Highway 1/169 Improvements Six Mile Lake Road to Bradach Road “Eagles Nest” October 10, 2014 Project Update Meeting Eagles Nest Town Hall.

Slides:



Advertisements
Similar presentations
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
Advertisements

OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Titusville to Edgewater Bike Loop PD&E Study
Duane Hill, District Engineer
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Port St. Lucie City of Crosstown Parkway Extension Project Development and Environment (PD&E) Study & Environmental Impact Statement (EIS) Substantial.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Longmeadow Parkway Fox River Bridge Corridor
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
Agenda 6:30 – 7:00 p.m. Open House 7:00 – 7:20 p.m. Presentation Welcome Introductions Project Overview Meeting Purpose Environmental Review Process Other.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Metro South Planning MetroLink in South St. Louis County Metro South MetroLink Extension Alternatives Analysis and Draft Environmental.
Welcome Opportunity to Learn – Public, Groups, Agencies and FS Patience Respect Ask.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
USA Parkway Project Welcome Public Information Meeting to the
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
Citizens Committee Meeting #10 October 15, Agenda 1.Project Update Minutes - Special Meeting – Sept. 30 th 2.RDOS Planning and Development Committee.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Hummock Pond Road Bike Path Implementation Update January 25, 2012.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
ECNM Meeting October 1, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects.
 Working with FHWA on review.  Submit to Cooperating Agencies (EPA and Corp of Engineers)  45 day review May  Respond to agency comments  Publish.
State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018.
FHWA CMGC Workshop October 23, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-25 South Gap Project I-25 Gap Coalition Meeting
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
S.R. 26 Road Rehabilitation in Clinton County
Walker Street Reconstruction Project 25% Design Public Hearing
Center City Connector Fall Open House Presenter: Ethan Melone,
I Street Bridge Replacement Project
Presentation transcript:

Highway 1/169 Improvements Six Mile Lake Road to Bradach Road “Eagles Nest” October 10, 2014 Project Update Meeting Eagles Nest Town Hall

Project Update Report on Progress since July 2014 Build Alternatives – Minor Revisions/Layout Refinements Estimated Detour Days & User Costs Wetland Impacts Revised Environmental Review Process Discuss Project Schedule Why are we here TODAY?

Short Presentation ~ 15 min Questions/Comments 3 Minute Limit per person Today’s Meeting Guidelines

Project Meetings (Since July 2014) EPA MnDOT and FHWA traveled to Chicago Discuss Project Alternatives - Update Mix and Match East and West Segments Sulfide Rock-Related Issues Corp of Engineers Public Notice Period for Wetland Permit Timing Project Update

Middle Route (Constructed Under Traffic)-PINK BLUE Existing Route (Constructed Under Detour)-BLUE South Route - ORANGE Hybrid Alternatives Build Alternatives

Alternatives ImpactsNo Build Existing Route w/Detour Middle Route w/ Traffic South Route Project Funds (HPP) $15.3M (Fed.) + $3.9M (State) = $19.2M Construction/ROW Cost (1) Estimate $0$18.5 Million$17.3 Million$21.6 Million Wetland Impacts 0 Acres6.6 Acres13.3 Acres17.3 Acres Rock Exc. (Vol.) None126,000 CY69,000 CY266,000 CY Detour Impacts (2) -User Costs 0 Days $0M Days $2.8M - $4.7M 0-21 Days $0M - $0.7M 0 Days $0M Shoulder Widths 3’ paved / 1’ grvl 6’ paved/2’ grvl (1) 2016 Dollars (2) Estimated Duration – To be modified with Final Design

West Segment Impacts Existing Route w/Detour Middle Route w/ Traffic South Route Passing Opportunities (total both directions) 1.04 Miles1.2 Miles3.2 Miles Wetland Impacts 3.8 Acres6.1 Acres3.8 Acres Rock Exc. (Vol.) 11,000 CY38,000 CY132,000 CY Detour Impacts YesNo

East Segment Impacts Existing Route w/Detour Middle Route w/ Traffic South Route Passing Opportunities (total both directions) 1.02 Miles1.2 Miles1.7 Miles Wetland Impacts 2.8 Acres7.2 Acres13.5 Acres Rock Exc. (Vol.) 116,000 CY31,000 CY135,000 CY Detour Impacts YesNo

Hybrid Alternatives 2A Hybrid3A Hybrid Impacts WestEastWestEast Project Funds (HPP) $15.3M (Fed.) + $3.9M (State) = $19.2M Construction/ROW Cost (1) Estimate $20.0 Million$19.5 Million Wetland Impacts 6.6 Acres11.0 Acres Rock Exc. (Vol.) 248,000 CY163,000 CY Detour Impacts (2) - User Costs Days $1.6M - $2.3M 0-15 Days $0 - $0.5M Shoulder Widths 6’ paved/2’ grvl (1) 2016 Dollars (2) Estimated Duration – To be modified with Final Design

Purpose and Need – EPA and COE Concurrence Alternative Analysis - EPA and COE Concurrence Cooperating Agency Review Draft EA – (now in progress) EA Publication/Public Comment Period/Public Hearing – Opportunity for public comments on EA content, including social, economic, and environmental impacts and minimization/mitigation measures. EA will identify a preferred alternative. MnDOT and FHWA review of comments, and make decision if there is potential for significant impacts. Environmental Review Process

Complete Environmental Documentation Review Draft Environmental Assessment to FHWA and Cooperating Agencies- October 2014 EA Public Comment Period/Hearing – Dec/Jan Alignment Selection – February 2015 Final Plans – Fall 2016 ROW Acquisition Complete – December 2016 Permitting - December 2016 Construction – Goal is Begin in Winter of 2016/2017 Project Schedule - Steps For Completion

QUESTIONS / COMMENTS? 3 Minute Limit per person

Design Build Method of Construction Corp of Engineers Permit Innovative ways to streamline ROW Acquisition process Access for Tree Clearing Opportunities to Expedite Construction

Overland Flow Question