US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers Budgeting Process
Advertisements

Bill Dawson Chief, Policy and Policy Compliance U.S. Army Corps of Engineers Bill Dawson Chief, Policy and Policy Compliance U.S. Army Corps of Engineers.
Joint Contingency Contracting
F1B - 1 BU ILDING STRONG SM Flood Risk Management Module F1: Authorities and Policies.
FDR1 - 1 Flood Risk management History/Mission/Policies.
US Army Corps of Engineers BUILDING STRONG ® COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers United States Army.
Hurricane Katrina Lessons Learned Laurence I. Broun Departmental Emergency Coordinator Office of Law Enforcement, Security and Emergency Management May.
Corps of Engineers BUILDING STRONG ® Dam Safety Modification Studies Robert Taylor, P.E. Dam Safety Program Manager Great Lakes and Ohio River Division.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
Flood Risk Management Program Ed Hecker, Chief, Office of Homeland Security National Levee Summit February 2008 St Louis, MO.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
U. S. Army Corps of Engineers Philadelphia District How to start the Corps’ Project Delivery Engine Local Sponsor Identifies A Problem and Requests Corps.
Engineer Circular Requests to Alter USACE Projects
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers SAME DC Post Briefing SAME DC Post Briefing Mohan Singh, P.E. 25 March 2010.
Federal Funding Process LYNDA HOFFMAN, WATERWAYS DIVISION MANAGER.
Module 12 STEPS 6 & 7 Negotiation of PMP/FCSA and Execution of Feasibility Cost Sharing Agreement Civil Works Orientation Course - FY 11.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration Review Processes Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration.
Module 10 Step 3 Initial Study Funding (incl. Civil Works Budget Process) Civil Works Orientation Course - FY 11.
USACE South Atlantic Division (SAD) Central & South America
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
COL Mark UNCLASSIFIED 13 August 2013 US Army Environmental Command SAME Presentation 20.
Module 24 STEPS 17, 18, & 19 Project Implementation Civil Works Orientation Course - FY 11.
THE FEDERAL BUREACRACY Examining the “Fourth Branch.
Module 27 Continuing Authorities Program Module 27 Continuing Authorities Program Civil Works Orientation Course - FY 11.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
USACE Civil Works Program Development, Defense & Execution Gary Loew, Chief, Programs Integration Division Directorate of Civil Works U.S. Army Corps of.
WRRDA and WRDA: How are they different, and does it make any difference? Inland Rivers, Ports and Terminals, Inc. Tuesday, April 29, 2014 James A. Kearns.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Watershed Authorities, Policies and Procedures Michael Greer Regional Technical.
1 A CASE STUDY: Organization and Workforce for Operations at Maryland State Highway Administration Glenn McLaughlin, Deputy Director Office of CHART and.
James H. Butler, Acting Director NOAA Strategic Planning Moving NOAA into the 21 st Century Third GOES-R User Conference May 2004, Boulder, Colorado.
STRENGTHENING HISTORICALLY BLACK COLLEGES AND UNIVERSITIES (HBCU) PROGRAM.
1 Planning Associates 2 March 2011 Jan Rasgus Senior Policy Advisor Policy and Policy Compliance Division Legislative / Authorization Process.
BUILDING STRONG ® Fort Worth District Carolyn Staten USACE-SWF-Fort Worth, Texas Deputy Office of Small Business Programs 5 th Annual Business Conference.
US Army Corps of Engineers BUILDING STRONG ® PLANNING GUIDANCE Planning Principles & Procedures – FY11.
President’s Office of Science and Technology Policy Deborah D. Stine Specialist in Science and Technology Policy December 3, 2008.
U.S. Army Corps of Engineers USACE Navigation Data/Information Workshop July 7, 2005 Arlene L Dietz, Director, Navigation Data Center.
Winter Leader Conference February 4, 2009 “ Building Strong “1 Budgets and Appropriations: Restoring our Infrastructure Budgets and Appropriations: Restoring.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
US Army Corps of Engineers ® Southwestern Division Pacesetters – Army Strong – Engineer Ready! The U.S. Army Corps of Engineers and its Southwestern Division.
National Levee Safety Act, Title IX, WRDA 2007 Update for Levee Summit Eric Halpin, P.E. Special Assistant for Dam and Levee Safety Headquarters, US Army.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
US Army Corps of Engineers BUILDING STRONG ® Planning Products & Milestones Planning Principles & Procedures – FY11.
US Army Corps of Engineers Chicago District FY04tpr\skbcongressional Civil Works Program Missions Missions Process Process Select Authorities Select Authorities.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
Winter Leader Conference February 4, 2009 “ Building Strong “1 Budgets and Appropriations: Restoring our Infrastructure Budgets and Appropriations: Restoring.
Request to Alter USACE Projects
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Saving America’s Everglades Project Delivery Team Workshop.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® SMART PLANNING TO SUPPORT FLOOD RISK MANAGEMENT USACE Flood Risk Management and Silver Jackets.
Office of Wildland Fire Coordination Secretary—DOI Assistant Secretary- Policy, Management, and Budget Deputy Assistant Secretary Law Enforcement, Security,
US Army Corps of Engineers BUILDING STRONG ® OVERVIEW OF THE CIVIL WORKS PROCESS Planning Principles & Procedures – FY 11.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
US Army Corps of Engineers BUILDING STRONG ® BUILDING STRONG SM The Louisville Engineer District CORPS 101 Brandon R. Brummett, P.E., PMP Outreach Coordinator.
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
US Army Corps of Engineers BUILDING STRONG ® Step 6: Selection Of The Recommended Plan Planning Principles & Procedures – FY11.
1 Federal Emergency Management Agency Charlie Hoffman Disaster Operations Directorate Chief, DEC Programs Disaster Emergency Communications National Public.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® PCoP Webinar Series Section 7001: Preparing the 2017 Annual Report to Congress on Future Water.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
BUILDING STRONG ® 1 US Army Corps of Engineers BUILDING STRONG ® Transforming the Army Civil Works Program Theodore A. “Tab” Brown, P.E. Chief, Planning.
Mahoning County Informational Meeting USACE Programs, Authorities, and Ohio Silver Jackets Program Presented by: Ashley Stephens 16 August 2016.
U.S. Army Corps of Engineers Directorate of Contracting
Army Engineer Association Engineering & Energy Track 16 June 2015
Partnering with U.S. Army Corps of Engineers
PRIP 101 Revolving Fund and the Plant Replacement and Improvement Program (PRIP) ER Nov-18.
Navigation Funding for CMANC
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11

