CONSTRUCTION & FINAL ESTIMATES ISSUES. Final Estimates Issues  Prep & Doc Manual-Updates  Review & Admin Manual-Updates  Other Final Estimates Issues.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Specifications
Advertisements

Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
CONTRACT CLOSEOUT NORTH REGIONAL CONTRACTING OFFICE 13 January 2010.
ASPHALT PRICE ADJUSTMENT PRICE ESCALATION IN THE 21 ST CENTURY.
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
Section Cross Slope District 1 Your logo here.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.
BHSestimator for Windows
QI Usage Requests: Part 2 Managing, Approving & Ordering.
Event Reconciliation Step – by – Step Instructions For U.S. Managing Directors.
FINAL ESTIMATES ISSUES
Finance & Administration Quarterly Update Business Affairs Update April 26, 2010.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
Division of Housing & Community Development
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Certification & Payment March 2, Outline Rules of Payment Certification and Payment by Program Documentation Cost Analysis Spreadsheet.
Guide to using the myNATE website
OneOffice has provisions to add Pay Items for modifications to the Contract by Supplemental Agreements, Change Orders and for work covered by Standard.
State Aid (SALT) prepares the Federal Agreements and the Amendments for  Force Account (FA)  Right of Way (ROW)  Preliminary Engineering (PE)  Construction.
ONE BUSINESS SYSTEM FOR BROWARD SCHOOLS Budget, Finance & Procurement Elluminate Session.
2002 FDOT/FTBA Construction Conference
Local Agency Program General Information 1. Local Agency Program (LAP) is a re- imbursement program 2. Each Invoice to FDOT should only include one.
Education Service Center Payroll Time Sheet Instruction Presentation
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
MATERIALS ON HAND Standard Specification allows for payment of materials on hand (MOH) upon contractor’s written request. See page 91 of the 2014.
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
Quantities 2 Plans Prepared by Heath Bielefeldt Wisconsin Department of Transportation
9/2/20151 Education Service Center Region 10 Payroll Time Sheet Instruction Presentation
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Made By:. This tutorial makes the assumption that you have already downloaded the “WV State Employment Calculator” Excel file to your computer and saved.
Remarks will print on the completed form Generate Quantity Book Entry Generate Pay Quantity.
FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS. Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction.
RealProperty PLUS Commercial I Escalations and Passthroughs © 2009 Domin-8 Enterprise Solutions LLC. All rights reserved.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Closing Out a Federal Aid Construction Project Missouri Local Programs How to Close-Out a Federal Aid Construction Project.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
Allen Hughes State Materials Office
LESSONS ENTREPRENEURSHIP: Ideas in Action© SOUTH-WESTERN PUBLISHING Chapter 2 WHAT SKILLS DO ENTREPRENEURS NEED? Communication Skills Math.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
District Operations Contracts Office / Final Estimates Jennifer Taylor Steve Lange John Burnette.
Contract Training Class I
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Priced Proposal Training October/November 2015 DEPARTMENT OF TRANSPORTATION.
3 - 1 Holding The Contractor to 105% of the Target Spread Rate!
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Measurement and Payment
Welcome to the Pensionable Pay Workshop Heather Page and Sue Merrett.
EIRB Review Guide For Committee Members Version 01/05/
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Submitting a Responsive Response Packet & Bid Waste Water and Water Treatment Chemicals ITB# CWCH.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
CONVEYOR IDLERS CORP 3340 Financial Requirements Presented by: Commercial Finance Date: Thurs 22 October 2015.
April 29, 2014 WELCOME!. Tips & Tricks Interface & View.
PROCURE TO PAY REPORTS April 2016 Cindi Stinebaugh.
CORP 2987: Vehicle Accessories Financial Requirements Presented by: Commercial Finance.
MEDUPI Catering PS(M)(R)2012 / AB /01: Financial Requirements Presented by: Commercial Finance Date: Thurs 11 Sept 2014.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
Payments Report Verification and Request March 2017
Create a PO-Based Invoice
Acceptance Process for Manufactured Products by Certification:
Administrator of Construction Todd Wilson Senior Project Manager
School choice: How it works
Presentation transcript:

