I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit IX: Commander’s Inspection Report (CCIR) SAF/IGI Office of The Inspector General 24.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

April 19, 2012 SBE Presentation on Performance Evaluations.
Inspection experiences Dr Sandy Mather Director of Regulation.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit IV: Management Inspection Control Toolset (MICT) SAF/IGI Office of The Inspector General.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit II: Unit Effectiveness Inspection (UEI) SAF/IGI Office of The Inspector General 24.
Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
NACE Direct Assessment Standards Office of Pipeline Safety (OPS) Public Meeting November 4, 2003.
Eighth Army Command Inspection Program (CIP)
Press Kit III: Commander’s Inspection Program (CCIP)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit V: FAM Role in new AF Inspection System (AFIS) SAF/IGI Office of The Inspector General.
Genius online Appraisal Management System 1. Appraiser Configuration Getting Started Appraisal Management let the user to effectively conduct a users.
WGITA Project Governance Wayne Jones Executive Director Australian National Audit Office.
Fiscal Year 2013 Annual Plan BRIEFING TO: COASTAL PROTECTION AND RESTORATION AUTHORITY Baton Rouge, LA January 18, 2012.
Information Systems Security Officer
Revised Noncommissioned Officer Evaluation Reporting System
Building a Compliance Risk Monitoring Program HCCA Compliance Institute New OrleansApril 19, 2005 Lois Dehls Cornell, Esq. Assistant Vice President, Deputy.
Role, Responsibilities and Tasks
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit I: Air Force Inspection Introduction SAF/IGI Office of The Inspector General 24 June.
Secretary UNLV Alumni Association Leadership Development Day March 3, 2012.
Making Sense of Remainders
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Compliance Inspection and You Presented by Julie DeBardelaben, NHQ/PA & Norma Moreno, IG Shop, CAP-USAF.
Protocol Lifecycles.  At their meeting in May, the GSA Board approved a new policy that establishes a well-defined three-year lifecycle for GSA protocols.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit VII: Unit Effectiveness Inspection (UEI) Lessons Learned SAF/IGI Office of The Inspector.
Contra Costa County Office of Education May 2015 Local Control Funding Formula: Supporting Continuous Improvement.
Copyright Medical Group Management Association. All rights reserved. Name, credentials Organization Date Preparing Your Office Practice for Disaster.
Halton Inspection Planning - Journey of the Child Unannounced Ofsted Inspection Mark Grady Principal Policy Officer, Children & Enterprise.
Classification – on Master 1 Navy Uniform Board. Unclassified 2222 Uniform Policy Principles  Uniform changes shall be kept to a minimum and shall be.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
Quality Accounts Dr Cheryl Crocker Director Quality and Patient Safety/Executive Nurse.
Experience with the use of monitoring results Ms Blagica Novkovska, MSc, Director General of the State Statistical Office.
ICT Teachers Training “About ICT” Presented by Kulkarni S.A. Mob No :
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit VI: UEI Continual Evaluation SAF/IGI Office of The Inspector General 24 June 2013 OVERALL.
Community Assessment Training 3- Community Assessment Training 6-1.
ACP Finance DC FB 4.Appointment of Taskforce Team Taskforce Team 5.Environment Scanning Plan (ESP) 8.Potential & feasible? 7.Confirm the ESP Result 10.Detailed.
Ofsted framework September 2012 Changes and implications for Clerks and Governing Bodies Clerk briefings September 2012.
SUI Process Overview Timeline  60 Days before SUI Due Date  30 Days before SUI Due Date  10 Days before SUI Scheduled Date  5 Days before SUI Scheduled.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
Comparability Protocols Nancy Sager Associate Director, QIS-Chemistry FDA/CDER/OPS.
Way forward with WSAM C Strydom IWRP Systems User Forum 1 July 2004, Pretoria National Botanical Gardens Sub-Directorate: Systems Analysis Directorate:
A System of Instructional Effectiveness: Connecting the Dots The District Accountability Plan (DAP) Bloomfield Public Schools Every Student,
Every Student Succeeds Act January Christopher Woolard Senior Executive Director, Center for Accountability and Continuous Improvement Colleen D.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
Paula Feuerbacher Strategic Projects Senior Advisor Tab 5.2: Recommendation Regarding Proposed 2013 ERCOT Key Performance Indicators (KPIs) Human Resources.
TACTICAL OFFICER LEADERSHIP. Tactical Officers are Individual Developers I believe that no other faculty or staff member has as much direct effect on.
CRJ 422 GENIUS Teaching Effectively/crj422genius.com FOR MORE CLASSES VISIT
CIS 170 MART Teaching Effectively/cis170mart.com FOR MORE CLASSES VISIT CRJ 422 GENIUS Education Expert/crj422genius.com FOR MORE CLASSES.
Draft Revised Ordinance Cross Connection Control and Backflow Prevention March 27, 2015 Sun City Center.
 Create a budget  Deliver the State of the Union  Enforce laws  Create a budget  Deliver the State of the Union  Enforce laws Responsibilities of.
 Create a budget  Deliver the State of the Union  Enforce laws  Create a budget  Deliver the State of the Union  Enforce laws Responsibilities of.
Messay Tassew, Evaluation Specialist UN Women Independent Evaluation Office New York March 11, 2015 UNEG EPE - Strengthening decentralized evaluation functions.
1 1 Influencing Evaluation Policy and Practice: A Progress Report from AEA’s Evaluation Policy Task Force Patrick Grasso Chair, AEA Evaluation Policy Task.
Preparation of the Self-Study and Documentation
Preparations for REF 2020: MDS College Assembly
Corporate Learning Course
Michel BRENON IEC ExTAG Secretary
Overview of Stakeholders and Key Roles
The MDMP Process MDMP Inputs MDMP Outputs Step 1 MDMP Inputs Step 5
Training Appendix for Adult Protective Services and Employment Supports June 2018.
How to improve their contribution to programme quality?
Corporate Learning Course
Initiative Governance Process Model
Evaluations & Student Growth Measures
international Cricket Council Annual Plan Template 2013
Subordinate Unit Inspection Preparation
Concept Proposal template for presentation by Dean to evaluation panel
Assessment and completion
Training Course in the Evaluation of Internal Control Systems (ICS) for Smallholder Group Certification © IFOAM, October 2004 Authors: Florentine Lechleitner.
Evaluations & Student Growth Measures
Staff Retreat – FY 17 ATP Sections
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit IX: Commander’s Inspection Report (CCIR) SAF/IGI Office of The Inspector General 24 June 2013 OVERALL BRIEFING CLASSIFICATION: UNCLASSIFIED

