Reddington Rd Reddington Rd. T G Fire Hydrant # 198 Lateral Pole Sewer Cover Gas Meter 33’ 65’ 76’ 18’ CL of road CL of Road 53’ 86 ‘ Gas line is 5’ off.

Slides:



Advertisements
Similar presentations
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Advertisements

Pythagorean theorem PROBLEM SOLVING.
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Various services have to be connected. Here the sewer is being connected and pipes laid for storm water removal.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Georgia underground marking standards
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Newmarket Viaduct Replacement STAGED VIADUCT CONSTRUCTION / DECONSTRUCTION PROCESS PROJECT DELIVERY BY NGA NEWMARKET.
CDOT MicroStation and InRoads Transition NH SH 119 & SH 52
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
DIGITAL HIGHWAY MEASUREMENTS TURNER-FAIRBANK HIGHWAY RESEARCH CENTER David Gibson Milton (Pete) Mills Morton Oskard ADVANCED RESEARCH PROJECT 1.
Pavement Markings Quiz Q. 1 & 2. Pavement Markings Quiz Q. 3.
July 23, 2013 Street by Street Committee. 2 Projects SW 48 th Ave & Garden Home 3900 block of NE 59 th Ave.
South Portion of Reroute North Portion of Reroute.
Route 6 CorridorProject Limits Exit 1 Exit 2 Exit 3 Exit 4 Barnstable T.L.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
HWY 15 N & Miramar Way. The fire moves south down Oak Canyon toward the 52 freeway.
Cherokee Bend Phase II, Roadway Pavement: Atoka Trail Request to Complete Roadway Pavement of Atoka Trail to Live Oak Church Road Shoal Lake Homeowners.
Contour and Topo map Applications Profile View (Longitudinal Sections): Roads, Canals, Pipes,… Cross-Sectional View, Roads, Canals, Pipes, Building,…
Civil Engineering Quiz
WUP: TOC = “Objective – Day 3”
Utility Data Collection and Use for Disaster Response Steve Henderson GIS Coordinator City of Gulf Shores.
Instructions: Your team should use the following slides for your camera point. You need to make different 3 sets of slide – one for each of your three.
2.75 Miles Route A 2.75 Miles Route A Presidential SP Quarter mile markers are marked with orange circles at the locations designated
11.5 Volumes of Pyramids and Cones
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 13 Civil Engineering Detail Drawings.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Shepherd University WV Route 480 Pedestrian Underpass August 3, 2011.
Wisdom G4 Gravity Anomaly Note: NAD 83 CONUS not NAD27 W. USA
Phase 2: 30% Design Plans September 4 th, 2012.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
US & State Bike Route Designation Any Jurisdiction, Ohio.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
Wild Fire By: Jazzy J. Preparations For a Wild Fire Learn about the history of wildfire in your area Determine your community's ability to respond to.
Copyright©amberpasillas2010. Today we are going to find the Area of Parallelograms.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
1 Wallace Creek, USGS aerial view, about 1990 USGS Photo.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
No Parking Drop & Go Only - No Parking No Parking No Parking on Grass Median No Parking No Parking with 10 Feet of Fire Hydrant Brookside Elementary School:
City of Belmont Pavement Reconstruction Project October 15, 2014.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 (DB Phase 3) Terry Rd. to Gibbs Pond Rd. Design-Build Project PIN , Contract No. D
ROOFING BCGCA3007B. Types of Roofs Problem No1 Calculate Underside of Beams Birdsmouth 30mm Rafter 140 x 45.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Lesson 10: Off-Road Trails
3.01 Measuring the Earth Navigation Instructor 40 Minutes
Georgia underground marking standards
Evacuation Route Power Point
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Hybrid Power Solution for Road Lighting Application
DICKINSON AVENUE RECONSTRUCTION
INDOOR BASEBALL / SOFTBALL FACILITY
Longitudinal Joint Construction – Why Straightness Matters
Review Questions 3rd MD.5, 6, 7.
SW Gage Blvd - Street Repair Project
RUNWAY OBSTRUCTIONS.
Site Plan Requirements
1. Top Plane, New Sketch Sketch Circles 2. 50 & 1
This text is placed correctly within the 80% title safe zone
Which photo is the cross section?
FAMOUS PYTHAGOREAN TRIPLES:
Drawing of Sufficient Detail (DOSD)
Rack Placement Chopper Workshop
support a power pole that is 15 meters
Pole Position Student Points Time
A B C D.
Presentation transcript:

Reddington Rd Reddington Rd. T G Fire Hydrant # 198 Lateral Pole Sewer Cover Gas Meter 33’ 65’ 76’ 18’ CL of road CL of Road 53’ 86 ‘ Gas line is 5’ off Edge of Pavement 6’11’ Guard Rail Looks like an open cut but nothing around Mark on pavement “A” There are 2 high pressure sanitary sewers in the area but Tim did not know the locations There is a sewer cover in the SW quad of this drawing CL of Cherry Valley Rd 13’ 15’ 21’26’ Proposed new route measures approximately 205 feet 18’ 10’ 55’ 24’ The centerlines for Reddington Rd in both directions is offset by 27’. Shutoff 1

Reddington Rd. T G Fire Hydrant # 198 Sewer Cover Gas Meter CL of road CL of Road Gas line is 5’ off Edge of Pavement Guard Rail CL of Cherry Valley Rd Shutoff Path of new route goes from existing MH on East side of Cherry Valley Rd. Goes South to edge of road then follows path to new Lateral Pole START New Lateral pole Existing buried cable These cables are aerial This pole to be removed 2

Reddington Rd Reddington Rd. T G Fire Hydrant # 198 Sewer Cover Gas Meter CL of road CL of Road Gas line is 5’ off Edge of Pavement Guard Rail CL of Cherry Valley Rd Shutoff Centerline of Reddington Rd E and W are offset by 27 feet Width of all roads is 26 feet 3

Reddington Rd Reddington Rd. T G Fire Hydrant # 198 Sewer Cover Gas Meter CL of road CL of Road Gas line is 5’ off Edge of Pavement Guard Rail Looks like an open cut but nothing around Mark on pavement “A” There are 2 high pressure sanitary sewers in the area but Tim did not know the locations There is a sewer cover in the SW quad of this drawing CL of Cherry Valley Rd Shutoff 4

Reddington Rd Reddington Rd. T G Fire Hydrant # 198 Sewer Cover Gas Meter CL of road CL of Road Gas line is 5’ off Edge of Pavement Guard Rail Looks like an open cut but nothing around Mark on pavement “A” CL of Cherry Valley Rd Proposed new route measures approximately 205 feet Shutoff A 5

Reddington Rd. T G Sewer Cover Gas Meter CL of road CL of Road Guard Rail CL of Cherry Valley Rd START New Lateral pole This pole to be removed 6

Reddington Rd. T G Sewer Cover Gas Meter CL of road CL of Road Guard Rail CL of Cherry Valley Rd START New Lateral pole Bicycle Trail Underpasses 7