CONSTRUCTION & FINAL ESTIMATES ISSUES

Final Estimates Issues  Prep & Doc Manual-Updates  Review & Admin Manual-Updates  Other Final Estimates Issues  Specifications Changes  Process Review Findings  Specific Questions!  Streamlining Final Estimates  Streamline Contracts

What’s New? Updates to the Prep & Doc Manual

Prep & Doc Manual Continued

Automated Fuel Report in SM Manual calculations Now automated with the new system, Must still enter manually for line item adjustment in site manager. Instructions available in the Prep & Doc Manual. 3 pay items 1. LS Clearing & Grubbing 2. Steel (LS)and 3. Optional Base (black option only).

Automated Fuel Report in SM, Continues

Prep & Doc Manual Continued

What’s New? Review & Admin Manual

Review & Admin Manual Continued…

Specifications….. What’s New

Specifications

Example (1) Test Pile Concrete Test Pile Authorized Length 125' ITEMQUANTITY Actual Piling Dlv’d.125' Pre-forming 30’ Set-Checks 4 within 1 Working day Redrive 0 Splice Length 25' Splice 1 Driving of Splice 1 Cut-Off 1 How Do we Pay for this? 25’ Splice Splice (Driven) 125‘Test Pile 3’ cutoff

Example (1) Test Pile (Solution) Concrete Test Pile Authorized Length 125' ITEMQUANTITY Actual Piling Dlv’d.125'125‘ 9’ 0 Pre-forming30’ Set-Checks 4 within 1 Working day Redrive0 Splice Length25' Splice1 Driving of Splice1 Cut-Off1 Test Pile = 159’ 25’ Splice Splice (Driven) 125‘Test Pile 3’ cutoff 0 25’ 30’ 0 0 Production Pile = 30’

Example (1) Test Pile Concrete Test Pile Authorized Length 140' ITEMQUANTITY Actual Piling Dlv’d.140' Pre-forming 0’ Set-Checks 4 within 1 Working day Splice Length25' Splice1 Not Driven Driving of Splice0 Cut-Off0 How Do we Pay for this? 25’ Splice Splice 140‘Test Pile Cutoff Elevation

Example (1) Test Pile (solution) Concrete Test Pile Authorized Length 140' ITEMQUANTITY Actual Piling Dlv’d.140'140’ 0’ Pre-forming 0’ Set-Checks 4 within 1 Working day Splice Length 25' Splice 1 Driving of Splice 0 Cut-Off 0 Test Pile =140’ 25’ Splice Splice 140‘Test Pile Cutoff Elevation 25’ 30’ 0’ Production Pile = 55’

Other F.E. Issues Plan Quantity Measurements Designer Quantities Only Errors/Field Revisions measured Districts /Process Reviews Why Are we duplicating the work?

What to Measure? Example On this Project, Designer missed a Turnout at Station on the right side of the main roadway. The Pay Item Is Turnout Construction (a Plan Quantity Pay Item) This is a Plan Error, so how do we measure and document this?

Work Example Using the information provided on the slide and the handout (Form ) Please sketch the turnout with dimensions, Show date, time and person taking measurements /calculations. Calculate total Area to the nearest Square Yard. All dimensions are in linear feet.

Work Example (Plan Quantity Error) Area of Trapezoid = [(a + b) ÷2]h = SF Area of Rectangle = ( b X c) = SF Area of Square = ( c X d) = SF Area of ¼ of Circle = (πr 2 ÷ 4) = SF a = 24’ b = 28’ c = d = 12’ r = 12’ π=

What’s New…continued Unpaid Bills Building New Program System User Friendly Completed by 10/2012 approximately.

FYI

How would you pay for the following?

FINAL ESTIMATES ISSUES Bituminous Adjustments Reminder:  More than 365 days or 5000 Tons  Added Polymer PG –Bit Adjusted began on Contracts Let January 2007 and forward and using Polymer Index for adjustment  Added AC Permeable Base, adjustment using AC index; for Contracts let July 2010 and forward, also for on-going projects.

