1 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. A Turning Point in Naval Ship Design 9 September 2010 CAPT C. P. Mercer.

Slides:



Advertisements
Similar presentations
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships PEO Ships Brief to NDIA 26 January 2005.
2015 Small Business Outreach and Industry Day
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Dean Cox Naval Undersea Warfare Center, Keyport Capability maturity model integration CMMI FOR Washington state university 16 September 2009.
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
Systems Engineering Management
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
The program work breakdown structure (WBS) establishes the essential
Commander, Naval Installation Command (CNIC) N9, Child Youth Programs (CYP) plans to design, install, and maintain Closed Circuit Television (CCTV) systems.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Server Virtualization: Navy Network Operations Centers
CLEANROOM SOFTWARE ENGINEERING.
NOVEMBER SHIPBUILDING AND SHIP PROCUREMENT FOR THE SPANISH NAVY BRIEFING FOR: SCHOOL OF POLICY STUDIES QUEEN'S UNIVERSITY BRIEFING FOR: SCHOOL OF.
CBM + Program Implementation
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
From Research Prototype to Production
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
Montgomery County, Maryland DTS CMMI Approach & Implementation Mike Knuppel 03/20/2006.
EMS User Group Conference – 2008 PHI EMS MIGRATION TO COMMON PLATFORM PROJECT Manley Higgins Project Manager System Operations Pepco Holdings Inc. September.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
Advance Planning Briefing for Industry 10 October 2008 Mr. Chuck Comaty.
Next Generation ISEA Roadmap
1 UWDO Overview – NUWC WAK – 12/14/01 Simulation Based Design (SBD) Vision The SBD VISION: Develop, manufacture, deploy, and operate weapons “in the computer”
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
Constellation Space Transportation Planning Office July 30, 2009.
Critical Design Review (CDR)
LOG 101 Curriculum Review 16 Oct 2009 Curriculum Review LOG 101 Acquisition Logistics Fundamentals Presented to the Life Cycle Logistics (LCL) Functional.
Contract Year 1 Review IMT Tilt Thompkins MOS - NCSA 15 May 2002.
Independent Expert Program Review (IEPR) February 2006.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
LOG 235 Performance Based Logistics On the Move: Fielding Expected June 03 Dr. Russell A. Vacante CDSC DAU Thursday 24 October /02 LOG 235.
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
1 ME Spring 2015 Systems Engineering, Part II Session 8 5 February 2015 Mr. Larry Hopp, CPL © Copyright 2013.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
Project Execution Methodology
Camera PDR/CD1 Planning 19 September 2008
Supportability Design Considerations
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
CAD/PAD Development Process
Milestone A to Milestone B Requirements Management Activities
Mission Readiness Assessment System (MRAS)
USAF CAD/PAD Program Overview
Lesson 6 Technology Maturation and Risk Reduction Exercise Team #
Materiel Development Decision (MDD) to Milestone A (MS A)
A B C Solution Analysis Technology Maturation & Risk Reduction
24 April 2018 Janice Bryant, Strategic Innovation Manager
TORFQ ACTIONS TO BE RELEASED
Product Support Considerations
O&S COST MANAGEMENT: O&S COST INFLUENCE ON PROGRAMS
Lockheed Martin Canada’s SMB Mentoring Program
Iowa College Aid Processing System (ICAPS)
Wireless Local Number Portability Timeline - Phase 2
West Essex Business Planning Process
SmartMeterTM Steering Committee Update – July 2012
Technology Evaluation (RATE)
Wireless Local Number Portability Timeline - Phase 2
Presentation transcript:

1 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. A Turning Point in Naval Ship Design 9 September 2010 CAPT C. P. Mercer Amphibious Warfare Program Office PMS377 Ship to Shore Connector (SSC)

2 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Amphibious Warfare Program Office Organization PROGRAM MANAGER CAPT Christopher Mercer, PMS377 DEPUTY PROGRAM MANAGER Tom Rivers, PMS377B AN/KSQ- 1/AADS & EPLRS PMS377 Test & Trials LHA Acquisition Logistics Business/Financial Management LHA Production SSC Acquisition PAPM – Dawn Doebel Amphib GFE LCAC/LCU

