Lecture 23: Primary System Loops and Components Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract.

Slides:



Advertisements
Similar presentations
CONTROLS OF SUPER CRITICAL BOILERS
Advertisements

Operational Ideas for Supercritical Systems The Ultimate Criteria for Appreciation ….. P M V Subbarao Professor Mechanical Engineering Department I I.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Lecture 19: HVAC Outside Air Systems and Modeling Guidelines Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under.
Lecture 10: Zone and Modeling Controls, Simple HVAC for Load Calculations Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Objectives Finish with ducts and fans Define project topics.
Lecture 22: Primary System Loops in EnergyPlus
Energy Efficient Fluid Flow
Lecture 7: Building Modeling Questions Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract to the National.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Lecture 18: Template Systems and Autosizing Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract to.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Lecture 17: VAV and Terminal Reheat Systems Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract to.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Lecture 15: Air Primary Loops and Controls Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract to the.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Lecture Objectives: Final discussion about HW3 Introduce more final project topics Continue with HVAC Systems.
Lecture 1: An Overview of Simulation and EnergyPlus Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract.
Lecture 16: Zone Air Paths and Air Distribution Units
Water piping design.
Heat Exchanger & Classification Prepared by: Nimesh Gajjar
Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.
Objectives -Introduce HW5 – Plumbing -Learn about district cooling and heating systems.
Air conditioning – Refreshes your life EWTP MBY Applied Systems Sales1 EWTP-MBYNN Air-cooled Heat Recovery.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Lecture Objectives: Finish with thermal storage systems Learn about plumbing systems.
Variable-Speed Heat Pump Model for a Wide Range of Cooling Conditions and Loads Tea Zakula Nick Gayeski Leon Glicksman Peter Armstrong.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Lecture Objectives: Summarize sorption chillers Learn about Chiller modeling Cooling towers and modeling.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Objectives - Finish with pumps and plumbing example - Learn about district cooling and heating systems.
Variable Capacity Heat Pump RTF Sub-Committee
Lecture Objectives: Learn about Chiller modeling
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Lecture Objectives: Finish with absorption cooling Power generation Rankine cycles Connect power generation with heating and cooling –CHP –CCHP.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Energy Cost Budget Highlights Jason Glazer, PE GARD Analytics Arlington Heights, Illinois Energy Cost.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
1 Hospital Building and Campus Piping. 2 Hospital Building Occupancy – office and patient areas Patient areas: 24 hours per day Office areas: 8 am – 5.
Lecture Objectives: Cooling towers and modeling Project 1 Thermal storage systems.
Lecture Objectives: Answer question related to Project 1 Finish with thermal storage systems Learn about plumbing systems.
Thermal Energy Storage Thermal energy storage (TES) systems heat or cool a storage medium and then use that hot or cold medium for heat transfer at a later.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Lecture Objectives: Differences in Conduction Calculation in Various Energy Simulation Programs Modeling of HVAC Systems.
Lecture Objectives: Plumbing Pumps Hydronic distribution systems
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
Aleph Networks Co. Inefficient Operation Recognized by Commissioning and Case Example of Countermeasures Ritsumeikan Uji HighSchool.
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Learn about thermal storage systems

ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Lecture Objectives: Discuss Final Project
Types of HVAC Technology Used in Business Establishments
Lecture Objectives: Discuss Project 1 assignment
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Continue with cooling towers
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Energy Efficiency in District Coiling System
Chilled Beam Performance:
Loop Water Controller Overview
Frenger “Radiant” chilled beam performance at 1 Shelly St - Sydney
Lecture Objectives: Discuss HW4 Chiller modeling
Lecture Objectives: Discuss HW4 parts
Lecture Objectives: Discuss Projects 1 and 2
When: Monday 26, 4 pm Where: ECJ Building, Classroom 3.402
Announcements Exam 1 Next Class (Thursday, March 14th):
Presentation transcript:

Lecture 23: Primary System Loops and Components Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract to the National Renewable Energy Laboratory. All material Copyright U.S.D.O.E. - All rights reserved

2 Purpose of this Lecture  Gain an understanding of: EnergyPlus loop controls Some of the many EnergyPlus plant and condenser components

3 Keywords Categories Covered in this Lecture  Plant Loop and Condenser Loop  Plant Operation Schemes, Cooling/Heating Load Range Based Operation, Load Range Equipment List  Coil  Pump  Boiler  Chiller  Cooling Tower  Curve

