Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.

Slides:



Advertisements
Similar presentations
2.01 Understand safety procedures Environmental Safety Fire Safety 2.01 Understand safety procedures 1.
Advertisements

Inspected in port Shanghai from 26th to 28th Sept by NCL
General Safety Overview and Information
Summary of NFPA 101 Interior Finish Requirements
Blitzfire Deck Gun Ground Monitor
How would you explain this on the 3394? If Fire Erupts on YOUR Boat If Underway, stop the boat Have everyone who is not wearing a PFD put one on Position.
Adelija Čulić-Viskota
Ship Profiles.
© Siemens Industry, Inc Confidential / Drive Your Business Forward Ignite the Power of New Products and Partnerships Siemens Fire Partner Summit.
FIRE FIGHTING PROCESS HAZARDS
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
The Life Safety Surveyor Facility Tour
C130 Fire Systems Part 2 This lesson covers the Fire Detection
USS Abraham Lincoln CVN-72 Everett, WA preparing for next cruise < 20mm Phalanx CIWS MK29 Sea Sparrow SAM Launcher > A private tour with Vern.
A cross-section of Rainier at stations 3 and 4 looks something like this - looking aft. Fuel for Station No. 3 is pumped from the tanks below; to ships.
Extinguishment via Fire-Square A fire can be extinguished by destroying the fire. If the fuel, oxygen or heat is removed, or the chain reaction is broken,
FIRE Fires in hotels and catering establishments are fairly common and can result in injury or loss of life to employees and customers.
2.01 Understand safety procedures Environmental Safety Fire Safety 2.01 Understand safety procedures 1.
In Australia, fire is a significant hazard to people, property and the environment. A fire at home can mean more than just a few days off. You, could.
3-1 NFIRS 3 Structure Fire Module. 3-2 ObjectivesObjectives The participants will be able to: –describe when the Structure Fire Module is to be used.
2.01 Understand safety procedures1 Environmental Safety Fire Safety 2.01 Understand safety procedures.
TEMPORARY HEATERS PROPANE SAFETY. TEMPORARY HEATERS l Circulating air type heater : maintain 12” clearance on both sides & rear.
LNG Hazards.
Module 2: General Working Conditions 2.5 Confined Space Entry Susan Harwood Grant Number SH F-23.
Liquid Fuel Safety Cummins Southern Plains, Ltd..
General Arrangement Plan
Safety on Board Fire safety  Common causes of fire  Smoking below decks  Solvents paints stored below  Gas build up in the bilges  Faulty wiring.
RIVER-SEA VESSEL RULES
Petroleum Production Fire Suppression
Dewatering Equipment.
PLATFORM UTILITIES PAB 2073 Reference: PCSB/PMO document.
Lesson 17 KEEPING WATCH. WATCHKEEPING 4 STCW 1978 (1995) 4 Watch (1) time period; (2) personnel 4 Personnel: Engineer officer in charge (watchstanding.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Survey Results from 2014 presentation: Maintenance of Conditions/Change in Conditions Robbie Walker.
CXS490 Carbon Dioxide Systems
 1. steel cutting  2. block  3. deck house.
exhaust regulator valve
Flammable and Combustible Liquids. Introduction !The two primary hazards associated with flammable and combustible liquids are explosion and fire !Safe.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Overview Identify the unique construction factors of single-family dwellings. Recognize the.
Fire depends on four things being present together, FUEL, HEAT, OXYGEN and A CHAIN REACTION. Fire will not start or continue if one is absent. FUEL is.
USS DEWERT (FFG-45) Example of Major Casualty Training Scenario for Final Evaluation.
FIRE SAFETY Unit 2, Activity 2
Diesel Fuel - Fill Place all spill safety equipment where needed
NOVEC Fire Suppression System
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
BOAT Regulatory Gross Tonnage – 199 Registered Length – 96’7” Registered Breadth – 29’ Registered Depth - 13’3” Draft – 14’ 6” Air Draft – 46’
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
A/C Power Systems General Locations. This module will cover the General Locations of the A/C Power Systems through out the vessel. The A/C Power Systems.
© Chevron 2009 Chevron Shipping Company LLC February 19 th 2010 the vital interface between shore fire fighters and a tanker at berth Tankers – a view.
Fire/General Service/Ballast Pumping Systems
Bilge Pumping Systems General Locations.
Getting Underway – Engine room
Fire Detection System General Locations and Operation.
ME444 ENGINEERING PIPING SYSTEM DESIGN
Fire Triangle Fuel Heat Oxygen. Life Safety –The primary goal of fire safety efforts is to protect building occupants from injury and to prevent loss.
USED THE FIRE EXTINGUISHER INDUSTRIAL CHEMISTRY CLASS : X SEMESTER : 1.
Safety mu.
Booster Hose Reel Location/Operations.
The King’s Cross Fire London, England 1987.
Environmental Safety Fire Safety
DC FITTINGS LOCATION & IDENTIFICATION
NFIRS 3 Structure Fire Module
Fire Hose, Nozzles, Streams, and Foam
Firefighting equipment
Fire Safety Training 1.
Environmental Safety Fire Safety
Environmental Safety Fire Safety
Environmental Safety Fire Safety
Fire Extinguishers 101.
Presentation transcript:

