ERT 417/4 WASTE TREATMENT IN BIOPROCESS INDUSTRY SEM 1 (2011/2012)

Similar presentations


Presentation on theme: "ERT 417/4 WASTE TREATMENT IN BIOPROCESS INDUSTRY SEM 1 (2011/2012)"— Presentation transcript:

1 ERT 417/4 WASTE TREATMENT IN BIOPROCESS INDUSTRY SEM 1 (2011/2012)

2 TERTIARY PROCESS PRIMARY PROCESS SECONDARY PROCESS Wastewater Bar Rack/ Comminutor Grit Chamber Equalization Basin Primary Settling Biological Treatment Secondary Settling Advance Wastewater Treatment PRETREATMENT PROCESS

3 light Retain solid found in influent WW to the treatment plant Principle role Screening Coarse screen Remove coarse materials (e.g. sticks, rags, etc) from the flow stream that could damage subsequent process equipment Reduce overall treatment process reliability & effectiveness Contaminate waterway Fine screen (used in place of/following coarse screen) Where greater removals of solids are requiredd to Remove coarse materials (e.g. sticks, rags, etc) from the flow stream that could Protect process equipment Eliminate materials that may inhibit the beneficial reuse of bioslid

4 The bar screen may be manually cleaned or mechanically cleaned (performed frequently enough to prevent solids buildup and reduce flow into the plant) light The flow passes through the screen and the large solids are trapped on the bars for removal. Bar Screen/ Bar Rack A screen composed of parallel bars is called “bar rack” & fine screen consists perforated plates. The bar screen may be coarse (6 – 150 mm/ 0.25 – 6 inch openings) or fine (< 6 mm/0.25 inch openings).

5

6

7 light Remove grit (sand, egg shells or other heavy solid materials) that tends to settle in corners, bends, reducing flow capacity and ultimately clogging pipes and channels. Grit chamber are provided to Grit Chamber Protect moving mechanical equipment from abrasion Reduce formation of heavy deposits in pipelines, channels & conduits Reduce the frequency of digester cleaning caused by exessive accumulation of grit Grit removal processes use gravity/velocity, aeration or centrifugal force to separate the solids from the wastewater. The most common method of grit disposal is transport to a landfill. In some large plants, grit is incinerated with solids

8 Once screened, the wastewater passes into two aerated grit chambers. Low- pressure air entering the grit chamber creates a rolling motion that causes grit and dense solids to settle to the tank bottom.

9 light used to intercept coarse solid & shred them in the screen channel The use of comminutor and macerator is adventageous in a pumping station to: Comminutors & Macerators Protect pump againts clogging by rags & large objects Eliminate the need to handle & dispose of screenings However, shredded solid (plastic bags, rags) tends to form ropelike strands & can clog pump impellers, sludge pipelines & heat exchangers). The solids are cut up into a smaller, more uniform size of for return to the flow stream for subsequent removal. The comminutor will not remove solids that are too large to fit through the slots, and it will not remove floating objects. The materials must be removed manually

10

11 To minimize fluctuations in WW characteristics in order to provide optimum conditions for subsequence process To provide adequate dampening of organic fluctuations in order to prevent shock loading to biological system Provide adequate pH control Provide cont. feed to biological system Provide capacity for controlled discharge To prevent high conc. of toxic materials from entering the biological treatment plants. Bar Screen / communitor Grit Removal Equalization Basin Primary Treatment Effluent for further treatment Q t Q t

12

13 Objectives:  Prepare WW for biological treatment (stabilize organic)  Remove + 60% SS and 35% BOD 5 in sewage ( primary & secondary process handle MOST of the NON-TOXIC wastewater) Devices/structures: Sedimentation, accelerated gravity separation, floatation, filtration, gas stripping, chemical precipitation, adsorption etc. Remove by settling @ floating Oil, gas and suspended solid are removed by floatation, sedimentation and filtration.

