Pull and Kanban in SAP.

Slides:



Advertisements
Similar presentations
Purchase Orders & Receivers Agenda Setup the PO Purchase Area Assign User to PO Purchase Area Enter some Purchase Orders Pull purchase orders into receivers.
Advertisements

Pull System Workshop THE GOAL: Directly link all processes - from the customer back to raw material suppliers - to improve responsiveness, shorten lead.
How to release MRP planned orders through OBPM MO/PO create and maintain through OBPM Jim Simunek
LS Retail NAV New Features -
What is New in Inventory & Purchasing? Presented by: Derek Kratz.
Consumption-based Planning
© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.
Chapter 12 Inventory Management
PLANNING ENGINE Presented by: Dave Parker Sr. Business Analyst.
Inventory Kanbans Automating the Replenishment Cycle
Chapter 9 Inventory Management.
19-20 November, 2008 | Copenhagen. Christian Rytt & Thomas Jensen Program Managers Microsoft Corporation NAV08.
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Kanban Purchasing.
1 Session 22 Planning and Scheduling JIT Operations Session 22 Planning and Scheduling JIT Operations John Striebich Copeland Corporation.
The Material Requirements Planning Process
Process Management and Control and Physical Inventory SAP Implementation
High Lights of SAP Business One for Manufacturing.
SAP R/3 Materials Management Module
Inventory and Purchase Orders. 2 Objectives 1. Activate the Inventory function 2. Set up Inventory Items in the Item list 3. Use QuickBooks to calculate.
Chapter 12 – Independent Demand Inventory Management
SAP Purchasing Prepared by Lavanya.M. Purchasing The R/3 System consists of a number of components that are completely integrated with one another. This.
Production Logistics and ERP
Supplier Consignment File Number Why Consignment 1.Reduction of expedites Less over time, airfreight, disruption to the factory 2.Smoother demand.
Production Planning Processes Theories & Concepts
Faster and Easier Record Entry with Custom Templates & Card Files Jim Simunek, Senior Consultant
Starter Kit. Starter kit Production : Cut operations receiving ECN (Eng. Change Notice) Auto copy to prod orders details Shop floor reporting Generic.
MRP: Material Resource Planning
Production and supply chain process MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution (cont.) Instructor: Richard W. Vawter.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
eOrders inventory ordering software! Introduction Use easy functions, letting you order products that you need automatically. Use easy functions, letting.
Order Policy Codes for use in MRP and AVP
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Inventory Transactions.
BMT WMS Models and Options Manager Using WMS MoM to build and manage a Builder’s Model & Option database.
Copyright 2011 John Wiley & Sons, Inc. Chapter 9 Inventory Management 9-1.
Inventory Management MD707 Operations Management Professor Joy Field.
MAPICS XA Cycle Counting in Materials Management Presented by John Grindley CISTECH -Senior Consultant
CRIBMASTER™ ADVANTAGE AUTOMATIC PURCHASING 1. CribMaster Advantage Support Options ftp.ecribmaster.com/pub Videos - ftp.ecribmaster.com/pub/documentation/videos/
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Conference ID: / Password:
Inventory Management The goal of effective inventory management is to “meet or exceed your customers’ expectations of product availability with the amount.
Operations Fall 2015 Bruce Duggan Providence University College.
Inventory Control. Meaning Of Inventory Control Inventory control is a system devise and adopted for controlling investment in inventory. It involve inventory.
Purchase Order Creation Manually or automatically With or without reference to other documents Data Documents: Purchase requisition, Purchase order, RFQ,
Ultriva User’s Conference 2012 Collaborative Planning and Execution Presented by Narayan Laksham.
Company File Setup and Maintenance Chapter 6. PAGE REF #CHAPTER 6: Company File Setup and Maintenance SLIDE # 2 2 Objectives Use the EasyStep Interview.
Introduction to Max-Min Inventory Control System
Login Screen The login screen provides you with a dashboard view of activities that need attention. Let’s start by creating a product by clicking the ‘Products’
 Andersen Consulting 2000 MM03 - Master Data in Purchasing & Contract November, 2000.
MRP (Material Requirement Planning) The main function of material requirements planning is to ensure material availability on time. MRP helps monitor the.
Inventory Chapter 3. PAGE REF #CHAPTER 3: Inventory SLIDE # 2 2 Objectives Activate the Inventory function Set up Inventory Items in the Item list Set.
Training Day 3 Product (Recipe) Tracking and Stock Level Analysis Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training.
Sap mm online training Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA
SUDEEP Technologies is one of the leading Training Company involved in providing SAP MM ONLINE TRAINING. Our Trainers are.
 TATA CONSULTANCY SERVICES MM - Inventory management.
The Material Requirements Planning Process
Chapter 22 Procurement Cycle and Documents
Inventory Levels.
FDFPLSCP4A Manage and schedule production
MRP: Material Resource Planning
MM03 - Master Data in Purchasing & Contract
Managing Materials Requirements Planning Course
Kanban Replenishment for All Types of Industries
Two methods to observe tutorial
Distribution Deep Dive
Two methods to observe tutorial
Implementing SPOs: How
Presentation transcript:

