FDFPLSCP4A Manage and schedule production

Similar presentations


Presentation on theme: "FDFPLSCP4A Manage and schedule production"— Presentation transcript:

1 FDFPLSCP4A Manage and schedule production
Presented by: XXXX – Teacher XXXX – TAFE

2 Topic 1 Strategy and framework
Business relationships Relationships with internal departments Relationships with external organisations

3 Supply chain

4 Product life cycle phases

5 Level and chase production plans

6 Hybrid/combination production plan
Inventory built Inventory consumed Demand Production Schedule amount Volume Time

7 Schedule relationships
Forecasts Customer orders Manufacturing equipment Bill of material Equipment capacity Planning parameters Inventory levels Manufacturing staff Production schedule Purchasing Quality control External manufacturer Warehouse Transport Customer

8 Topic 2 Identify production requirements
Forecasts and customer orders Production priorities

9 Seasonality

10 Trend

11 Topic 3 Identify resource requirements
Bill of materials and stock levels Equipment and staff resources

12 Generic bill of material
Product A Sub Assembly Raw Material 1 Ingredient 1 Packaging

13 Bill of material

14 Material review using bill of material

15 Costed bill of material

16 Inventory calculation and shelf life
Item ABC1 Safety Stock 50 Order Quantity 200 Lead Time 2 days Date Receipts Issues Adjustment On Order Stock on Hand 1-Feb 100 2-Feb 50 3-Feb 200 4-Feb 250 5-Feb -20 130 Item XYZ2 Shelf Life 20 days Safety Stock 20 Lot Number Expiry Date Stock on Hand 108 15-May 16 115 20-May 40 120 25-May 80 125 27-May 20

17 Inventory review

18 Routing and load Capacity 100 hours Overload Routing for Item 467215
Description Mix Ingredients for 2 hours Set Up 1 Hours Run Time 2 Work Centre Line TY Capacity 100 hours Overload

19 Topic 4 Develop the production schedule
Planning methods Constraints

20 MRPII Hierarchy Forecasts and customer orders Business plan
Sales and operations planning Capacity Master production scheduling Material requirements planning Purchasing Manufacturing execution

21 MPS Grid Item 908548 Lot Size 1000 Lead time 2 weeks 1 2 3 4 5
Lead time 2 weeks 1 2 3 4 5 Gross requirements 400 700 1100 1500 Scheduled receipts Projected available 500 300 800 Net requirements 1200 Planned order receipt 2000 Planned order release

22 MRP Grid

23 Enough material to meet plan?
MPS & MRP review Forecast Customer Orders Master Production Schedule Plan covers demand? No Yes Material Requirements Planning Enough material to meet plan? No Yes Review Resource Constraints

24 Reorder point and Min Max System
Lot size Stock on hand Order arrives Reorder point Order arrives Lead time Order quantity Safety stock Maximum stock Order placed Stock on hand Minimum stock Lead time Order placed

25 Schedule finalisation
Second Pass Schedule after MPS & MRP Review Schedule finalisation Enough capacity? Yes No Budget available? Yes No Set up issues resolved? Yes No Storage Issues resolved? Yes No Shelf Life Issues Resolved? Yes No All issues resolved? Yes Schedule Finalised

26 Topic 5 Communicate the production schedule
Schedule recipients Schedule format

27 MPS based schedule Item 908548 Lot Size 1000 Lead time 2 Weeks 1 2 3 4
Lead time 2 Weeks 1 2 3 4 5 Gross Requirements 400 700 1100 1500 Scheduled Receipts Projected Available 500 300 800 Net Requirements 1200 Planned Order Receipt 2000 Planned Order Release

28 Shop or work order

29 Schedule including capacity and load

30 Daily run schedule

31 Schedule by hour and shift

32 Visual schedule Pr Production schedule
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Line 1 Line 2 Line 3 Cleaning Maintenance

33 Topic 6 Monitor, review and adjust the production schedule
Dealing with variations Key performance indicators 33

34 Key performance indicators and targets
Production review Key performance indicators and targets Daily production meeting agenda Day xx 9am To Attend: Planner Manufacturing Manager Shop Floor Supervisor Purchasing Quality Warehouse/Maintenance as necessary Previous Day’s Output Previous Day’s Supply or Resource Problems Today’s Production Issues – Supply or Resources Tomorrow’s Schedule – any issues? Future Production Issues – Supply or Resources 34

35 Topic 7 Review the production schedule development process
Why review the production schedule process Continuous improvement of the schedule process

36 Schedule communication
Organisation boundary Organisation Management Overall Business Plan Customers Finance Human Resources Sales Marketing Manufacturing Management Research & Development Manufacturing Staff Purchasing Planner Quality TGA Warehouse/Distribution Centres Vendors/ Suppliers Outsourced or Subcontracted Manufacturers Transport WorkCover

37 Continuous improvement
Review Refine Refocus

38 Final Assessments Final assessments