14 Objectives:  Speed up natural process of breaking down biodegradable organics  Remove up to 85 % SS and BOD 5 Devices/structures: Activated sludge, extended aeration, rotating biological contacting (RBC), trickling filter, aerated lagoons, sequencing batch reactor etc Biological degradation of soluble organics. Mostly aerobically in an open aerated vessels @ lagoon Speed up natural processes of breaking down biodegradable organics Cannot remove N, P, heavy metals, pathogens, bacteria and viruses. After treatment, microorganism and other carried over solids are allowed to settle. A fraction of sludge is recycle Excess sludge along with sediment solids has to be disposed off.

15 Objectives:  Nutrients removal, chlorination and dechlorination  Process added after biological treatment in order to remove specific group/ types of residual  Can remove + 95% BOD 5, P, SS, bacteria and N Devices/structures: Filtration –removes SS Granular Activated Carbon – removes organics Chemical oxidation – removes oxidizable organics Expensive to process LARGE VOLUME of WW Such a polishing process

16

17

18 of organic matter or by substance added to the WW. light Depends on the degree of treatment required to bring the quality of raw wastewater to a permissible level of treated wastewater (eg. Effluent from the treatment plant) This ensures that the final effluent is either safe for disposal or acceptable for specific reuse or recycling. Other significant factor that will influence the selection of a treatment system Selection of treatment process Ref: (Karia and Christian,2006) Availability of funds and land at the treatment site Non-availability of suitable mechanical equipment and skilled personnel for running and maintaining the plant. The topography of land at the treatment site

19 of organic matter or by substance added to the WW. light Reduction of inorganic material component of wastewater is much easier and cheaper than removal of organics contents of wastewater Removal of suspended solids from wastewater requires lesser time and efforts than of colloidal and dissolved solids In many countries, the Environmental Protection Act requires at least the secondary treatment system for all publicly owned treatment works such as municipal wastewater treatment plant, so that effluent requirements of 30mg/L for BOD and 100mg/L of SS are achieved. The points to keep in mind while selecting the treatment process Ref: (Karia and Christian,2006)

20 Essential consideration Hydraulic flow diagram Strength & characteristics of WW Flow rate and their fluctuations Mass loading Design criteria

21 of organic matter or by substance added to the WW. light The strength of wastewater is normally expressed in terms of pollution load, which is determined from the concentrations of significant physical, chemical and biological content of wastewater. Characteristics of WW depend on the quality of water used by the community, culture of population, type of industries present & treatment given by industries to their WW. The strength of WW measured as mass per unit volume of WW (Units: mg/L or kg/d If characteristics of raw WW show the concentration of specific constituents like BOD & SS within the standard permissible limits, there is no need to treat the WW. Strength & characteristics of WW

22 of organic matter or by substance added to the WW. light Is the quantity or volume of wastewater in terms of rates It is the total quantity of wastewater generated daily and to be treated every day. The flow rate units:m 3 /day or m 3 /s or MLD (million Litres per Day) The volume of WW depend on the water consumption by the population for its various activities FLOW RATE & THEIR FLUCTUATIONS Normally a treatment plant is designed on the daily average flow basis which is known as plant capacity. Example: 1 MLD (Million Litres per Day) plant means = the plant designed for 1 – ML daily average flow of WW

23 of organic matter or by substance added to the WW. light The mass pollution load is defined as flow rate & strength of WW & is expressed as load per unit time Example: WW having 1000 m 3 /d flow & 200 mg/L (g/m 3 ) BOD has the mass pollution load of BOD equal to 200 kg/d (1000 m 3 /d X 200 g/m 3 X 10 -3 g/kg) In the case of treatment plant that receives flow of combined sewerage system, the seasonal variation in the rainy season will lower down the BOD & SS concentration due to the dilution because of the added amount of storm water. On the other hand, a higher concentration of BOD & SS may be observed during the dry weather period. MASS LOADING Therefore, in almost all cases, a flow-weighted average should be used because it is more accurate method of analysis

24 Where, X W = flow –weighted average concentration on the constituent X i = average concentration of the constituent during the “i” time period Q i = average flow rate during “i” time period