Pull and Kanban in SAP

Topics What is Pull and when do I use it Procurement Decision Tree Kanban Calculator SAP reports Fields eKanban/Reorder Point Setup

Purchase Pull System Pull systems establish strategically located “buffers” of parts within a process. Inventory (or part) replenishment is “triggered” based on consumption versus pushed based on net requirements. Manufacturing Strategic Buffer Supplier Lead Time 8 Weeks Process Lead Time 2 Weeks Customer Expectation 3 Weeks Replenishment Signal (Purchase Order) Consumption Supplier A pull system exists when a work center is authorized to produce only when it has been signaled that there is a need for more parts in a downstream (user) department. This implies no work center is allowed to produce parts just to keep workers or equipment busy. All movements and production are authorized by a signal from a downstream work center when it has a need for component parts. A primary payoff comes from discipline required to make the system work. Lot size reductions Limited WIP Fast throughput Guaranteed quality Part shortages are reduced and/or eliminated (reducing expediting) Total inventory is reduced through better mix (right sizing)

Pull System Design Drivers Pull is about Set Up Maintenance Demand is dynamic and changes over time Seasonality, ramp up/down, engineering changes, etc. drive need to resize Kanban quantities Need to review Kanban sizes at least quarterly Goal 1. Establish inventory control (Kanban sizing) 2. Stabilize process 3. Reduce inventory A primary payoff comes from discipline required to make the system work. Lot size reductions Limited WIP Fast throughput Guaranteed quality Effectiveness, then efficiency

Kanban

Coefficient of Variation? Coefficient of Variation (CoV) measures the variability of demand It is defined as the ratio of the standard deviation (σ) to the mean (μ) Used to determine if an item is a good candidate for pull Low variability: good candidate for pull High variability: poor candidate for pull CoV>=1.5 Push 1.0<CoV>1.5 Additional Data Required CoV<=1.0 Pull

Standard Deviation (Variation) CoV Example Weeks Demand A B C 1 25 30 2 40 3 4 5 6 70 150 7 8 9 10 11 60 12 Mean (Average) Standard Deviation (Variation) 0.0 25.0 58.4 CoV 1.0 2.3 Parts A and B meet the rule of thumb COV<=1 Part C has same average demand, but high variability

CoV alone does not always indicate a good candidate for pull

Standard Deviation (Variation) The Run Ratio Weeks Demand A B C 1 25 30 2 40 3 4 5 6 70 150 7 8 9 10 11 60 12 Mean (Average) Standard Deviation (Variation) 0.0 25.0 58.4 CoV 1.0 2.3 Run Ratio 100% 58% 17% The Proportion of Time a Part is Used or Sold A: 12/12=100% B: 7/12=58% C: 2/12=17% Frequency of Demand

Kanban Calculator

Kanban Calculator Helps determine good candidates for Pull Performs all of the calculations automatically Compares current situation vs. expected if part is converted to pull Calculates needed stocking levels (bin sizes) to maintain desired service level Requires Master Data integrity Fields can be manually adjusted in the calculator

Calculator Transactions ZMMR is the first transaction that is run. This transaction gives us the Usage data for the materials. MC.1 and MCBZ ZMMR ZMEV ZPIRN ZMEV is the second transaction that is run. This transaction gives us the master data for the materials. ZPIRN is the third transaction that is run. This transaction gives us the Supplier for the materials. MC.1 is the fourth transaction that is run. This transaction is used to get the 3 month average inventory and forecast data for the materials. PK18 PK18 is the last transaction that is run. This gives us the current Bin sizes for any materials currently on Kanban

Calculator Demo

Kanban Regular Inventory Consignment Inventory Kanban Internal Works with Production Orders for internally procured material between workcenters at a plant. External Works with purchased parts, auto-generating PO’s, and vendor replenishment. Regular Inventory Consignment Inventory

SAP eKanban Master Data Supply Area Person Responsible Storage Location Control Cycle Number of Bins Bin Quantity Replenishment Strategy In house Production External Source Stock Transfer Kanban Specific Vendor (if the vendor has multiple Ordering addresses) New Info Record

SAP eKanban External Procurement Step 1: Create Supply Area PK05 Step 2: Alter Material Master MM02 Step 3: Enter Materials into PK01 Step 4: Managing the eKanban board

Step 1: Create Supply Area PK05 First Transaction PK05 The supply area

Step 1: Create Supply Area PK05 Click New Entries to Setup Supply Area Information

Step 1: Create Supply Area PK05 Enter the Supply Area and description Step 2 Click drop down for Storage Location be sure to choose the proper area (thus must be an IM location) Step 3 Click drop down and select corresponding MRP controller code of the area

EP Step 2: Alter Material Master Enter “MM02” to alter the Material Master. Enter the desired Part Number and Plant Number on the following screens

EP Step 2: Alter Material Master Select “MRP1” tab Change MRP Type to “ND” You may want to create a special MRP controller for eKanban Items

EP Step 2: Alter Material Master Select “MRP 2” tab Enter desired backflush location that items will be received into. Enter Lead Time vendor has committed to.