3 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Replacement for the LCAC Deploys in LPD, LSD, LHD Amphibious Well Deck Ships Transports weapon systems, equipment, cargo and personnel High speed (over 35 knots) High payload (74 Short Tons) Over the Horizon (25nm or greater) Over-the-beach operations Through NATO Sea State 3 (significant wave height of 4.1 ft) Operate independent of tides, water depth, underwater obstacles, ice, mud, or beach gradient SSC Program

4 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. 1990’s2000’s2010’s1980’s LCAC 91 Craft delivered ( ) 79 currently in operational inventory Designed for 20-year service life Capable of carrying a 60 TON (M60) payload at speeds over 35 knots Amphibious assault from 15 nautical miles offshore JEFF A / JEFF B Prototypes leading to LCAC JEFF B was selected as the LCAC baseline LCAC (SLEP) Rotating machinery refurbishment C4N Replacement Enhanced Engines & Deep Skirt +10 yrs Service Life 27 Craft Completed + 11 In-process R&D funded craft to be delivered FY18 Designed for 30 Year Service Life 74 TON (M1A1) payload & OTH assault from 25 nautical miles Increased reliability & availability Pilot/Co-pilot cockpit Procuring 73 craft over 8 year period SSC 1970’s Evolution of LCAC to SSC

5 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. SSC Program History Program Studies and Analysis began Oct Initial Capabilities Document (ICD) approved by JROC - Nov Concept Decision DAB Nov AoA Final Report signed by N85 & DASN Ships - Dec USN Resource, Requirements Review Board (R3B) (Gate 2) Mar SSC Design Site officially established - Apr DAB approved start of Preliminary Design (PD) - Apr – Sep Set-Based Design (SBD) - Nov NAVSEA Stakeholders Steering Board (SSB) #1 Approved Baseline Design and PD effort continued

6 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. SSC Program History (Cont.) Mar NAVSEA SSB #2 approved Functional Baseline Design - Mar NAVSEA Preliminary Design Review (PDR) to SEA 05 - Apr Milestone A DAB - May Contract Design (CD) begins - Sep – 0ct First Technical Data Package (TDP) TWH Reading Session - Dec Industry Day and Release of Draft Specifications and Drawing to industry Mar Final TDP Reading Sessions - May – Jun SSB/Critical Design Review (CDR) - Jul TDP Certified - Aug USN Resource, Requirements Review Board (R3B) (Gate 4/5)

7 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. SSC - Innovative Approach  Returned to Navy led design process  Design team distributed throughout US – NSWCCD, West Bethesda & Philadelphia – SPAWAR, Charleston & San Diego – NUWC, Keyport – NSWC, Dahlgren – NSWCPCD, Panama City – NRL – Contractor design expertise

8 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. SSC - Innovative Approach (Cont.)  First ship design implementation of Set-Based Design (SBD)  Government Design locks in major details – Increased payload and more severe environment – Improved maintainability and reliability – Optimized Total Ownership Costs (TOC)  Builder does what he knows best – Design for producibility – Reduce Acquisition Cost

9 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Subsystem Trade StudiesPD-1PD- 2 Review Point Design Output Trade Space Parameters Trade Space Parameters Point Design Output Design Space Brief Month Integration Period Apr 21Jun 21Aug 18May 1Feb 20 Functional Baseline Jan 5Sep 26 Set-Based & Preliminary Design Schedule Preliminary Design Phase Set-Based Design Nov 3 Proposed Baseline Review Dec 19 Holidays CD Prep Mar PDR

10 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Trade Space Formalization & Reduction High Value Options High Value Options Trade Space Definition.. Element Partitioning.. HSI Element- Specific Exclusions: Combination- Specific Exclusions: Dominated Combinations/ Options Infeasible Combinations Final Screen for Balancing Failed Configurations Balancing Craft Evaluation SSC Implementation of SBD High Value Configurations Recommended Design with Backups Recommended Design with Backups 11 “Key” Design Parameters/ 13K+ Configurations >125 Candidate “Key” Design Parameters Hull Machinery Auxiliaries C4N Performance (Skirt) Little craft level impact parameters/ options Dominated Options