Pre-Fire Survey NAME HERE

Amidships Crane- 01 Qtr Deck Midships Zone: 3

Adjacent Spaces: FWD Fwd House: Damage Control Locker #1 C/M Office State Rooms Fan Room QTR Deck Office

Adjacent Spaces: Aft Aft House Medical Wardroom Sick Bay State Rooms Linen Locker Fan Room X-Ray room Medical Laundry Room

Adjacent Spaces: PT/STBD PT/STBD Sides Deck Lockers Cranes Lifeboats

Adjacent Spaces: Above Staterooms Open Space Fast rescue boats

Adjacent Spaces: Below Lower Class Mess Chill Rooms Purser’s Office Crane Electrical Panels, transformers, breakers

Fuel Loads: Class A: PFD’s Lifeboat lines and rescue boat covers Linen locker Mattresses, State room items, Personal effects Class B: Hydraulic fluid, Gasoline in rescue boats and power washer Diesel in Lifeboats #1, #2 Freon refrigerant gas Medical supplies Class C: Electrical circuitry in passage ways Crane electrical panel (Main deck) Class D: None Nearby *Other Hazards: Oxygen tanks in medical ward

Nearest Fire Stations Fire Stations F.S. #21:FWD House STRB Side (1 ½ inch adj. nozzle) F.S. #22:FWD House PT Side (1 ½ inch adj. nozzle) F.S. #23:Interior-Aft House PT Side (1 ½ inch adj. nozzle) F.S. #24: Interior-Aft House STRB Side (1 ½ inch adj. nozzle) F.S. #25:Aft House STRB Side (1 ½ inch adj. nozzle) F.S. #26:Aft House PT Side (1 ½ inch adj. nozzle) *All fire stations have a 50 ft. hose

Nearest Fire Extinguishers Powder (6)10 lb CO ₂ (2) 15 lb

Accessibility Primary Fire Stations Fire Stations 21 & 22 Secondary Fire Stations Fire Stations 25 & 26 Additional hoses may be used from interior Fire Stations 23 & 24

Size and Capacity

Shutoffs: Fuel Crane Shut Offs EOS Main Deck Electrical Panel Valve shut off at crane

Shutoffs: Ventilation

Shutoffs: Electrical Cargo Crane Electrical Shut Off 

Drains Scuppers are located along the port and starboard sides (Main deck to 04)

Exposures 02 FWD House Electrical Locker Medical Wardroom & Exam Room 01 FWD House Deck Lockers

Divisions: Deck and Deckhead Fwd A-Class 0 Aft B-Class 0 Bulkhead Class: A Requirements: A-0 60 min test no passage of flame or smoke 3mm thick steel and suitably stiffened Bulkhead Class: B Requirements: A-0 60 min test no passage of flame or smoke 1.5 mm thick steel and suitably stiffened

Divisions: Doors B-Class Aft (15) A-Class Fwd (15)

Divisions: Bulkheads A-Class 0 Fwd B-Class 0 Aft Bulkhead Class: A Requirements: A-0 60 min test no passage of flame or smoke 3mm thick steel and suitably stiffened Bulkhead Class: B Requirements: A-0 60 min test no passage of flame or smoke 1.5 mm thick steel and suitably stiffened

Fire Systems Fixed Fire Suppression Systems N/A Fire Detection Systems Smoke Detectors: FWD and Aft passage ways and all rooms Heat Detectors: N/A

Mid Ships Crane Pre-Fire Survey