3-1 Planning the Project. 3-2 If a Problem Occurs During a Project Is It Most Likely Due to: 4 A) Poor Execution 4 B Poor Planning.

Slides:



Advertisements
Similar presentations
MAINTENANCE PLANNING AND SCHEDULING
Advertisements

Key Concepts Planning Process Project Plan Work Breakdown Structure
Project Management 6e..
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Gu & Maher University of Sydney, October 2004 DECO2005 Monitoring Team Process.
Defining the Project Chapter 4.
MEM 612 Project Management Chapter 3 Planning the Project.
Modern Systems Analysis and Design Third Edition
Project Management: A Managerial Approach
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
Chapter 5 Project Planning
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Chapter 3: The Project Management Process Groups
HKU Faculty of Education1 Project planning Seminar 4 BSIM0011 Project Management.
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Project Plan Development
Part II Project Planning © 2012 John Wiley & Sons Inc.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
Advanced Project Management Project Plan Templates
S/W Project Management
Chapter 3 Project Activity and Risk Planning
Chapter 4 Defining the Project.
Defining the Project CHAPTER FOUR PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
Chapter 5 Sem I, 2003/2004Prepared by: Jafri Mohd Rohani1 Project Planning “ If you don’t plan for the project, you are planning for failure” “ Plans act.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
What’s a Project? AD642. Copyright 2011 John Wiley & Sons, Inc. Why the Emphasis on Project Management? 2 ❑ Many tasks do not fit neatly into business-as-usual.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Ch. 5: Project Planning Good Quote: Plans are only good intentions unless they immediately degenerate into hard work Lame excuses for not planning: Takes.
1 © The Delos Partnership 2004 Project Management Organisation and Structure.
DEFINING THE PROJECT CHAPTER 4.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
BSBPMG405A Apply Human Resource Management Approaches Apply Human Resource Management Approaches Unit Guide C ertificate IV in Project Management
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
The process of planning projects
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
1 Advanced Project Management Project Plan Templates Ghazala Amin.
Copyright 2009 John Wiley & Sons, Inc. Chapter 6 Project Activity Planning.
Project Management Chapter 3 Project. 6/5/ In Chapter 3: Planning the Project Project plan is a route map from project start to finish. Project.
PROJECT PLANNING AND SCHEDULLING
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 5 – Project Planning.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
Project Management in Practice Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
Project Management in Practice
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
3-1 Planning the Project Project Plan Project Plan.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
WEEK 3 Project Planning.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Planning the Project.
DEFINING THE PROJECT CHAPTER 4.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Monitoring and Information Systems
Project Management Process Groups
Effective Project Management: Traditional, Agile, Extreme
Presentation transcript:

3-1 Planning the Project

3-2 If a Problem Occurs During a Project Is It Most Likely Due to: 4 A) Poor Execution 4 B Poor Planning

3-3 Two Extremes 4 “Ready, Fire, Aim” 4 “Paralysis by Analysis” No planning Too Much planning

3-4 THE CONTENTS OF A PROJECT PLAN

3-5 Elements of Project Master Plan 4 Overview –brief description of project –deliverables –Milestones or significant events –expected profitability and competitive impact –intended for senior management 4 Objectives –detailed description of project’s deliverables –project mission statement

3-6 Elements of Project Master Plan continued 4 General Approach –technical and managerial approaches –relationship to other projects –deviations from standard practices 4 Contractual Aspects –agreements with clients and third parties –reporting requirements –technical specifications –project review dates

3-7 Elements of Project Master Plan continued 4 Schedules –outline of all schedules and milestones 4 Resource Requirements –estimated project expenses –overhead and fixed charges 4 Personnel –special skill requirements –necessary training –legal requirements

3-8 Elements of Project Master Plan concluded 4 Evaluation Methods –evaluation procedures and standards –procedures for monitoring, collecting, and storing data on project performance 4 Potential Problems & Required Project History –list of likely potential problems

3-9 THE PLANNING PROCESS

3-10 PM’s First Job 4 Understand the expectations that the organization has for the project. 4 Identify who among senior managers has a major interest in the project. 4 Determine if anything about the project is atypical.

3-11 Developing Invitation List 4 At least one representative from senior management. 4 Managers from functional areas that will contribute to the project. 4 Perhaps highly specialized technical experts.

3-12 The Launch Meeting 4 Senior Management Introduces PM 4 PM Chairs Meeting –develop general understanding of the functional inputs the project will need –may brainstorm the problem –may develop preliminary plan 4 Important Results –scope understood and temporarily fixed –functional managers understand their responsibilities and have committed to developing the initial plan

3-13 Sorting Out the Project 4 Hierarchical Planning Process –begin with project’s objectives –list major activities needed to achieve objectives (Level 1 Activities) –delegate level 1 activities to individuals or functional areas to develop list of Level 2 activities … –degree of detail should be same within a given level

3-14 The Project Action Plan 4 Project activities identified and arranged in successively finer detail (by levels). 4 Type and quantity of each required resource identified for each activity. 4 Predecessors and durations estimated for each activity. 4 Milestones identified. 4 Individual or group assigned to perform the work identified for all activities.

3-15 Using the Project Action Plan 4 Project Master Schedule created by combining milestones, durations, and predecessors –used to compare actual and planned performance 4 Use of Templates

3-16 THE WORK BREAKDOWN STRUCTURE

3-17 Simple Approach for Creating the WBS 4 Gather Project Team 4 Provide Team Members with Pad of Sticky- Notes 4 Team Members Write Down all Tasks They can Think of. 4 Sticky-Notes Placed and Arranged on Wall

3-18 A Partial WBS (Gozinto Chart) for an Annual Tribute Dinner Project

3-19 Basic Steps to Construct the Project Action Plan 4 Identify and arrange all activities in successively finer detail by level 4 List type and quantity of all resources required for each activity 4 Show activity predecessors and task duration 4 Show all project milestones following their predecessor activities 4 Identify individual or group assigned to perform activity and have ‘sign off’

3-20 A Linear Responsibility Chart

3-21 MULTIDISCIPLINARY TEAMS -- BALANCING PLEASURE AND PAIN

3-22 Integration Management 4 Traditional Method –Design Group Develops Prod./Service Base on Mktg. Input –Prototype Constructed –Engineering Tests Prototype –Transfer to Mfg. for Process Design –Distribution Channels Determined –Design Packaging/Mktg. Strategies etc.

3-23 Concurrent Engineering 4 Carrying out steps concurrently rather than sequentially –also referred to as simultaneous engineering 4 Key Advantages –helps minimize conflict across functional groups –reduces project duration

3-24 Interface Coordination -- Interface Management 4 Key challenge facing PM is coordinating work of different functional groups. 4 One approach is to identify and map the interdependencies between members of the project team.

3-25 An Interface Mapping of a Silicon Chip Design Project

3-26 A Coordination Structure Model for Project Management

3-27 The Design Structure Matrix 4 Traditional project management tools tend to focus on which tasks have to be completed in order for other to start 4 Another important question is what information is needed from other tasks to complete another task

3-28 Example DSM for Project with Six Activities

3-29 Modified DSM to Show Activities to Be Completed Concurrently

3-30 Comments on Empowerment and Work Teams 4 Participatory Management 4 Success of empowered teams depends heavily on how team program implemented

3-31 Advantages of Empowerment 4 High quality solutions 4 Avoid micromanagement 4 Team has accountability for part of project deliverable 4 Synergistic solutions 4 Tool for timely evaluation and feedback