25 of organic matter or by substance added to the WW. The data determined through the research and laboratory scale model studies as well as those obtained from the operational experience of field and pilot scale WW treatment facility. The values of such guideline parameters are called design criteria and available in the literature. The most frequently assumed criteria for designing a conventional WW treatment plant (WWTP): Detention period or time Flow through velocity Settling velocity Surface loading rate @ over flow rate Weir loading rate Organic loading (BOD @ COD @ VSS loading) Food to Microorganism ratio, F/M Mean cell Residence Time Hydraulic Loading Volumetric Loading Basin geometry (L:B:D) length, breadth and depth ratio.

26 of organic matter or by substance added to the WW. light Shows the reduced levels or elevations of WW surfaces & the top surfaces of all the units of a treatment plant, level of other significant features like weirs, foundation levels of pumps Typical hydraulic profiles for 3 units of WW treatment plant. Why necessary?? HFD They provide the hydraulic gradients from which it can be ensured whether the gradient is sufficient for the flow of WW from 1 unit to another by gravity. To ensure no back flow or flooding of units when the final effluent is disposed into natural system (rainy season)

27

28 light Process of heavier solid particles in suspension, settle to the body of tank by gravity Removal of SS from WW Sedimentation Depends on Velocity of flow Size and shape of particles Viscosity of water Types of particles Discrete /non-flocculant particles Flocculant particles Size & velocity constant during the settling Size & velocity fluctuates during the settling LESS COSTLY than many other treatment processes Common operation & found almost in WWT plant

29 The settling of discrete particles can be analysed by means of the classic laws of sedimentation by Newton & Stokes The gravitational force The density of the particle The density of the water The volume of the particle

30 light In the design of sedimentation basin, the settling velocities of the particles MUST be KNOWN. sedimentation The knowledge of settling velocity of particle is used to determining the depth of a treatment unit to separate the suspended solids (particulate matter) by gravity settling and for checking the adequacy of length or diameter of a tank to remove particles before the effluent flows out of the basin. Assumption: A sand particle of 0.2mm size with specific gravity of 2.65 is observed to settle at a rate of 2.3cm/s

31 Idealized discrete particles settling in 3 different type of basins Inlet zone Outlet zone Sludge zone RECTANGULAR BASIN CIRCULAR BASIN UPFLOW BASIN Sludge zone Inlet zone Outlet zone Inlet zone Outlet zone Settling zone Settling zone Settling zone

32 Rectangular Basin Circular Basin

33 Classification of particles settling Type 1 Discrete Type 2 Flocculant Type 3 Zone

34 Particles DOES NOT change in size, shape & density during the settling process Particles settle discretely at a constant velocity Settle as individual particles & do not flocculate Occurs during: Presedimentation for sand removal Grit Chamber

35 Flocculate during sedimentation Particles size constantly changing Settling velocity is changing increase with depth & extent of flocculation Occurs during: Alum or iron coagulation Primary sedimentation basins

36 The floc particles adhere together & the mass settle as a blanket (layer) Distinct clear zone & sludge zone present Concentration HIGH (greater than 500 mg/L) Occurs during: Activated sludge sedimentation Sludge thickeners Solid settle water

37 Initially, all the sludge is at uniform concentration A A settling proceeds, the collapsed solid on the bottom of the settling unit (D) build up at constant rate. C is zone of transition through which the settling velocity decrease as a result of high conc. of solid. Through the transition zone C, the settling velocity will decrease due to the increasing density & viscosity of the suspension surrounding the particles. When the rising layer of settle solid reaches the interface, a compression zone occur. Transition zone Dense solid A B A D C C A D B B D High of sludge liq interface Settling properties of flocculated sludge Settling Zone Transition Zone Compression Zone

38 The following design criteria are generally assumed to design a Primary Settling Tank / Sedimentation A) GENERAL No. of Tanks2 or more (usually) Types of tanksCircular or rectangular Removal of Sludge and ScumMechanical (usually) Tank bottom slope60-150 mm/m Speed of sludge scraper0.02 – 0.05 rpm

