Using VIRTIS for Permit Analysis By Terry D. Leatherwood, P.E.

Slides:



Advertisements
Similar presentations
Surface Mining Control Reclamation Act Michael Dashefsky Period: 4 Bodas.
Advertisements

Presented by: Mike Sisson February 23, It is the Law The Americans with Disabilities Act of It is the Right Thing to do Provide Equal Access.
VOBUG Conference August 3 rd, 2010 Nashville, Tennessee Robert LeFevre, P.E. Adam Price, P.E. Tennessee Department of Transportation Structures Division.
DESCRIPTIONDESCRIPTION PROCEDURESPROCEDURES CUT- THROUGH RESTRICTION TRAFFIC- CALMING $200 FINE FOR SPEEDING SIGNS MULTI-WAY STOP (“MWS”) SIGNS THROUGH.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
INTRODUCTION TO INFRASTRUCTURE: AN INTRODUCTION TO CIVIL AND ENVIRONMENTAL ENGINEERING Chapter 4: Transportation Infrastructure.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Rating of Local Bridges for SHVs Using Virtis Software Virtis/Opis User Group Meeting August 3-4, 2010 Moises C. Dimaculangan, P.E. Minnesota Department.
Minnesota Department of Transportation House Transportation Policy & Finance Committee February 23, 2015.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Chapter 34 Bridge Construction.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
Bridges unit 101.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Reconstruction of the Eads Bridge Highway Deck
Transportation Study for City of Bluffdale Porter Rockwell Boulevard is a planned, designed and partially built major arterial road that connects Mountain.
Overheight Loads WSDOT Commercial Vehicle Services.
Chapter 4. NEVER drive faster than weather or road conditions allow Always slow down On narrow winding roads At intersections or railroad crossings On.
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
Cranes, Hoists and Truck Hoists
Signs, Signals, and Pavement Markings
Shear Capacity of Composite Steel Girder at Simple Support Virtis/Opis User Group Conference Nashville, TN, August 3-4, 2010 George Huang, PhD, PE California.
There are more than 500,000 bridges in the United States!
Ch. 6 - Passing NY State DMV 1. The law requires that we drive on the right side of the road.  When we are allowed to pass other vehicles, we usually.
MNG221 - Management Science
Manitoba Infrastructure and Transportation RADBUG - August 2014 Water Management and Structures.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
MICHIGAN DEPARTMENT OF TRANSPORTATION Transport Permit Unit
The Origin and history When the Sydney Harbor Bridge was opened by the Premier of New South Wales, Mr. Jack Lang on the 19th March 1932, the Harbor Bridge.
St. Anthony Falls Bridge By: Timothy Brewer St. Anthony Falls Bridge Backround Location: Minneapolis, Minnesota Design: Steel Truss Arch Bridge I-35.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
INTRODUCTION Grade separation is an effective way of handling intersecting traffic with greatest efficiency, safety, capacity. An interchange is a system.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
WHY WEIGH AXLES ? THE ANSWERS AND SOLUTIONS FROM.
Janet Sanford TeamWorks Consulting - Operator.  The Permit System has been in place since the mid-1980’s to track and monitor overweight (non-divisible.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Office of Highway Safety Boston, Massachusetts July 10, 2006.
Unit 4 Chapters 7, 9, 10 and 11.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Posting and Utilities Technical Standards Branch Class.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
JULY 16, 2013 BCC APPEAL HEARING ON BZA SE , JUNE 06, 2013 APPLICANT: KEVIN DONAGHY AGENT FOR CHANTEL PRESTON.
Virginia Department of Education
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
“First In the Nation” Diverging Diamond Interchange IS 44 and MO 13 - Springfield, MO Joseph C Rickman, PE, ACTAR District Traffic Engineer MoDOT – Springfield.
Information Processing: Complex Risk Environments Topic 1 -- Characteristics of Expressways Topic 2 (through Lesson 1)-- Entering, Changing Lanes, and.
Transportation Finance Advisory Committee May 18, 2012.
Expressway Driving Legacy High School Drivers Education.
Geometric Design: General Concept CE331 Transportation Engineering.
Preparing VDOT’s GIS data for the Implementation of Bentley Superload Brian Young – GIS Technical Lead (ARS) Paul Bucher – Quality Assurance Officer Jean.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
Maintenance and Temporary Traffic Control
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Posting Bridges for Specialized Single-Unit Trucks
SBN Far Detector Installation & Integration
SDDOT –Load Rating & Permitting
New Bridge Construction
Highway 169 Bridge Replacement & Pavement Resurfacing
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Geometric Design: General Concept CE331 Transportation Engineering.
Design Criteria CTC 440.
NMDOT Ports of Entry New Mexico Infrastructure Finance Conference
Buckner Road Interchange at I-65 Public Meeting
Ron Hancock, PE NCDOT State Construction Engineer
Presentation transcript:

Using VIRTIS for Permit Analysis By Terry D. Leatherwood, P.E.

Dominion Virginia Power (Dominion), has submitted a USACE Joint Permit Application for Federal and state permits to build a hybrid clean coal power plant. The Virginia City site, consisting of reclaimed mined land, located near the City of St. Paul in Wise County, Virginia, was selected as the site for the new facility. As part of this project, a large generator needed to be moved to the St. Paul site. The load could not be moved to the site from Northern Virginia. The decision was made to bring it to Knoxville, Tennessee and move it into Virginia.

The generator was shipped by barge up the Tennessee River to Knoxville. The Barnhart Crane and Rigging Company would then move it from Knoxville to the Tennessee-Virginia State Line under a Permit issued by the Tennessee Department of Transportation. Barnhart would then complete the transfer by moving the generator from the Tennessee-Virginia State Line to the St. Paul site under a permit issued by Virginia.

ITEM WEIGHT: 795,869 LBS ( Metric Tons) TOTAL WEIGHT: 1,404,869 LBS (638.6 Metric Tons) NO. OF AXLES: 72 (40 Axle Lines) TOTAL LENGTH: 365’ 5” (111.4 Meters) TOTAL WIDTH: 21’ 9 ½” (6.64 Meters) TOTAL HEIGHT: 17’ 3” (5.26 Meters)

LENGTH OF ROUTE (TN): 81 Miles (130 Km) LENGTH OF ROUTE (VA): 89 Miles (143 Km) TOTAL ROUTE ON LAND: 170 Miles (273 Km) NO. OF TN BRIDGES TO CROSS: 12 NO. OF TN CULVERTS TO CROSS: 40 NO. OF UNDERPASSES: 3

First Issue was the Vehicle Configuration. Barnhart wished to use a trailer with a minimum number of axles and only two (2) prime movers. One push and one pull truck. As a result, axle weights were over 20,000 lbs. This violates Tennessee Law (TCA ). Barnhart asked for an exemption. However, because this provision is written directly into the Tennessee Code, it was determined that the Commissioner of Transportation does not have authority to grant an exemption.

Barnhart altered their vehicle. They added extra axles to the trailer to reduce the weight per axle to 19,640 lbs. They added two (2) extra prime movers. This allowed them to reduce the axle weight for the prime movers from 41,000 lbs per axle (worse case) to the legal limit of 20,000 lbs per axle. Total vehicle weight increased from 1.28 million lbs to million lbs. However, the resulting vehicle configuration was in compliance with TCA code requirements.

Strawberry Plains Pike has an underpass under Interstate 40 on the East Side of Knoxville. The available vertical clearance was 16’-5”. The vertical clearance was insufficient for the 17’-3” tall vehicle.

The underpass is part of a diamond interchange with Interstate 40. A median cross-over was built. This allowed the vehicle to use the on and off ramps to bypass the clearance restriction and cross the Interstate at grade level.

US-11E Bridge over the Norfolk-Southern Railroad Calculations indicated that the main span girders and the central bent cap would be overstressed by the vehicle. The central bent straddles the railroad tracks which makes the installation of shoring impossible (at the bent) because it would interfere with railroad operations.

