500 250 C) TECHNICAL

Primarily used in WWT to separate solids from liquids in effluent streams. Types light Clarifiers Criteria for sizing clarifier (settling tank) Tank depth at the side wall Overflow rate (surface loading rate) Detention time Scour velocity

Criteria For Sizing Clarifier (Settling Tank) -Overflow Rate (Surface Settling Rate)- Definition: The average daily flow rate divided by the surface area of the tank. Clarifiers Average daily flowrate (m3/day) overflow rate @ surface settling rate (m3/m2d) Total surface area of the tank (m2)

Criteria For Sizing Clarifier (Settling Tank) Average daily flowrate -Depth Of Tank- The water depth at the side wall measuring from the tank bottom to the top of the overflow weir. Depth of tank Effluent weir Exclude the additional depth resulting from slightly sloping bottom that is provided in both circular and rectangular clarifiers. Influent Influent H Occupied with sludge Effluent weir loading (typical= 250 m3/m.d) is equal to quantity of WW flowing divided by the total weir length, Lw Average daily flowrate (m3/day) Total weir length (m)

Criteria For Sizing Clarifier (Settling Tank) Average daily flowrate -Detention Time- length of time a particle or a unit volume of WW remains in a reactor Detention time Tank volume (m3) Detention time = (day) Average daily flowrate (m3/day)

Criteria for sizing clarifier (settling tank) -Scour velocity horizontal velocity through the tank to avoid resuspension of settled particles Scour Velocity Where: VH = horizontal velocity that will just produce scour (m/s) k = cohesion constant that depends on type of material being scoured (unitless) s=specific gravity of particles g=acceleration due to gravity (9.81 m/s2) d=diameter of particles f=Darcy-Weisbach friction factor (unitless)

Example:

Stabilization pond design

In series

Design Parameters

Facultative Pond

Design Criteria Surface Organic Loading Rate Depth Detention Time Geometry (L/B ratio)

Surface Organic Loading Rate Related with algae activity and balance between oxygen production and consumption.

Depth

Depth

Depth Based on volume, V and the required area, A , the depth (H) of pond = V/A. H = 1.5 to 2.0 m

Detention time In primary detention time,t usually vary from 15 to 45 days.

L/B Ratio

If K = 0.35d-1 θ=1.085 If K = 0.30d-1 θ=1.05

Example

Solution

ANAEROBIC POND DESIGN

Volumetric Loading Rate

Volumetric Loading Rate

Detention Time

Depth

L/B Ratio

AEROBIC POND DESIGN Design Criteria Detention time, t = 5 to 10 days Depth, H = 2.5 to 4.0 m Oxygen Requirement Power Requirement

Oxygen Requirement

Power Requirement

Activated sludge design