4 Plant Loop  IDD Description: PLANT LOOP, A1, \field Plant Loop Name A2, \field Fluid Type (Water) A3, \field Plant Operation Scheme List Name A4, \field Loop Temperature Setpoint Schedule Name N1, \field Maximum Loop Temperature in C N2, \field Minimum Loop Temperature in C N3, \field Maximum Loop Volumetric Flow Rate in m3/s N4, \field Minimum Loop Volumetric Flow Rate in m3/s N5, \field volume of the plant loop in m3 A5, \field Plant Side Inlet Node Name A6, \field Plant Side Outlet Node Name A7, \field Plant Side Branch List Name A8, \field Plant Side Connector List Name A9, \field Demand Side Inlet Node Name A10, \field Demand Side Outlet Nodes Name A11, \field Demand Side Branch List Name A12, \field Demand Side Connector List Name A13; \field Load Distribution Scheme (Optimal|Sequential) Control information Flow and temperature limits for both sides of the loop Supply side nodes, branches, and connections Demand side nodes, branches, and connections Control information

5 Plant Loop Limits  Provides upper and lower boundaries for temperature and flow rate  Pump will operate within this range of flows (pump controls actual flow rate)  Loop will not be allowed to vary temperature beyond temperature limits

6 Plant Loop Controls: Temperature  Setpoint temperature for plant loop can be scheduled  Plant loop will run equipment as needed and as defined by the remaining controls to meet setpoint temperature  If not enough equipment capacity, loop setpoint temperature may not be met (can “catch-up” in future time steps)  Pump controls will determine loop flow rate

7 Plant Loop Controls: Load Distribution  Sequential Sequential simply operates equipment in a serial manner based on the loop operation scheme (which assigns priority to different equipment on the loop) When highest priority equipment is out of capacity, next highest priority equipment tries to meet the load, etc.  Optimal Parallel operation of equipment Tries to find an “optimal” balance of the plant loop load between equipment based on the operating characteristics of the equipment on the loop Not a strict optimization, simply an approximation at what might be the best load distribution from an energy perspective

8 Plant Loop Controls: Operation Scheme  List of load ranges that define which equipment might try to meet a load  Requires following input: Plant Operation Schemes—a list of load range definitions and the schedules for when they are in effect Cooling/Heating Load Range Based Operation—a list of load ranges and the lists of equipment that are operating for those ranges Load Range Equipment List—the equipment lists referenced by the load ranges

9 Plant Loop Controls: Operation Scheme Example PLANT OPERATION SCHEMES, CW Loop Operation, !- Plant Operation Scheme Name LOAD RANGE BASED OPERATION, !- KEY--Control Scheme 1 Peak Operation, !- Control Scheme Name 1 On Peak, !- Control Scheme Schedule 1 LOAD RANGE BASED OPERATION, !- KEY--Control Scheme 2 Off Peak Operation, !- Control Scheme Name 2 Off Peak; !- Control Scheme Schedule 2 COOLING LOAD RANGE BASED OPERATION, Peak Operation, !- Name 0, !- Load Range Lower Limit 1 {W} 70000, !- Load Range Upper Limit 1 {W} Chiller Plant, !- Priority Control Equip List Name , !- Load Range Lower Limit 2 {W} , !- Load Range Upper Limit 2 {W} Chiller Plant and Purchased, !- Priority Control Equip List Name , !- Load Range Lower Limit 3 {W} , !- Load Range Upper Limit 3 {W} Purchased Only; !- Priority Control Equip List Name 3 COOLING LOAD RANGE BASED OPERATION, Off Peak Operation, !- Name 0, !- Load Range Lower Limit 1 {W} , !- Load Range Upper Limit 1 {W} All Chillers; !- Priority Control Equip List Name 1 Referenced in Plant Loop input

10 Plant Loop Controls: Operation Scheme Example LOAD RANGE EQUIPMENT LIST, Chiller Plant, !- Equip List Name CHILLER:CONST COP, !- KEY--Plant Equip 1 Type Little Chiller; !- Equip Name 1 LOAD RANGE EQUIPMENT LIST, Chiller Plant and Purchased, !- Equip List Name CHILLER:ELECTRIC, !- KEY--Plant Equip 1 Type Big Chiller, !- Equip Name 1 Purchased:Chilled Water, !- KEY--Plant Equip 2 Type Purchased Cooling; !- Equip Name 2 LOAD RANGE EQUIPMENT LIST, Purchased Only, !- Equip List Name Purchased:Chilled Water, !- KEY--Plant Equip 1 Type Purchased Cooling; !- Equip Name 1 LOAD RANGE EQUIPMENT LIST, All Chillers, !- Equip List Name CHILLER:ELECTRIC, !- KEY--Plant Equip 1 Type Big Chiller, !- Equip Name 1 CHILLER:CONST COP, !- KEY--Plant Equip 2 Type Little Chiller; !- Equip Name 2 Load Range Equipment Lists referenced on previous slide

