Department of Energy Office of Science HEP FY08 Budget Status and Issues Robin Staffin preCRB Discussion April 4 2006.

Slides:



Advertisements
Similar presentations
DOE Office of Science Budget Overview
Advertisements

NSF Experience with Management of Research Infrastructure
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
U.S. Department of Energy Office of Science Advanced Scientific Computing Research Program NERSC Users Group Meeting Department of Energy Update June 12,
FES International Collaboration Program: Vision and Budget Steve Eckstrand International Program Manager Office of Fusion Energy Sciences U.S. Department.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Office of High Energy Physics Report to the AAAC Kathleen Turner Office of High Energy Physics (HEP) Office of Science (SC), U.S. Department of Energy.
DOE Neutrino Program Plans
1 AAAS Meeting: February 2008  Particle Physics and the Responsible Use of Public Resources.
Department of Energy Office of Science Report from DOE Office of High Energy Physics Report from DOE Office of High Energy Physics Dr. Robin Staffin Associate.
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
Office of Science U.S. Department of Energy SLAC Users Organization Meeting July 6, 2004 Dr. Robin Staffin, Associate Director Office of High Energy Physics.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Under Secretary for Science U.S. Department.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
3/6/2006FY07/08 DOE Budget Briefing1 FY07/08 Budget Briefing Jonathan Dorfan Director Persis Drell Deputy Director SLAC.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
Progress in Confinement & Heating Increasing laser energy nn Confinement Parameter & Temperature.
Department of Energy Office of Science 1 DOE Office of High Energy Physics Fermilab User’s Meeting Dennis Kovar Acting Associate Director of the Office.
Long Range Planning Pier Oddone September 24, 2007.
Planning for Discoveries in Particle Physics Michael Witherell EPP2010 May 16, 2005.
Department of Energy Office of Science High Energy Physics Briefing to the Astronomy and Astrophysics Advisory Committee Dr. Robin Staffin Associate Director,
US ILC Review by DOE/NSF Apr. 4-6 at Fermilab Consultant reviewers: Ilan Ben-Zvi (BNL/ATF &RHIC) Dixon Bogert (FNAL/NUMI) Isidoro Campisi (ORNL/SNS) Tom.
Muon Ionization Cooling Experiment: U.S. Muon Accelerator Program Perspective and Approach Mark Palmer May 7, 2013.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
Physics Priorities S. Dawson July 11, 2007 Fermilab Steering Committee Meeting.
Remarks at the 2005 International Linear Collider Workshop Dr. Robin Staffin Associate Director DOE Office of High Energy Physics August 23, 2005.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
Office of Science U.S. Department of Energy FY07 OMB Briefing Draft v1.0.
U.S. Department of Energy Office of Science U.S. Department of Energy Office of Science High Energy Physics Advisory Panel Meeting FY 2009 Budget Request.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
1 Large Synoptic Survey Telescope Status Update for AAAC October 13, 2011 Nigel Sharp Division of Astronomical Sciences, NSF Kathy Turner Office of High.
Proton Plan PMG 2/22/06 E Prebys 1 Some Disclaimers I’ll be 100% honest These are my personal opinions  Pretty much in line with conversations I’ve had.
All Hands Meeting FY 2008 Budget Pier Oddone Fermilab December 20, 2007.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
11 DOE Office of Science High Energy Physics Program AAAC Meeting October 15, 2009 National Science Foundation Dennis Kovar Associate Director of the Office.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
Summary Comments and Discussion Pier Oddone 40 th Anniversary Users’ Meeting June 8, 2007.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
FY’06 Budget Implications for Fermilab and MINER A From presentations by Steve Holmes and Mike Witherell.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
Budget Outlook Glen Crawford P5 Meeting Sep
P5 Report: The Particle Physics Roadmap 1 A. Seiden Fermilab May 14, 2007.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Office of Science January 28, 2008J.Blazey / SiD Workshop / SLAC1 The View from DOE Moving ForwardMoving Forward HEPAPHEPAP FY08 “in review”FY08 “in review”
Perspective on the Future of HEP By Jonathan Dorfan, SLAC Director Snowmass 2001 Sunday, July 1, 2001.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
The categories for ILC budget planning are: R&D – work done in laboratories to develop and verify subsystem components. This supports the cost reduction.
SLAC All Hands Briefing: FY2008 Budget Persis S. Drell SLAC Director 1/7/08.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
DETECTOR RESEARCH AND DEVELOPMENT Fred Borcherding 1.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Revealing the Hidden Nature of Space and Time Charting the Course for Elementary Particle Physics (in the U.S.) Committee on Elementary Particle Physics.
CPAD Instrumentation Frontier Meeting October 5-7, 2015 Glen Crawford, Helmut Marsiske Office of Science, U.S. Department of Energy DOE Office of High.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Large Synoptic Survey Telescope
Introduction to ASTeC Programmes
Yet Another Report from DOE Office of High Energy Physics
Presentation transcript:

Department of Energy Office of Science HEP FY08 Budget Status and Issues Robin Staffin preCRB Discussion April