BUILDING STRONG ® USACE Vertical Project Delivery Team (PDT) Assistant Secretary of the Army (Civil Works) Headquarters Division District ASA(CW) Sponsor

BUILDING STRONG ®

District Responsibilities DISTRICT  Develop technically sound CW products and projects consistent with law and policy; on schedule; within budget.

BUILDING STRONG ® District Horizontal PDT Elements Engineering Planning Construction Real Estate & Counsel The Team Operations & Maintenance Programs & Project Management

BUILDING STRONG ® Division Responsibilities DIVISION (MSC)  Assure quality of District products.  Manage regional CW program; prioritize resources; the “Business Center”.  CAP Program Management

BUILDING STRONG ® Division Structure 8 - Regional Division Offices Executive Office - Division Commander Programs Directorate (SES) Planning & Policy Business Management Directorate (SES) Support Offices [SES = Senior Executive Service]

BUILDING STRONG ® Headquarters (HQ USACE) Responsibilities  Development and publication of policy and guidance for planning, programs management, operations, engineering, and other CW functions  Washington-level review and processing of decision documents  Development and defense of annual budget request; bi-annual WRDA legislation  Fiscal management  National oversight of Dam Safety, Regulatory, Emergency Management and other programs  Coordination with ASA(CW), OMB & Congress  Full-service, one-stop support to MSC’s

BUILDING STRONG ® HQ USACE Organization – Regional Integration Teams  Point of Contact for all CW and Military Actions  SES Team Leader; CW & MIL Deputy  Core members represent all CW and MIL functional organizations ► CW: Planning, Operations, Programs, Engr/Construction ► MIL: Environmental; Programs, Installation Support; Interagency/International  Matrixed members represent support functional organizations: Off. Water Project Review; Counsel; Real estate; Corp. Info.; Corp Integration; Logistics; Public Affairs; Contracting; Safety

BUILDING STRONG ® HQ USACE Civil Works Organization Chart Current version will be distributed in class

BUILDING STRONG ® HQ USACE Civil Works Functional Organizations  Program Integration Division  Planning & Policy Compliance Division ► Office of Water Project Review  Operations & Regulatory Division  Homeland Security Office  Institute for Water Resources

BUILDING STRONG ® Community of Practice Functions To Develop and Maintain: ► Policy and doctrine ► Capable workforce ► National, international and interagency relations and coalitions ► Organizational communications ► Learning organization

BUILDING STRONG ® ASA(CW) Responsibilities  Establish the Army position on all USACE policy, programmatic, legislative, budgetary, and organizational matters.  Review and approval of all legislative and budgetary initiatives for USACE CW activities.  Serves as point of contact for coordination with DoD, OMB, other Federal agencies, and committees of Congress.

BUILDING STRONG ® Sponsor’s Roles & Responsibilities  Communication – needs, preferences, constraints  Decision-making – go / no go  Cost sharing ► Feasibility – 50% (cash or in-kind) ► PED – 25% cash ► Construction - % varies, credit for LERRD’s  OMRR&R – forever  PDT Member

BUILDING STRONG ® Non-Federal Cost Sharing PROJECT PURPOSECOST SHARING (PERCENT) Navigation20 %; depth 20'  Harbors (includes 35 %; 20' < depth  45' 10% repayment)60 %; depth > 45'  Inland50 % (IWTF) Flood Control  Structural35 %  [5% cash + LERR]  50%  Nonstructural35 % Hurricane & Storm Damage Reduction35 % Ecosystem Restoration35 % Sec.1135 & %

BUILDING STRONG ® Non-Federal Cost Sharing (cont’d) PROJECT PURPOSECOST SHARING (PERCENT) Hydroelectric Power100 % Water Supply  Municipal & Industrial100 %  Agricultural 35 % Recreation  Navigation 50 %  Other 50 % of Separable Costs Aquatic Plant Control 50 %

BUILDING STRONG ® USACE Vertical Project Delivery Team (PDT) Assistant Secretary of the Army (Civil Works) Headquarters Division District ASA(CW) Sponsor