Bituminous Adjustments What do we look for? Contract Letting date Correct Index Plugged in How to spot check a certification/worksheet sheet Hands on problem

Bituminous Adjustments Example Job let March 2009 Asphalt certification April 2010 Total Tons AC 3000 Extra Gallons ARMI 350 Total Tons Polymer 1500 Total Tons AC Permeable Base 1200 How to check for an accurate Worksheet or Certification?

LS/DB Bituminous Adjustment Example

This is one of the worksheet that the Contractor turned in

How do we spot check? 1. First check the Gallons 2. Check to see if the Contractor used the correct Indexes and the price index difference. 3. Check the Total Monthly dollar amount

Bituminous Example, continued….. How to check to see if we have the correct gallons for AC and Polymer? The formula for this is as follows: 6.25 X Tons X 2000 # /Ton = Gallons #/Gal Or to simplify: you could use a short cut, for the liquid weight of 8.58 #/Gal, the constant will be Gal/Ton Tons X X 6.25 = Gallons

Bituminous Example, continued… Tons of AC and 350 Gallons of ARMI The Contractor’s gallons =43, = Gallons Total AC To check for correct Gallons AC = 3000 Tons X X 6.25 = 43,706 Tons, and 43, = 44,056 Gallons …correct

Bituminous Example, continued….. The same goes for Polymer. Tons X X 6.25 = Gallons 1500 X X 6.25 = 21,853 Gallons, correct

Bituminous Example, continued….. For AC Permeable Base, the formula has a slight change. As follows: Tons X X 3 = Gallons Here we multiply by 3 instead of 6.25 (per Specifications) Gallons Permeable Base = 1200 X X 3 = 8,392 Gallons, correct.

Bituminous Example, Continued….. Checking the Indexes: 2009 (When Job was let) in March 2009 ; AC Price = Certification turned in- cut off April 2010; AC price= Both are correct (Where do you go to check the indexes?)

Fuel & Bit Index

Bituminous Example, Continued….. Next, check to see if the Price Index Difference is correct. How is this done? Per Specs: 5% of index at time of bid is ( X 0.05 = ) And = see notes April Index for AC is Therefore the Price Index Difference for AC = – = (this is correct)

Bituminous Example, continued….. The new total dollar amount is: 44,056 X = $19, The same calculations are applied to the polymer. Same for permeable Base except for calculating the Gallons you multiply by 3 instead of See Hands on Work problem attached:

Bituminous work problem # 1 This Conventional Project was let in March of You randomly picked out Contractor’s Worksheet No. 5 to check; period represents pay in Month of July You will need to check gallons, Total Gallons, Indexes (Current and Base), plus total dollar amount for AC, Polymer & AC Permeable Base.

Index 2011

Index 2012

Bituminous work problem # 1

Continue Problem # 1 orms.shtm orms.shtm Go to the above link to get the latest form on the Construction Website. Fill out the form with the information provided in your handout (handout includes Contractor’s Certification). Spot check this certification.

Streamlining The F.E. Process

2012

Streamline Contracts Goal of Streamline Contracts Specifications Final Estimates Process Final Acceptance DFEO Responsibilities - Closeout Manual Write Ups

Streamline Contracts Goal of Streamline Contracts Simplify Administration by selecting minor projects (All jobs under $2,000,000 with less than 2,000 tons asphalt) No change to plans No reduction in Inspection

Streamline Contracts Specifications Projects will be let as either LS or PQ How do you know you have a Stream Line Contract? SCOPE OF WORK - INTENT AND SCOPE SP SLLS SP SLPQ

Streamline Contracts Specifications … continued MEASUREMENT AND PAYMENT SP SLLS SP SLPQ

Streamline Contracts Specifications …. continued Pay adjustments; VERY LIMITED Lump Sum – overbuild and foundations 1.Prices provided in Contract - Tables 9-2 and Adjustments could be the Contract amount; up to 105% of the original Contract amount. Examples provided in the Prep & Doc Manual