39 B) DIMENSIONS RangeTypical Rectangular Tank Length (m)15-10030 Width (m)3-3010 Depth2.5-54 Circular TankDiameter (m)3-6030 Depth (m)3-54 Bottom slope, (mm/mm) 0.02 – 0.050.03 RangeTypical Detention Time, t (hr)1.0 – 4.02.0 Flow Through velocity (m/min)0.6 – 3.60.9 SLR (m3/m2/hr) at average flow1.2 – 2.51.6 Peak Hourly Flow2.0 – 5.04.2 WLR (m3/m/d)125 - 500250 C) TECHNICAL

40 light Clarifiers Types Overflow rate (surface settling rate) Primarily used in WWT to separate solids from liquids in effluent streams. Criteria for sizing clarifier (settling tank) Tank depth at the side wall Detention time

41 Clarifiers Definition: The average daily flow rate divided by the surface area of the tank. overflow rate @ surface settling rate (m/d) Average daily flowrate (m 3 /day) Total surface area of the tank (m 2 )

42 Depth of tank The water depth at the side wall measuring from the tank bottom to the top of the overflow weir. Exclude the additional depth resulting from slightly sloping bottom that is provided in both circular and rectangular clarifiers. Influent Occupied with sludge Influent Effluent weir H Effluent weir loading is equal to quantity of WW flowing divided by the total weir length, L w Average daily flowrate (m 3 /day) Total weir length (m)

43 Tank volume (m 3 ) Detetion time (d) Average daily flowrate (m 3 /day) Detention time length of time a particle or a unit volume of WW remains in a reactor

44 of organic matter or by substance added to the WW. light Use for the removal of lighter SS, oil & grease. Also used concentrate biological sludge and to separate both the fine solid and a liquid particles from the liquid phase The separation of particles takes place near the top of the tank, at the surface level of liquid. Thus, the operation is just the opposite of that of gravity sedimentation where particles get removed at the bottom of the tank. Flotation

45 Flotation system Systems Based on Formation of Air Bubbles Air flotation Vacuum flotation Dissolved air flotation Systems based on recirculation of effluent Effluent is recirculation Effluent is not recycled

46 Systems Based on Formation of Air Bubbles Air flotation Vacuum flotation Dissolved air flotation air bubbles are formed by introducing the air in the form of gas phase directly into the liquid phase either by a revolving impeller or through air diffusers at the atm pressure. WW is first saturated with air either directly in the aeration tank or by introducing air at the pump side. Then partial vacuum is applied so that dissolved air can come out of solution as minute bubbles. The air bubbles and particles attached to them then rise to the surface forming a scum blanket. Flotation is achieved first by dissolving the air in the WW or in a portion of treated effluent (liquid) under high pressure in the pressurizing or retention tank and then reducing the pressure of the WW through a pressure-reducing valve to atmospheric level during feeding it to the flotation tank to form the rising air bubbles.

47 A predetermine fraction of effluent from the flotation unit is taken to the pressurized tank where it is pressurized, and the air is dissolved below the saturation level. The flow is then mixed with the influent entering the flotation unit through a pressure-reducing valve so that air bubbles come out from the recycled flow and get attached with the particles of incoming raw wastewater that are to be removed by flotation. Systems based on recirculation of effluent In large treatment plants, normally 15-20% of the effluent is recycled Small treatment plants operate without recycling the effluent. Effluent is recirculation Effluent is not recycled Wastewater influent is first retained for some time in the pressure tank where pressure of wastewater is increased to as high as 275- 350kPa and air is dissolved in it. Then the flow is fed to the flotation unit through a pipeline having a pressure- reducing valve. As the pressure is released from wastewater, the dissolved air comes out of the solution as fine bubbles which are used for particle separation by flotation.