11 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Trade Space Reduction Progress Formal Start of Reduction Efforts Start of Integration Balancing Checks Craft Scoring

12 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. SSC Contract Design 1 June ’10 Configuration Management Begins CD 1CD 2CD 3CD 4 CD Prep Design Freeze Establish Baseline Distribute Technical Data Package to TWH’s & Industry Incorporate Comments/ Establish Baseline Contract Data Package Delivery PDR 1 May ’091 Aug ’091 Nov ’091 Feb ’10 26 Mar ‘09 Evolving Baselines Evolving Baselines Evolving Baselines Evolving Baselines Final TWH Reading Session 1 Apr ’10 Technical Warrant Holder Approved Requirements & SDS Draft Design Team/ SEM/Program Office Reading Session & Draft Spec CDR/ DoDI 5000 PDR Final Certification of TDP SSB 0

13 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.  Length, Overall: 28.0 m (91.8 ft)  Beam, Overall: 14.5 m (47.8 ft)  Depth: 1.27m (50 inches)  Design Payload: 54.43MT  Flight Crew: 3  Length, Overall: Same as LCAC  Beam, Overall: Same as LCAC  Depth: 1.422m (56 inches)  Design Payload: MT  Flight Crew: 2 LCAC/SSC Comparison Changes driven by increased payload and improved reliability and maintainability

14 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Machinery Design Improvements 4-Blade Props 4 x 3955hp GTEs 4 x 63in dia Lift Fans 2 x 60 kVA APUs8 x Gearboxes 400 Hz Electrical Dist Split Plant 12 x Steel Shaft Segments LCACSSC 4 x Composite Shaft Segments 2 x Gearboxes2 x 85 kVA APUs 4 x 5300hp GTEs6-Blade Props 2 x 69in dia Lift Fans 60 Hz Electrical Dist Parallel Plant 2 x 150 kVA CSGs

15 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Addressed LCAC Top 25 RMA Drivers Electrical-Hydraulic Actuators AA 5083 & advanced internal coating system 60 Hz Electrical Distribution System Extensive use of composites LCAC Lessons Learned - Top 25 Maintenance Drivers - Prototypes Maintainability Demonstrations -- Material History / Metrics Database ICAS Utilize ICAS & CBM to Optimize Equipment Preventive Maintenance Periodicities Test Time  Reliability  Require Equipment & Craft-Level Reliability Growth Testing Advanced Fire Fighting – no HALON

16 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Addressed LCAC Top 25 RMA Drivers Gear Driven Bow Thrusters Simplified Window Arrangement – fewer unique parts Improved HVACImproved HF Antennas – improved comms reliability Gearbox Driven Generators Simpler & More Efficient Drive Train

17 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. R&M Implementation Requirements R&M Program Related Requirements: - Reliability (12 hr mission) - Operational Availability (Ao) - Materiel Availability (A M ) - Mean Time To Repair - Maximum Time To Repair Values = Machinery Equipment = Auxiliary Equipment = C4N Equipment - C4N Software False Alarm Rate - Specified Removal Methodologies = Main Engine and Gearbox Design Influence Design Influence - Implement Comprehensive R&M Program - Develop and apply maintainability design criteria (Gov’t approved) - Perform R&M Allocations / Modeling / Predictions / Analyses - Include quantitative R&M requirements Validation R&M Validation Testing - Reliability Growth Testing and Failure Reporting Program (FRACAS) - Maintainability Demonstrations (M- Demos) required on six major equipment groupings

18 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Way Ahead  Award Detail Design & Construction (DD&C) contract  Maintain requirements throughout DD&C  NAVSEA involvement in design risk items  SUPSHIP oversight of construction  Test to ensure craft meets requirements SSC design process is attractive for future Naval ship designs