Streamline Contracts Specifications …. continued Pay adjustments; VERY LIMITED Lump Sum – overbuild and foundations Continued…. 3.Failed Material: Remove/replace or leave in at no pay (FDOT discretion) For failures other than items listed in Section 9-2 on Lump Sum Projects; use the unit price as determined by using the six month State Wide Pay Item Averages. The dates will be the six months prior to the Letting Datesix months This will eliminate the need, in most cases, to process a SA/WO

Streamline Contracts Specifications ….. continued Pay adjustments; VERY LIMITED….continued Plan Quantity – Each item on this contract will be Plan Quantity No Fuel and Bit, no CPF, no Spread Rate/ Thickness Adjustments on PQ or LS projects.

Streamline Contracts Specifications …. continued Changed Verification Testing Frequency 120 – EXCAVATION AND EMBANKMENT 125 – EXCAVATION FOR STRUCTURES 160 – STABILIZATION 200 – ROCK BASE 346 – PORTLAND CEMENT CONCRETE  Verification testing reduced to ½ of the standard verification testing frequency All the above Specification changes will also be affected by the reduced standard verification testing frequency.

Streamline Contracts Final Estimates Process Typically the F.E. process is no different from other processes on regular projects with exception to the following:  1. Plan Quantity Projects Each pay item is Plan Quantity The Contractor will provide monthly & final Invoices Comp Book updated for plan errors or Engineer approved field revisions to the final pay quantity only.  2. Lump Sum Projects No change (1 LS Project, no pay items) Eliminated Tables 9-1 (deficiencies), and 9-4 (Quality).

Streamline Contracts Final Estimates Process …… continued What about…… Asphalt Tickets? keep in file with the PA, unless needed to support any quantity changes/disputes Material delivery tickets? Keep in file with the PA, unless needed to support any quantity changes/disputes. Lot submittal packages? will not be needed Asphalt cover sheets? will not be needed Asphalt QC and roadway reports? Keep in file with PA, unless needed to support any quantity changes/disputes Core out reports? Keep in file with the PA.

Streamline Contracts Final Estimates Process …… continued What about documents to support changes? Lump Sum Projects: for failing material left in place and not referenced in Section 9- 2, or in Tables 9-2 and 9-3; such as fencing: use the 6 month Statewide Pay Averages (use the 6 months prior to letting) Field changes: supported by appropriate measurements Plan Quantity Changes: Either party will need to provide justification Plan Quantity will not be revised based solely on a particular method of construction that the Contractor selects. Changes will be handled separately

Streamline Contracts Final Acceptance Project Administrator will need to do the following: 1. Upon Final Acceptance, send “Reminder Notice” of Section 9-8 to the Contractor, and copy in the DFEO 2. Also, with Reminder Notice Letter; PA will include Acceptance Letter* 3. No Offer of Final Payment to the Contractor on these types of Contracts 4. Submit F. E. Package to DFEO 5. Contractor needs to send Contract Documents and Final Invoice, listed in Section 9-8, directly to the DFEO.** 6. Final Invoice approved by Project Administrator

Streamline Contracts DFEO RESPONSIBILITIES Closing the Contract Review Final Estimates Package in accordance with Chapter 14 of the R & AM.* Review contract documents – Section 9-8 All documents & Final Invoice complete & approved** Pay Final Invoice Close project

Other Streamline PQ Concept Issues Plan notes added by design changing specifications: This should not happen. Contingency amounts being added to Plan Quantity Items: Same as above, this should not happen.  These issues need to stop, and if they happen, please report them to the appropriate person and bring it to the attention of the responsible party so that these errors do not recur.  Also, let the SCO know  Estimates Bulletin: Estimates Bulletin:

Streamline Contracts Prep & Doc. Manual Chapters Write-up Ch 7 – Final Measurement Ch 11 – Alternative Contracts Review & Admin Manual Chapter Write-up Ch 14- Post review Processing/Contract Closeout