The spans were modeled in VIRTIS using the non-standard gage tools. The analysis indicated that the center three girders carried the majority of the load when a centerline path is taken. The exterior girders were not over-stressed. The model was used to test various shoring plans by introducing upward (pre-load) forces at various locations. This allowed development of a shoring plan which reduced the stresses in both the girders and the center bent cap to below operating levels.

Analysis indicated that the load would overstress the bridge over North Liberty Hill Street in the City of Morristown. The structure consists of a four (4) span, continuous concrete T-Beam bridge. The bridge was designed with very shallow girders so as to maximize the vertical clearance on the underpass route. The design resulted in a very low rating factor for this superload. Because of the underpass route, shoring the bridge would be very difficult.

The North Liberty Hill Street Bridge is located in an interchange. It was possible to use the interchange ramps to bypass this bridge. North Liberty Hill Street already had a median cross-over installed at the site to accommodate regular traffic. Therefore, no modification of the interchange was required to accommodate this superload.

The vehicle needed to move from US-11E to US-25E to go North from Morristown. The normal path would be to take the underpass under US- 25E and then turn onto the on-ramp to US-25E. However, underpass clearances were insufficient for the 17’- 3” tall load. In addition, it would be very difficult for the vehicle to make the sharp turn onto the ramp.

Instead of taking the normal on-ramp, traffic on US-25E was shut down. This allowed the vehicle to go up the normal off-ramp to gain access to US-25E. After traveling approximately 600 feet North on US-25E (on the wrong side), the vehicle could use a median cross-over (already in place) to move to the correct (Northbound) lanes.

The largest structure crossed in Tennessee by this vehicle was the US-25E bridge over Cherokee Lake. This bridge has six (6) steel girder spans. The maximum span length is 333 Ft (101.5 Meters) and the total bridge length is 1,714 Ft (522.4 Meters). Although this bridge was built to the specifications at the time of construction (Mid 1970’s), the girder ends were under-stiffened according to current specifications. An inspection also revealed slight bowing of the girder webs. The fear was that this superload would significantly bow the girder webs.

The decision was made to strengthen the girder webs at each abutment location. A plan to add web stiffeners was developed. The plans were checked and approved by TDOT. Barnhart hired a contractor to install the stiffeners which will be permanent additions to the bridge. The installation was monitored by TDOT inspectors.

A retaining wall, on the edge of US-25E, had failed causing failure of part of the roadway. Analysis indicated that the roadway should not be used for passage of the superload. Using 25E to re-configure the vehicle was not feasible. Using the overhead bridge to bypass the problem would take too much time due to the complexity of the required bridge analysis.

Barnhart developed a plan to stabilize the roadway shoulder. The solution did not offer a permanent fix to the problem, but it stabilized the area sufficiently to allow passage of the superload vehicle. Therefore, the original route to the on-ramp was used. With solutions available for all problems, a permit was issued to allow passage in Tennessee.

TDOT required Barnhart to post a $15 million dollar bond to cover any damages caused by passage of the vehicle. A detailed traffic control plans was developed. The project was coordinated with law enforcement for traffic control. Approval from officials in the various cities and localities was obtained.

TDOT inspected every bridge and culvert crossed by this superload in Tennessee. There were two inspections performed on each structure. One before the move and one after passage of the superload. The roadways were also inspected by TDOT before and after the move. As a favor to the National Park Service, TDOT also inspected a pedestrian tunnel in the Cumberland Gap Park.

The move started on Saturday, June 19 th in Knoxville, Tennessee. Day 1 was the only daylight move. After June 19 th, all other moves were made at night. During the early morning hours of June 24 th, the vehicle crossed over into Virginia. It reached the St. Paul, Virginia, site on July 7 th.

All costs were paid by Barnhart and their customer. This includes all costs for traffic control, bonds, engineering analysis, law enforcement, bridge and roadway strengthening. TDOT spent over 1,000 man-hours in support of this permit request. Tennessee law allows recovery of the “actual cost” for permits over 1 million lbs in weight. The TDOT fee for this permit was $300,000.