DEVELOPMENT OF TRANSMISSION & DISTRIBUTION NETWORKS & VANDALISM PRESENTATION BY DR C. E. IFESIE HEAD TRANSMISSION TRANSMISSION COMPANY OF NIGERIA.

Slides:



Advertisements
Similar presentations
Page 1 Outage Management Roy Hoffman 29 Jan 2001.
Advertisements

Earthing of MV and LV Distribution Systems: A multi-faceted problem.
Select Committee on Economic Development Impact of Cable Theft on Economic Development.
Telecommunications Overview Richard Selby. Local Access Network The link between the customer and the Local Exchange (or Switch) Sometimes called the.
A Path breaking Technology for Network Maintenance and Optimization
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Westar Energy Emergency Preparedness and Restoration TFR Meeting June 26, 2012 Jim Tyler Director, Distribution Services.
How to use this presentation. How Power is Restored After a Severe Storm Presented by YOUR NAME YOUR TITLE.
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Microgrid – A Smart Grid Alternative Service Delivery Model? Thomas.
Ward 21 Reliability Cedarvale and Surrounding Area Prepared for Councillor Mihevc Toronto Hydro System Planning March 25, 2015.
Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013.
Copper Theft Update Mayor and Council May 22, 2012.
City of Leesburg Electric Department City of Leesburg Electric Department CIP-001 Sabotage Reporting.
NICC PLC Update Paul Momtahan, Head Of Marketing.
CenterPoint Energy Houston Electric 2011 Response to Contamination Conditions John Kellum Director of Transmission Operations August 3, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
Security Benefits of Energy R&D Presented to the Conference on Estimating the Benefits of Government-Sponsored Energy Technology R&D March 4, 2002 Margie.
An Introduction to Renter’s Insurance Presented by INSERT NAME: Financial Education Program on Insurance Nationwide and the Nationwide frame are federally.
© 2012 Cengage Learning. All Rights Reserved. Principles of Business, 8e C H A P T E R 4 SLIDE Social Responsibility and Business Ethics Government.
DET 310 UNDERGROUND CABLES
Electricity Service Delivery 2 Aim To provide students with information to enable them to deal with the effects of electricity at incidents.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
Increasing the life cycle of existing grids to avoid high replacement costs of new systems By S.R.Sethi Member Delhi Electricity Regulatory Commission.
Unit of measure *Footnote Source:Source Working Draft - Last Modified 17/09/ :19:19 Printed 17/09/ :28:20 CONFID ENTIAL Document Date This.
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
PSerc Lightning Protection: A Stroke of Luck? Theory and Application: Customer Side Low Voltage Systems Ward Jewell Wichita State University APPA 2005.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
APPLIED ELECTRICITY SS3
Utilizing BPL to create a 21 st Century Grid. Agenda > Electrical Infrastructure Review > Oncor Electric Delivery - Current Relationship > Project Status.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
The Copper Development Association Africa SECOND-HAND GOODS BILL Oral Submission John Cross Greg Hoets.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
After the Storm Recreated from Carolina Country, the monthly magazine of the N.C. Association of Electric Cooperatives The steps to restoring power Click.
© 2012 Cengage Learning. All Rights Reserved. Principles of Business, 8e C H A P T E R 4 SLIDE Social Responsibility and Business Ethics Government.
Source of Energy. Vision Mission It is Power Consultancy's mission to provide the finest energy solutions. Through careful analysis, attentive customer.
Energy Storage Applications at AEP Emeka Okafor American Electric Power Presentation to SouthWest Electric Distribution Exchange May 7, 2009.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
SINTEF Energy Research 1 Fault statistics in distribution network Regulation of quality of supply Gerd Kjølle, Norway, RT3.
Frankfurt (Germany), 6-9 June 2011 Nuno Ferreira– Portugal – Session 3 – Paper ID:561 UTILITIES RESPONSE TO EXTREME CONDITION EVENTS EDP DISTRIBUIÇÃO CASE.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Utility Engineers, PC.  Generation  Transmission  Distribution.
POWER HOUSE.
Distribution Systems-General
SERVICE ENTRANCE EQUIPMENT
Business Process Mapping “Power Sector - Distribution”
Wireless Electricity Transmission
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
132KV GSS PIPAR CITY JODHPUR
All About Workplace Electrical Safety
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
An Introduction to Transmission Media
Topic Name: INSULATORS
SUB-STATIONS.
BUSINESS CONTINUITY BY HUI ZHENG.
Power Generation and Distribution
4 Social Responsibility of Business and Government
4 Social Responsibility of Business and Government
Work experience presentation
4 Social Responsibility of Business and Government
Review of Distribution Network Protection
Protect Your Ecommerce Site From Hacking and Fraud
Engineering Materials 27
Presentation transcript:

DEVELOPMENT OF TRANSMISSION & DISTRIBUTION NETWORKS & VANDALISM PRESENTATION BY DR C. E. IFESIE HEAD TRANSMISSION TRANSMISSION COMPANY OF NIGERIA

DEFINITION VANDALISM – destructive action: the malicious and deliberate defacement or destruction of somebody else’s property VANDALS – somebody who damages property: somebody who maliciously and deliberately defaces or destroys somebody else’s property