11 Example: Plant Loop PLANT LOOP, Chilled Water Loop, !- Plant Loop Name Water, !- Fluid Type CW Loop Operation, !- Plant Operation Scheme List Name CW Loop Temp Schedule, !- Loop Temperature Setpoint Schedule Name 98, !- Maximum Loop Temperature {C} 1, !- Minimum Loop Temperature {C} , !- Maximum Loop Volumetric Flow Rate {m3/s} 0, !- Minimum Loop Volumetric Flow Rate {m3/s} autosize, !- volume of the plant loop {m3} CW Supply Inlet Node, !- Plant Side Inlet Node Name CW Supply Outlet Node, !- Plant Side Outlet Node Name Cooling Supply Side Branches, !- Plant Side Branch List Name Cooling Supply Side Connectors, !- Plant Side Connector List Name CW Demand Inlet Node, !- Demand Side Inlet Node Name CW Demand Outlet Node, !- Demand Side Outlet Nodes Name Cooling Demand Side Branches, !- Demand Side Branch List Name Cooling Demand Side Connectors, !- Demand Side Connector List Name Optimal; !- Load Distribution Scheme

12 Coils  COIL:Water:SimpleCooling  COIL:Water:SimpleHeating  COIL:Electric:Heating  COIL:Gas:Heating  COIL:Water:DetailedFlatCooling  COIL:DX:Cooling Bypass Factor-Empirical Includes the condensing unit  COIL:DX:Heating-Empirical

13 Coil - Example Supply Fan ZONE1 Reheat Coil Zone 1 Zone 1 Reheat Air Outlet Node Zone 1 Reheat Air Inlet Node Zone 1 Reheat Water Inlet Node Zone 1 Reheat Water Outlet Node

14 Coil – Example (cont’d) COIL:Water:SimpleHeating, Reheat Coil Zone 1, !Name of coil FanAndCoilAvailSched, !Coil Schedule 400.0, !UA of the Coil 1.3, !Max Water Flow Rate of Coil kg/sec Zone 1 Reheat Water Inlet Node, Zone 1 Reheat Water Outlet Node, !Coil Water Side Inlet & Outlet Node Zone 1 Reheat Air Inlet Node, Zone 1 Reheat Air Outlet Node; !Coil Air Side Inlet & Outlet Node

15 Pump – Example CW Supply Inlet Node CW Pump Outlet Node Circ Pump Chiller 1Chiller 2 Cond. Demand Side Loop Plant Supply Side Cooling Loop Plant Demand Side Cooling Loop

16 Pump – Example (cont’d)  PUMP:CONSTANT SPEED  PUMP:VARIABLE SPEED PUMP:VARIABLE SPEED, CW Circ Pump, !- Pump Name CW Supply Inlet Node, !- Inlet_Node CW Pump Outlet Node, !- Outlet_Node.0013, !- Rated Volumetric Flow Rate {m3/s} , !- Rated Pump Head {Pa} 560, !- Rated Power Consumption {W}.87, !- Motor Efficiency 0.0, !- Fraction of Motor Inefficiencies to Fluid Stream 0, !- Coefficient1 of the Part Load Performance Curve 1, !- Coefficient2 of the Part Load Performance Curve 0, !- Coefficient3 of the Part Load Performance Curve 0, !- Coefficient4 of the Part Load Performance Curve 0, !- Min Flow Rate in variable flow capacity;{m3/s} INTERMITTENT; !- Pump Control Type

17 Boilers  BOILER:SIMPLE  WATERHEATER:SIMPLE Storage tank Heat recovery  PURCHASED:HOT WATER

18 Boiler - Example Boiler Inlet Node Boiler Outlet Node Plant Supply Side Heating Loop Plant Demand Side Heating Loop ± HW Pump Heating Coil

19 Boiler – Example (cont’d) BOILER:SIMPLE, Boiler Plant Boiler,! Boiler Name GAS, ! Fuel Type 25000, ! Nominal Capacity {W} 0.8, ! Theoretical Boiler Efficiency 100, ! Design Boiler Water Outlet Temp {C} , ! Max Design Boiler Water Flow Rate {m3/s} 0.10, ! Minimum Part Load Ratio 1.00, ! Maximum Part Load Ratio 1.00, ! Opt Part Load Ratio 1.0, ! Coefficient1 of the fuel use/part load ratio curve 0.0, ! Coefficient2 of the fuel use/part load ratio curve 0.0, ! Coefficient3 of the fuel use/part load ratio curve Boiler Inlet Node, ! Boiler_Water_Inlet_Node Boiler Outlet Node, ! Boiler_Water_Outlet_Node 100, ! Temp Upper Limit Water Outlet {C} ConstantFlow; ! Boiler Flow Mode (v1.0.1)

