PROJECT DELIVERY TEAM Design, ITS and ADHS Construction, Maintenance and Asset Management Team Leader, Pavement and Materials Safety, Emergency Relief.

Similar presentations


Presentation on theme: "PROJECT DELIVERY TEAM Design, ITS and ADHS Construction, Maintenance and Asset Management Team Leader, Pavement and Materials Safety, Emergency Relief."— Presentation transcript:

1 PROJECT DELIVERY TEAM Design, ITS and ADHS Construction, Maintenance and Asset Management Team Leader, Pavement and Materials Safety, Emergency Relief and Traffic Operations Professional Development Program Transportation Engineer

2 FHWA – Every Day Counts Every Day Counts 2: FHWA/KYTC Initiatives -3-D Modeling: 1 Project – D09 (KY 7); -Ongoing Evaluation; -Transportation Incident Management (TIM): -523 responders trained -in 6 Agency Types; -High Friction Surface courses: -95 sites; -84% Crash Reduction over three years -Accelerated Bridge Construction (ABC): -Guidance Developed by Bridge Division -Increased implementation of ABC for low volume bridges

3 MAP 21-Changes to the Federal Program -ER Program: -FHWA April 2, 2013 letter to KYTC -Categorical Exclusion expanded use -Must include FHWA Form 1273 in contracts -Debris removal To Be completed by FEMA funds with a Presidential Declaration -Buy America Application to Utilities; -All Utilities on a Federal Aid Project -Utilities reimbursed with Federal Aid -Utilities Not reimbursed with Federal Aid -Thank you for all you do!

4 MAP 21 and Performance Measures > Final Rule effective February 27, 2013 - Amended 23 CFR 635.411 Material or Product Selection... autonomy to State DOTs regarding the selection of culvert and storm sewer material types  MAP-21 Requirement: Risk and performance based measurements on the NHS: Examples,  Interstate must meet an established IRI target value  NHS bridges must meet established target values

5 Construction and Work Zones Other For Kentucky (Construction) Supplemental Specifications Change Order Process Work Zones

6 HSIP MAP-21 Investment Plan –Outlines project types and expenditures Notice of Proposed Rulemaking Coming Soon –Potential changes to program I-69 Corridor Interstate Designation and Improvements Highway Safety Improvement Program

7 Highway Design, ITS and ADHS Design –ADA Training to KYTC Peer-2-Peer with INDOT Design for Pedestrian Accessibility –2 sessions in 2014 –Interstate Access (Statewide) Approx. 10 proposals in last 18-months –Corridor Geometric Design (DES/GLS) I-69 + I-65 widening through D04 –Standard Drawings –3DM (EDC2) ITS –New rule on travel time (Traffic Ops) ADHS –Annual Status Update submitted to ARC

8 Oversight – CAP/PODI Being Developed Compliance Assessment Program (CAP) –52 Projects Randomly Selected –Core Project Questions and Areas of Review: DBE Work Zone Traffic Control Environmental Commitments Projects of Division Interest (PODI): –Currently being identified –Interstate/APD/Federal Actions and Program Areas