TRX & DISTRIBUTION INFRASTRUCTURE SUBSTATIONS – POWER/DISTRIBUTION TRANSFORMERS – EARTHING/GROUNDING MAT – FEEDER PILLARS TRANSMISSION & DISTRIBUTION LINES – TOWERS/PYLONS – CONDUCTOR – COUNTERPOISE CABLE – EARTH WIRE – INSULATORS COMMUNICATIONS – OPTICAL GROUND WIRES – REPEATER STATIONS METERS

VANDALISM ( SUBSTATIONS ) Power transformer insulating oil siphoned away whilst in service Silica gel removed from live transformers Distribution transformers stolen Grounding mat cut and removed Feeder pillars stolen Feeder pillar fuses removed

TOWERS/PYLONS CUT AND FELLED CONDUCTOR CUT & STOLEN COUNTERPOISE CABLE CUT & STOLEN EARTH WIRE CUT & STOLEN INSULATORS REMOVED VANDALISM ( LINES )

VANADALISM( COMMUNICATIONS ) OPTICAL GROUND WIRES REPEATER STATIONS

VANDALISM ( AT CUSTOMER’S PREMISES ) METERS ELECTRICITY?

WHY VANDALISM? ECONOMIC – MASSIVE INCREASES IN METAL PRICES EQUIPMENT SOLD FOR CASH? MATERIALS RECYCLED INTO THE SYSTEM? CONDUCTOR SMELTED & SOLD AS INGOTS? CONDUCTOR SMELTED AND FORMED INTO OTHER PRODUCTS? CONDUCTOR REWOUND FOR OTHER APPLICATIONS? EARTHWIRE REWOUND FOR STAYS? TOWER MEMBERS FOR BEDS?, SMELTED?, SCRAP MARKET? MISCHIEF OR GAME? – SHOOTING AT GLASS INSULATORS SABOTAGE? IGNORANCE – BUSH BURNING

STATISTICS NEW HAVEN/OTURKPO/YANDEV 132KV LINE – VADALIZED 36 TIMES BETWEEN FEB’97 & APRIL’05 – COST N111,310,783 TO RESTORE – OUTAGE LASTED FOR A TOTAL OF 152 DAYS – VANDALIZED ON AVERAGE EVERY 2.5 MONTHS – LINE OUT DUE TO VANDALISM FOR 5% OF PERIOD CONSIDERED – FOUR STATES (EBONYI, TARABA,KOGI & BENUE) SUFFERED THE OUTAGE – VANDALISM OCCURRED BETWEEN 2318HRS & 0300HRS SYSTEMWISE BETWEEN 1999 & 2000 COST OF RESTORATION OF VANDALISED TRANSMISSION LINES AMOUNTED TO N562,491, TRX OPERATION & MAINTENANCE EXPENSES IN 2002 – N1,280,528,000

VANDAL ELECTROCUTED IN BAUCHI

IMPACT OF VANDALISM FUNDS WASTED ON REPAIRS RATHER THAN NEW PROJECTS REVENUE LOSS OUTAGES EQUIPMENT DAMAGE SUPPLY INSECURITY ADVERSELY AFFECTS MAINTENANCE POOR SUPPLY RELIABILITY LOSS OF LIVES PROJECT DELAYS DIVERSION OF EFFORT & RESOURCE AWAY FROM CORE BUSINESS INCREASED PROJECT COSTS INDIRECT COSTS – LEGAL – CONSEQUENTIAL – POOR IMAGE – LOSS OF PERISHABLES – LOSS OF BUSINESS

DESIGN CONSIDERATIONS – ANTI-VANDAL BOLTS FOR TOWERS – DEPLOYMENT OF TUBULAR PYLONS – BLOCWALL FENCING OF SUBSTATIONS – EMBOSSING/BRANDING OF MATERIALS – USE OF SPECIAL CONDUCTORS – USE OF STEEL EARTHING MATERIALS – POLYMER INSULATORS – HV DISTRIBUTION NETWORK – CONTRACT EPC CONTRACT MATERIALS SOURCED FROM MANUFACTURERS ONLY

ACTIONS IN TIME REGIME OF SUSPECT TRIPS INCREASED PATROL OF TRANSMISSION LINES DEPLOYMENT OF SECURITY AGENTS IN LINE PATROLS COOPERATION & INFORMATION EXCHANGE WITH THE POLICE INCREASED COMMITMENT IN PROSECUTING CULPRITS LEGISLATION ON SECONDARY METAL MARKETS OPERATIONAL CONSIDERATIONS

OTHER PREVENTIVE SCHEMES INVOLVING COMMUNITIES TO SECURE DISTRIBUTION TRANSFORMERS DEPLOYMENT OF VIGILANTE GROUPS LIAISONS WITH COMMUNITY HEADS PUBLICATIONS & MEDIA STREET LIGHTING

THE FUTURE OF VANDALISMFUTURE INCREASING COST IN METAL PRICES PRIVATISATION OF UTILITIES NEW MATERIALS ENVIRONMENTAL AWARENESS INCREASING AUTOMATION – CYBER ATTACKS – MALICIOUS – VIRUS

THANK YOU