EP Step 2: Alter Material Master In the “MRP 4” tab click “Organizational Levels” Key in the IM storage location you wish the items to drop into once received

EP Step 2: Alter Material Master Change this Field to 1 (must be excluded from MRP) and save. This is also accessible through the transaction MMSC

EP Step 3: Enter Materials PK01 Enter transaction PK01 to create Kanban control cycle

EP Step 3: Enter Materials PK01 Enter Material Number Enter Plant Number Enter Supply Area

EP Step 3: Enter Materials PK01 Enter Number of Kanbans Enter Kanban Quantity Enter “001” to issue PO’s and press “Enter”

EP Step 3: Enter Materials PK01 Enter Purchasing Org Enter Vendor # Leave Agreement field blank unless using Scheduling Agreement, then fill in Agreement # and Line #

EP Step 3: Enter Materials PK01 Kanban Indicator must be marked “X” for Sch. Agreements at the Line Item level

EP Step 4: Managing the eKanban board Enter transaction to view kanban Bin status and to process Kanban order.

EP Step 4: Managing the eKanban board Enter Plant Number and Supply Area

EP Step 4: Managing the eKanban board In this view you can see the status of Bins in the Supply Area. This is where the operators can Empty the Bin in order to create a Purchase order to replenish stocking level of the Bin. The initial status of the Bin is Wait”. There are several statuses that can be set. Check the legend to see. To set the Bin empty, Select both bins and click the “To Empty” button. Multiple Bins can be emptied at the same time.

EP Step 4: Managing the eKanban board When a Kanban Bin is emptied the Bin icon will turn red. A Purchase order will automatically be released.

EP Step 4: Managing the eKanban board To change a Bin status to anything other than empty or full, Right click on a Bin and select “Kanban correction.”

EP Step 6: Managing the eKanban board Double click a line. Select the desired status. If you are keying it to full, enter a qty. Once complete, select the “Status/qty” button.

EP Step 6: Managing the eKanban board To set to the “Full” Status manually, select a bin and click “To Full”. This will make a FULL MIGO_GR! So be careful. Also, the bin will automatically be set to Full once any partial/full Migo_GR has been posted against the PO.

EP Step 4: Managing the eKanban board To get any information about the bin, double-click on a bin. The PO can be altered by clicking the Replenishment button. The PO is also displayed here. The time the Bin status was changed is displayed in EST.

Triggering Kanban in SAP Two Ways to Trigger Kanban: Using the PK13N Transaction in SAP 2. Using the RF gun and Scanning the Kanban Label

SAP Kanban - Demand View SAP Transaction: PK13N Green Bin (FULL) = Bin is full or being used currently in production Red Bin (EMPTY) = Bin is empty (on order) Purple (WAIT) = Temporary status

Kanban RF Process 1. When a Kanban Bin is Empty, Scan the Barcode Card for the Empty Bin 2. Flip the Status Card to “On Order” BIN 1 BIN 2 BIN EMPTY

SAP RF Menu Using the RF Tablet, Select 6  3  1

Reorder Point/Min. Max. The reorder point ("ROP") is the level of inventory when a fresh order should be made with suppliers to bring the inventory up to a fixed level or by a fixed quantity. Reorder point quantity includes safety stock. The PO quantity depends on the lot size (e.g., fixed).

Settings Maximum Stock Level Fixed Order Quantity MRP Type = “ZR” Lot Size Key = “HB” – Replenish to the maximum stock level Maximum Stock Level: This is a required entry. It denotes the quantity of stock that may not be exceeded It calculates the Lot size using the following two Formulas and creates an order proposal using the greater of the two lot sizes calculated MRP Type = “ZR” Lot Size Key = “FX” – Fixed Order Quantity Fixed Lot Size: This is a required entry. It denotes the quantity that will be procured in the event of a shortage. If the amount of the shortage is less than the fixed lot size, it is the fixed lot size that is procured (and not the lesser quantity that is actually required). If the amount of the shortage is greater than the fixed lot size, a multiple of the fixed lot size is procured. The system creates several purchase order proposals for this purpose. Original Purpose of MRP: To manage inventory. Not intended for scheduling. MRP should not be fully “turned off . MRP is quite useful for dealing with the supply chain portion of the business; Lead time, safety stock, etc… Do you have MRP here? What do you use it for? Consolidate data? What parts of MRP do you keep? - Long term planning, keeps track of usage, consolidates raw material requirements. What parts of MRP do you turn off? - Daily management, production planning, and inventory management. Reasons not to turn off MRP: It’s contains the BOM and BOM structure, it is a useful tool for forecasting and planning. DO NOT BLINDLY TURN OFF MRP!!! It can be used for low volume items also…

Kanban vs. Reorder Point Does not include future demand Operator triggers orders Provides good visual control Shop Floor Ownership Forward Looking: includes spikes System-driven (MRP) orders BOMs MUST be accurate Purchasing Ownership

Questions