20 Chillers  CHILLER:ELECTRIC  CHILLER:GAS TURBINE  CHILLER:ABSORPTION  CHILLER:GAS ABSORPTION Direct-Fired Gas Absorption Chiller-Heater  CHILLER:CONST COP  CHILLER:ENGINEDRIVEN  PURCHASED:CHILLED WATER

21 Chiller – Example Chiller Chiller Inlet Node Chiller Outlet Node Chiller Condenser Inlet Node Chiller Condenser Outlet Node Condenser Demand Side Loop Plant Supply Side Cooling Loop CW Pump Plant Demand Side Cooling Loop

22 Chiller – Example (cont’d) CHILLER:ELECTRIC, Big Chiller, !- Chiller Name WATER COOLED, !- Condenser Type , !- Nominal Capacity {W} 2.75, !- COP Big Chiller Inlet Node, !- Plant_Side_Inlet_Node Big Chiller Outlet Node, !- Plant_Side_Outlet_Node Big Chiller Condenser Inlet Node, !- Condenser_Side_Inlet_Node Big Chiller Condenser Outlet Node, !- Condenser_Side_Outlet_Node.15, !- Minimum Part Load Ratio 1.0, !- Maximum Part Load Ratio.65, !- Opt Part Load Ratio 35.0, !- Temp Design Condenser Inlet {C} 2.778, !- Temp Rise Coefficient 6.67, !- Temp Design Evaporator Outlet {C} , !- Design Evaporator Vol Water Flow Rate {m3/s} (v1.0.1) , !- Design Condenser Volumetric Water Flow Rate

23 Chiller – Example (cont’d) , !- Coefficient1 of the capacity ratio curve , !- Coefficient2 of the capacity ratio curve , !- Coefficient3 of the capacity ratio curve 2.333, !- Coefficient1 of the power ratio curve , !- Coefficient2 of the power ratio curve , !- Coefficient3 of the power ratio curve , !- Coefficient1 of the full load ratio curve , !- Coefficient2 of the full load ratio curve , !- Coefficient3 of the full load ratio curve 5; !- Temp Lower Limit Evaporator Outlet {C} ConstantFlow; !- Chiller Flow Mode (v1.0.1)

24 Cooling Tower – Example Condenser Tower Inlet Node Condenser Tower Outlet Node Tower Cond Demand Side Loop Plant Supply Side Cooling Loop

25 Cooling Tower – Example (cont’d)  COOLING TOWER:TWO SPEED  COOLING TOWER:SINGLE SPEED 2 Input Methods  UA and Design Water Flow Rate COOLING TOWER:SINGLE SPEED, Big Tower1, !- Tower Name Condenser Tower 1 Inlet Node, !- Water Inlet Node Name Condenser Tower 1 Outlet Node, !- Water Outlet Node Name.0011, !- Design Water Flow Rate {m3/s} 8.0, !- Design Air Flow Rate {m3/s} 500, !- Fan Power at Design Air Flow Rate {W} 175.0, !- Tower UA Value at Design Air Flow Rate {W/K} 0.0, !- Air Flow Rate in Free Convection Regime {m3/s} 0.0, !- Tower UA Value at Free Convection Air Flow Rate {W/K} UA and Design Water Flow Rate; !- Tower Performance Input Method

26 Cooling Tower – Example (cont’d) 2 Input Methods (Cont.)  Nominal Capacity COOLING TOWER:SINGLE SPEED, Big Tower1, !- Tower Name Condenser Tower 1 Inlet Node, !- Water Inlet Node Name Condenser Tower 1 Outlet Node, !- Water Outlet Node Name, !- Design Water Flow Rate {m3/s} autosize, !- Design Air Flow Rate {m3/s} 500, !- Fan Power at Design Air Flow Rate {W}, !- Tower UA Value at Design Air Flow Rate {W/K} 0.0, !- Air Flow Rate in Free Convection Regime {m3/s} 0.0, !- Tower UA Value at Free Convection Air Flow Rate {W/K} Nominal Capacity, !- Tower Performance Input Method , !- Tower Nominal Capacity {W} 0.; !- Tower Free Convection Capacity {W}

27 Curve Objects  CURVE:CUBIC  CURVE:QUADRATIC  CURVE:BIQUADRATIC CURVE:BIQUADRATIC, Sample Curve, !- Name 1.000, !- Coeff1 Constant 0.100, !- Coeff2 x 0.001, !- Coeff3 x** , !- Coeff4 y 0.002, !- Coeff5 y** , !- Coeff6 x*y 0, !- minimum value of x 100, !- maximum value of x 0, !- minimum value of y 100; !- maximum value of y

28 Summary  Each component on the primary system loops has specific input requirements that are unique to that component type  Some components may link between two different loops, for example: Coils—air/zone equipment loop and plant demand side Chiller—plant supply side and condenser demand side  Primary loops have temperature, flow, and operational controls that must be defined by the program user