Resources in Construction / Materials. Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies.

Slides:



Advertisements
Similar presentations
DOCKMEN TRAINING LINC LOGISTICS INSIGHTS CORPORATION.
Advertisements

Site Waste Management Plans and the Code
Barhale Procedure for Site Establishment
STOCK CONTROL Inventory is often referred to as the graveyard of business because over investment in stock is a frequent cause of business failure.
A business makes payments for what it buys, In return it receives payments for goods it sells or services it provides.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
NEC - Engineering and Construction Contract (ECC)
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Financial Management State Conference July Purchasing Purchasing too much Purchasing high cost items Ordering the same amount each time No audit.
RECEIVE AND STORE KITCHEN SUPPLIES AND FOOD STOCK
Stock related security
Receiving, Storing, and Issuing
Selecting A Contractor - Types Of Tendering. Requirements of the Contractor Has experience with the type of project to be developed. Is able to cope with.
COINS-etc eCommerce Platform. COINS-etc..... working closely with contractors and their supply chain partners, to improve the effectiveness of information.
CONSTRUCTION AND MAINTENANCE DEPARTMENT THE DRY DEPARTMENT PRESENTED BY HELLEN N. KARU University of Nairobi 1.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Managing Purchasing and Inventory
Flow of financial docs between businesses
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
EM15 – Contractors COST MANAGEMENT
Stock Control Today you will know what stock control is.
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
April 11, 2007 Strengthening Communities Conference Managing Your Risks Ron Dennill Northern Communities Insurance Program.
Chapter 15 Industrial Security. Loss Specific to Industry  Industrial losses frequently include:  Tools.  Materials.  Supplies.  Products.  Pallets.
Specification section 3.1
Chapter 8 Purchasing and Recieving Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Describe the role.
Purchasing & Stock Handling
Inventory Planning and Management Chapter 5. Inventories include all tangible items held for sale or consumption in the normal course of business for.
Trade Management  Module 4.  Learning Objectives:  Managing receivables  Securing receivables  Sales documentation.
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
Managing Purchasing and Inventory 1 PROCUREMENT. Managing Purchasing and Inventory 2 Describe the importance of planning purchases. Identify factors that.
Modul ke: Fakultas Program Studi Akuntansi Biaya Direct Material Cost Diah Iskandar SE., M.Si dan Nurul Hidayah,SE,Ak,MSi 09 FEB Akuntansi.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
Operations Stock Having stocks enables: - Goods to be available for production Delivery to customers Shows the goods available for production Enables.
Materials Planning & Control. Introduction With the development of ‘integrated materials management’ and ‘supply chain management’, material managers.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Costing and accounting system Session 1-2. Types of inventory Direct material ▫Which represent direct material in inventory awaiting manufacture. Work.
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
Section Objectives Describe the importance of planning purchases.
PROCESS COSTING CHAPTER - 1. Chapter outcomes  Meaning and nature of process costing  Application of process costing  Fundamental principles of process.
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
Outcome 2 Requirements for installing sanitary appliances Unit 207: Sanitation.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Your Electricity Expenses During Winter and Summer Cooling fans are an essential component of any electronic system. The reason for this is that electronics.
Stock Intermediate II and Higher Business Management.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Chapter 7 Pages Supply chain management – the process of integrating and planning, implementing and controlling the systems of organisations,
Roles and responsibilities PM
Controlling and Costing Materials
ROUTE MANAGER TRAINING
PROCEDURE FOR PURCHASING DRUGS
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Costs and Economics of Construction
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
First Article Test (FAT) / Production Lot Test (PLT)
ARCH 435 PROJECT MANAGEMENT
Receiving Inspection on incoming goods
Bunker Project Schedule/Budget
CEM 515 Done by: Abdulkarim Sulais
RECEIVE AND STORE KITCHEN SUPPLIES AND FOOD STOCK
Presentation transcript:

Resources in Construction / Materials

Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies accounts may be set up with some suppliers and foremen are given the responsibility for ordering materials. With medium or large companies the purchasing of materials is usually handled by head office staff. However the site manager could be given this responsibility on smaller contracts. Material management includes –Quality control and scheduling / testing –Ordering –Handling and storage –Waste control –Security

Materials for Construction Quality control Prior to work starting on site, the architect or engineer may require samples of materials to be provided for their approval. These are called sample panels. If samples are not used the contractor will still use materials and components which match with the contract documents. These documents include the bill of quantities, contract drawing and specification. When materials are delivered to site they need to be checked. Unsatisfactory materials should be returned to the supplier.

Materials for Construction Ordering materials The procurement of materials begins at the estimating / tender stage: Quantities are taken from the bill of quantities or measured up on site. Enquires are sent to suppliers and prices are obtained. The correct quality and quantity of materials must be ordered. Deliveries should be planned in advance so that no hold up occurs in the production process, but not too far in advance that materials will get damaged before they are used.

Materials for Construction Handling and storage of materials Carelessness when unloading materials can cause waste. Having the correct plant to handle materials is important. Bricks and blocks are now usually delivered on pallets and they are lifted off using telescopic handlers. This is quicker than lifting them off by hand. It is better to lift off the material where it is going to be used as this saves time. The storage of materials is as important as their handling. There are problems if materials such as plasterboard get damp. Incorrectly stacked materials causes problems. Doors should be stored flat. Materials can be stolen if not stored securely.

Materials for Construction Waste Control Approximately 35% to 45% of the cost of construction work is spent on materials. It is therefore important that they are used efficiently. Two common causes of waste include –Excess materials being left unused –Damaged materials being unusable In order to prevent waste on site it is important that there are supervisors on site, and site operatives are trained in the correct way.

Materials for Construction Security Theft and vandalism cause problems on many building sites. The losses incurred must be added to the value of materials when allowing for waste. Small hand tools and even large items of plant are also stolen and their loss causes delays to production and an increase in insurance costs. It is difficult to define a set of rules which would prevent theft and vandalism on sites. They vary so much in size and location. Some prevention measures are –Checking deliveries –Stop Site operatives taking items –Control of vandalism –Vigilance against theft –Crime prevention –Security

Materials for Construction Storage Correct storage for sheet materials, plasterboard or doors. Stack on a continuous even platform in a fairly dry environment. It is particularly important that doors are stored in a temperature similar to that which they will eventually be positioned.

Materials for Construction Storage Correct storage for facing brick, paving brick and concrete blocks. Stack on a continuous even platform “normally a pallet”. Stacks should be no more than 1.8 metres high. The pallets of brick should be stacked on a level area which has been hard-cored. Facing brick are supplied from the manufacturer wrapped in polythene to prevent them getting damp.

Materials for Construction