Department of Energy Office of Science HEP Priorities FY08 and beyond Support current world-leading U.S. user facilities: –Tevatron Collider through 2009, and NuMI/MINOS through 2010 –Sustain B-factory to run as long as scientifically competitive, but no later than 2008 Develop new facilities in targeted areas that will establish a U.S. leadership role in these areas in the coming decade: –Enable U.S. researchers to take leading roles in LHC physics –Support the Joint Dark Energy Mission with NASA and explore options for ground-based dark energy experiments with NSF –Invest in neutrino initiatives to address outstanding questions: EvA/NOvA and reactor neutrino experiments –Invigorate R&D for International Linear Collider Restore core research and long-term R&D activities

Department of Energy Office of Science HEP Highest Priority : ILC The proposed International Linear Collider (ILC) is HEP’s highest priority. The Department has expressed its interest in siting the ILC at Fermilab, should it be built and the United States be chosen as the host country. The out-year budget profile includes support for technology R&D activities aimed at technical design goals while reducing project risk and cost –R&D profile is much improved vs. FY07 but still lags behind Europe –Will support an international decision-making process near the end of this decade. A future decision to proceed with construction rests on two conditions: –the ILC is deemed a priority and affordable by its international partners; and –the anticipated new science at the ILC is supported by clear physics results at the LHC.

Department of Energy Office of Science High Energy Physics 5-year budget User Facility Operations includes Tevatron/NuMI and B- factory operations and support Construction is the Electron Neutrino Appearance (EνA) experiment Research is everything else B/A (dollars in thousands) FY 2006 Approp. FY 2007 Request FY 2008FY 2009FY 2010FY 2011 User Facility Operations 309,139308,647277,000241,400215,000 Construction ——10,30018,90051,20043,50026,100 Research 407,555456,152489,100517,400631,500733,900 Total, HEP 716,694775,099785,000810,000890,000975,000

Department of Energy Office of Science HEP Outyear Trends by Activity

Department of Energy Office of Science Overarching Issues The HEP program in is a combination of: –LHC (including upgrades) –Neutrinos (MINOS  EvA, Reactor Nu, Double Beta Decay?…) –Dark Energy and Dark Matter –ILC R&D  construction? Is this a “leadership” program? Does it provide enough opportunities for students? For the rest of the community? If ILC does not happen, what then?

Department of Energy Office of Science Outyear HEP Program

Department of Energy Office of Science FY08 Issue: ILC R&D ILC R&D and pre-construction budget has evolved from a “technically- driven” one with construction start in to a budget-driven one with construction start in –Partly due to overall SC budget constraints –Also partly due to OMB/OSTP “optics” constraints See following slides –Shortfall relative to technically-driven schedule is $38M in FY08 [FY08 ILC R&D budget is $75M vs. est. need of $113M] Most of shortfall is in ramp-up of US industrialization effort International partners/competitors (Europe, Asia) are investing at least this much in near term: –Estimated European FY08 expenditure: $130M Includes test facilities and industrialization –Japanese effort is ~comparable to U.S. plan (no detailed #s yet); plus growing efforts in Korea, China, India Impact of shortfall is that we will not be ready in time with industrially-produced components that can verify technical readiness

Department of Energy Office of Science Nominal ILC Profile

Department of Energy Office of Science Range of ILC Profiles

Department of Energy Office of Science ILC Profile Surgery

Department of Energy Office of Science Pretty Pictures from Paul [insert here]

Department of Energy Office of Science Broader Impacts of ILC (Money makes the World go ‘round) But SRF also has broader applications…

Department of Energy Office of Science Other FY08 Issues There are other (smaller) FY08 resource issues that we are handling within the HEP Target: –Fermi RunII +$6M projected power rate increase in FY08 vs 07 –Revised EvA profile (TPC was $150M, now ~$250M) –Funding for SLAC advanced accelerator R&D facility (SABER) –Division of SLAC GPP and maintenance activities (with BES, TBD) To solve these problems we had to make priority decisions: –Slowed recovery of core research and R&D programs –Stretched-out or deferred dark energy initiatives –Drop or find other funding sources for small neutrino experiments –Dropped participation in NP-led double beta decay experiment

Department of Energy Office of Science A Future without ILC Cue the violins

Department of Energy Office of Science “Decrement” Items B-factory Operations –To generate a 1.5% SC-1 reserve, we would eliminate $10M from FY08 SLAC Ops budget, severely reducing B-factory run time [need estimate] –Additional reductions could be taken (up to ~$20M) but this implies significant RIFs, end of Bfactory program EvA/NoVA construction –Could reduce funding profile for EvA construction (up to $20M) –Consistent with “wait and see” approach on ILC –Incurs schedule delay, risks some loss of competitiveness with respect to Japanese experiment Core Research and R&D –Hold at FY07 dollars (-$15M) –Inadequate to fully cover research needs of both Tevatron and LHC while closing out B-factory analysis –No funding for small but important efforts in: dark energy, neutrinos, advanced accelerator R&D (SABER)

Department of Energy Office of Science backups

Department of Energy Office of Science FY08/Outyear Issues Construction  EvA/NoVA profile is back-loaded; not much $$ available until B- factory Ops starts to roll off in FY09  Also total cost issues; may need a lot more resources (nominal TPC $150M; current estimate ~$200M+)  Plus incremental NuMI upgrades…  Front-loading profile as much as possible will reduce cost and schedule risk  Need to consider de-scope options  No other construction projects in pipeline until ILC $ in MFY07FY08FY09FY10FY11 Nominal Profile TPC=150M Current Estimate TPC=210M 1050