I n t e g r i t y - S e r v i c e - E x c e l l e n c e CCIR Requirement Wing CC’s will: Forward a report to MAJCOM/CC within 90 days of assuming command and annually thereafter. As a minimum, the report will include the Wing CC’s assessment of the 4 Major Graded Areas (MGAs) and sub-MGAs over the reporting period. 2

I n t e g r i t y - S e r v i c e - E x c e l l e n c e How do we build a CCIR? Wg/IG or CCIP Director prepares the report Follow format in the approved template No specific requirement for length longer report is not always better as a minimum, cover MGAs & sub-MGAs remainder IAW Wg/CC & NAF guidance Consider using pre-existing data/trends from: CC’s Inspection Management Board (CIMB) CCIP dashboard Wing Inspection Team (WIT) results/reports MICT results/trends 3

I n t e g r i t y - S e r v i c e - E x c e l l e n c e CCIR Process Drafted by Wg/IG or CC’s Inspection Program (CCIP) Director Reviewed/approved by Wg/CC Wg/CC submits to NAF for review/approval After NAF approval, Wg/CC submits final version to MAJCOM Use SIPRnet to transmit CCIR to protect potential vulnerabilities 4 CC to CC accountability, then IG & functional awareness afterwards

I n t e g r i t y - S e r v i c e - E x c e l l e n c e What will MAJCOM IG & Functionals do with CCIR? MAJCOM IG Use the CCIR as another input into the overall UEI continuous evaluation Compare the results from UEI Capstone with the CCIR to determine CCIP effectiveness MAJCOM Functionals Use the CCIR to determine what help the Wg/CC needs to solve problems Pursue any problem areas in functional role Determine if any MAJCOM problems exist & way ahead 5

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Questions? 6