48 Design consideration Concentration of particles to be removed Particle rise velocity or buoyant force Air/solid ratio Solids loading rate Quantity of air required for formation of air bubbles

49 Dissolved air flotation units are usually designed on the basis of the air to solid ratio, A/S, using the following equations: For system with recycle For system without recycle Where, A = volume of air (ml) S = mass of solids (mg) 1.3 = weight of 1ml of air (mg) S’a = solubility of air in (ml/L) (temp depended funct) f = fraction of air dissolved at pressure P (atm) P = operating pressure (atm) Si = influent suspended solids or sludge solids (mg/L) Qr = pressurized recycled flow (m 3 /d) Q = mixed liquor flow (m 3 /d)

50 Design Criteria Hydraulic retention time, HRT 20-30min (for efficient primary clarification) Rising rate or surface loading rate 0.06 – 1.63 m 3 /min-m 2 Rising velocity of air-solid mix when no flocculants are used 2.56 – 12.7 cm/min when flocculants are used 20 – 60 cm/min

51 light Employ for the removal of SS, following coagulation in physical-chemical treatment or as tertiary treatment following the biological WW treatment process SS are removed on the surface of the filter staining and through the depth of a filter by both staining and adsorption. Filtration The efficiency of filtration process is a function of The concentration and characteristics of the solid in suspension The method of a filter operation Characteristic of a filter media & other filtration aid

52 The filter run terminates when: Filtration the total head loss reaches available driving force excess SS or turbidity appears in the effluent. Filtration rate will effect : The build up of head loss the effluent quality attainable The head loss through the filter is related to the solid loading Where, H = head loss (m) S = solid captured (kg/m 2 ) a, n = constant

53 MaterialShapeRelative Density Porosity (%) Effective Size (mm) Silica sandRounded2.65420.4-1.0 Silica sandAngular2.65530.4-1.0 Ottawa sand Spherical2.65400.4-1.0 Silica gravel Rounded2.65401.0-5.0 anthraciteAngular1.5-1.7550.4-1.4 garnetangular3.1-4.3460.2-0.4

54

55

56 Use to separate dissolved and colloidal constituents from WW Membrane Process Components in water are driven through a membrane under the driving force of: pressure electrical potential The size of the opening in the membrane are a major determinant of species that can pass because the opening present a physical barrier to any substances that are larger than openings. concentration gradient A semi permeable membrane is SELECTIVE to the species it passes. Semi permeable membrane Permeate Retentate The liquid passing through the membrane The fraction not passing through the membrane.

57 Mass transfer through a membrane proceeds in both directions. Membrane Process Membrane characteristics govern the direction in which the solutes and solvent are traveling. If a pressure force is applied to the more concentrated solution, the flow of the liquid can be reversed (reversed osmosis, RO). The distance over which the pressure difference occurs. The net pressure difference above the osmotic pressure If a pressure force is applied to the more concentrated solution, the flow of the liquid can be reversed (reversed osmosis, RO). The area of the membrane

58

59 Where, m = mass of water pressed t = time A= area of the membrane x = length N w = flux of water (mass/area.time) k w = resistance coefficient ∆P = applied pressure ∆P o =osmotic pressure or

60 Membrane Process Resistance coefficient is a function of: fouling solutes in water Concentration Polarization membrane characteristics temperature is one cause of membrane fouling. High concentration of dissolved ions on feed side of the membrane cause solubility products to be exceeded with deposition of the precipitates on the membrane.

61 The flux of solute depends on the concentration gradient and a resistance parameter. Membrane Process Measurement of the ability of membrane to reject the passage of a species i, Rejection coefficient Where, Ns = flux of solute Ks = resistance parameter for solute passage Cr = conc of solute in the feed Cp = conc of solute in the permeate. Where, Ri = the rejection coefficient Cif = conc of species i in the feed Cp = conc of species i in permeate

62 light Fouling of a membrane increase resistance to flow and reduces the flux of water through a membrane Backwashing or chemical treatment may be applied to remove foulants. Membrane Process Irreversible fouling of membranes is the most serious problems. Oxidizing agents such as chlorine or ozone attack membranes and change their structures.

63

64