FHWA and MAP-21 A Business Approach Southeast Regional Maintenance Conference Biloxi, MS November 20, 2013 Butch Wlaschin, P.E. Director, Office of Asset.

Slides:



Advertisements
Similar presentations
1 AASHTO - FHWA Peer Exchange on Asset Management and Performance Management July 26-27, 2010.
Advertisements

Transportation Planning Association Meeting MAP 21 PERFORMANCE MEASURES February 19, 2013.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
An Overview of Notice of Proposed Rulemakings And TAM Plans MAP-21 National Performance Management Measures.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Larry Galehouse, PE, PS, Director.  Established on July 11, 2003  Created to promote pavement preservation nationally and provide technical support.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
Operations / ITS Provisions in SAFETEA-LU What’s in There and What’s Not Jeff Lindley Operations / ITS Discipline Meeting August 16, 2005.
Designated by US DOT Publication of Draft PFN for Comments - Spring 2013 Initial Designation of the PFN – Fall 2013 National Freight Network Primary Freight.
MAP Washington State Public Transportation Symposium August 26, 2013.
January 16, 2014 Federal Highway Administration Arizona Rural Transportation Summit.
MAP-21 Overview and Programmatic Impacts February 4, 2013 Serge Phillips MnDOT Federal Relations Koryn Zewers.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Irene Rico Division Administrator Federal Highway Administration Moving Ahead for Progress in the 21 st Century ~ MAP-21.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
Performance Measurement Requirements Notice of Proposed Rule Making.
Accomplished to date:  Extensive outreach  Guidance and FAQs on most programs  FY13 apportionments Underway:  Final guidance and FAQs on some topics.
Moving Towards a Sustainable Freight System. Executive Order B Action Plan – July 2016 Targets Actions Pilot Projects 2.
TAM ETG Webinar #3 Network Life Cycle Analysis Part 1: Introduction and Overview Wednesday, July 8,
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration Performance Management and Performance-Based Planning and.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Patrick Weidemann Ryan Wilson, P.E., AICP Minnesota Department of Transportation MnDOT – ACEC/MN Annual Conference March 5, 2013.
FY 2012 President’s Budget Released February 14, 2011.
Ohio Transportation Planning Conference July 16, 2014.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration Regional Workshop on Performance Management and Performance-Based.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Butch Wlaschin Director, Office of Asset Management Federal Highway Administration AASHTO Highway Subcommittee on Construction 2009 Summer Meeting Chicago,
Overview of the Work Zone Safety and Mobility Rule Module 1.
FHWA - O FFICE OF A SSET M ANAGEMENT October 14, 2009 Managing our Pavements FHWA Initiatives U.S. Department of Transportation Federal Highway Administration.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
Manage by Measure: Just Do It AASHTO SCOPM Annual Meeting October 23, 2009 Steve Simmons TxDOT Deputy Executive Director.
U.S./Canada Transportation Border Working group April 9, 2014 Roger Petzold Office of Planning Federal Highway Administration.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
US DOT Planning for Operations Initiative – An Update AASHTO SCOH Annual Meeting June 14-17, 2009 Manchester, NH Rick Backlund – FHWA Office of Operations.
MAP-21 Implementation and Reauthorization May 6, 2013 Providence, Rhode Island.
FHWA Updates WASHTO Committee on Maintenance Cheyenne, Wyoming March 8, 2010 U.S. Department of Transportation Federal Highway Administration.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey A. Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
‘‘Moving Ahead for Progress in the 21st Century Act’’ or ‘‘MAP–21’’ Signed into Law July 6, 2012 Implications for Infrastructure Asset Management, Pavement.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
Presented by Standing Committee on Performance Management: Update and Status July 26, 2010 Kirk T. Steudle, Director Michigan Department of Transportation.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
Title Subtitle Meeting Date Office of Transportation Performance Management T3 Webinar Traffic Incident Management (TIM) Performance Measures June 12,
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
30 th Annual IDOT Fall Planning Conference October 14-16, Change… Challenge… Innovate… Kay Batey.
Implementation: Results from the Using Your Regional ITS Architecture Peer Exchange Network Workshop Mac Lister FHWA Resource Center ITS America Annual.
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
Insert picture(s) here Amy Simpson, Ph.D., P.E. Gonzalo Rada, Ph.D., P.E. Beth Visintine, Ph.D. Jonathan Groeger Rutting as a Performance Indicator.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Presented by: Peter Loughlin September 23, THE PAST YEAR September 30, 2009 Program Expired Short Term Extensions – GF Transfers $8b in 08, $7b.
Safety Data Initiatives in Reauthorization – What Can We Expect? Kathy Krause, FHWA Office of Safety 30 th Annual International Traffic Records Forum July.
Office of Major Project Development (OMPD) Overview November 2015.
97 th Annual Purdue Road School Presented by: Katie Zimmerman, P.E. Applied Pavement Technology Transportation Asset Management.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21st Century An Update on Implementation.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 and Managing National Highway Performance Michael Nesbitt Federal Highway.
PROJECT DELIVERY TEAM Design, ITS and ADHS Construction, Maintenance and Asset Management Team Leader, Pavement and Materials Safety, Emergency Relief.
UW - Madison Federal Highway Administration (FHWA) David L. Kopacz, P.E. Wisconsin Division Office February 20, 2015.
AASHTO – SCOPM Palm Desert, California October 23, 2009 Mn/DOT Performance Management - Setting our Direction.
 SCDOT has over 41,000 miles of pavements and over 8,400 bridges.  4 th largest state maintained system in the country.  Started working on the TAMP.
Moving transportation into the future
River to Sea TPO Board Meeting October 26, 2016
Update on the South Dakota Digital Cadastral Initiative
2018 Pavement Workshop May 23-24, 2018
Performance-Based Federal Highway Program Implementation Update
NRRA Pavement Workshop 2019
MODULE 11: Creating a TSMO Program Plan
Presentation transcript:

FHWA and MAP-21 A Business Approach Southeast Regional Maintenance Conference Biloxi, MS November 20, 2013 Butch Wlaschin, P.E. Director, Office of Asset Management, Pavements & Construction

FHWA Current status 2014 funding Authorization expires 9/30/2014 One of many issues in Congress Funding remains the major issue Preservation of existing assets Safety of Bridges Highway safety Freight movement

MAP-21 2-year Bill (5 years with 2 years of funding) Current Funding Levels Extended Notable Provisions NHPP – STP New rules: Planning System Performance HSIP Asset Management Tunnels

MAP-21 Single Earmark $12M Innovation and Deployment Pavements Program Focus on moving research off the table and into everyday practice 6-week Materials Training Maintenance Academy

MAP-21 Buy America Emergency Relief Value Engineering Expanded National Road System NHS – Plus (220k)

MAP-21 Current Issues Development of Asset Management Process and Plan Pavement condition assessment (IHS and NHS) Bridge Condition assessment (IHS and NHS) Performance of IHS Minimum Condition for IHS Reestablish criteria for PMS and BMS

MAP-21 Collaborative effort with AASHTO Outreach to Partners – AGC, ARTBA, NACE etc. Rule making – 18 months

MAP-21 Asset Management Establishing a process: Strategic Vision and Goals Inventory and condition Gap Analysis Life-cycle coast and Risk Management Financial Plan Investment Strategy

MAP-21 Asset Management New minimum requirements for PMS and BMS Needs to include preservation Focuses on long term

MAP-21 Asset Management Short term performance measures Looks at life cycle costs and risk Keys to long term performance Stay away from worst-first Are you at the table discussing Asset Management with your senior management?

Asset Management Risk analysis Agency Risks Lack of funding Loss of historical information Climate What IF you don’t do maintenance or preservation What IF you don’t have a balanced program Program Risks Level of service Project Risks

Asset Management Investment Scenarios Stove pipe Cross asset Cross mode Mix of fixes Touch as many miles as you can with the dollars you have Right treatment, right time, right place, right people

MAP-21 Draft NPRM for Asset Management Process in legal review Fall – planned publish date day review and comment period Final Rule mid-to-late summer 2014 Staggered implementation

MAP-21 Hosting training session – on-site and via the WEB. Monthly bookclub discussions by leading states Pilot projects in NY, MN and LA NV, OR and AK Financial Plan workshops Peer Exchanges Still under discussion – Certification and Approval

MAP-21 Beginning of 2 nd FY Processes need to be Certified or Sanctions imposed Needs to lead to a “program of projects” that will be used in conjunction with other program “Plans” to formulate the STIP and TIP

MAP-21 Significant state participation in the learning process Nearly all states engaged and in various stages of development Documenting existing processes, bringing them out from the maintenance shed to the front office. When was the last time your assets were discussed at a public meeting?

MAP-21 (Part 2) Infrastructure Performance Measures Pavement and Bridge Bridge pretty straight forward But – pavements No common measures No common language No common definitions AC – PCC – Composites Surface treatments – preservation - maintenance

MAP-21 Infrastructure Performance Measures Still linked to IRI, but other aspects Matrix – IRI, Rutting, cracking, faulting Group road segments as Good Fair Poor Establish minimum condition for the Interstate

MAP-21 Potentially multiple measures for pavements HMA PCC Composites Each would require a target Local roads on NHS

MAP-21 Infrastructure Performance Measures Outreach and collaboration with AASHTO SCOPM and JTCP No common standards, procedures, or analysis tools Lane miles vs centerline miles 4 lane divided vs lane no median Where does VMT fit? Composites - 6 lane divided 6 composites? HMA vs PCC

MAP-21 Infrastructure Performance Measures Calibration centers – FWD – Skid Common analysis tools Common standards Drive / operator certification Should FHWA do the annual measures? Role of HPMS reporting system

MAP-21 Infrastructure Performance Measures DRAFT NPRM nearly complete Tentative publishing date late days for review and comment Final Rule late summer 2014

MAP-21 Key note: Overall coordination will be discussed in Safety Performance Measures rule coming out early this fall. Links new planning rule with asset management rule and pavement performance rule.

Asset Management Common approach in private sector Toll Authorities Concessionaires (HOV / HOT) More advanced states: 7-8 assets Multi-modal (Highways, Airports, Rail, Transit)

Asset Management Common Business model United BNSF US NAVY Changing culture Building the system (Expansion) Service Provider (Preservation)

Asset Management Common approach Where would you / should you spend that next dollar? Data driven – risk-based decision Do you wait until the car stops running to change the oil?

Maintenance Academy 2 week class 2 days webbased people $2000 per person Texas – 2010 Tenn – 2012 Ariz – 2013 Texas Utah – 2014/2015

Thank You Contacts: Butch Wlaschin Steve Gaj Nastaran Saadatmand