FUTURE TACTICAL TRUCK SYSTEM (FTTS) Unit of Employment FCS Battalions Leader Development InstallationsInstallations DoctrineDoctrine TrainingTraining.

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements

DoD Logistics Balanced Scorecard Overview
1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
Maneuver Support Center of Excellence (MSCoE) Capability Development & Integration Directorate (CDID) Briefing to NDIA 14 March 11.
Advanced Manufacturing Technologies for Extending Microprocessor Availability Proactive Solution to Military Microprocessor Availability and Affordability.
M R. S T E V E K A R L / D A L O - S M M / D S N – / S T E V E N. K A R U S. A R M Y. M I L Deliver Logistics Readiness N O V E M B E.
1 U.S. Army Materiel Command NDIA 2004 Tactical Wheeled Vehicles Conference General Paul Kern.
Hybrid Electric Vehicles Tri-Service Power Exposition July 16, 2003.
PM AAVS Program Brief For 2005 Combat Vehicles Conference.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Supporting Expeditionary Aerospace Force (EAF) Getting lighter, leaner, and more responsive Col.
1 CISR-consultancy Challenges “Customer ask us what to do next” Keywords: “Customer ask us what to do next” From Policy to Practise The world is going.
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
Commodity Architectures and Army Research Challenges Workshop on Edge Computing Using New Commodity Architectures (EDGE) 24 May 2006 J. Michael Coyle Program.
Army Doctrine Publication (ADP) 3-37; and Army
Private Cloud: Application Transformation Business Priorities Presentation.
Readiness-Based Sparing addresses a challenge common across DOD
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Confidential 1 MAP Value Proposition.
John Gruetzmacher, Lockheed Martin
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
MPF(F) R&D MPF(F) Cargo Operations R&D Joint Seabased Theatre Access Workshop February Duck, NC Authors: Martin Fink, Arthur Rausch,
MAGTF Expeditionary Family of Fighting Vehicles (MEFFV)
Doug Bellomo April 6, NFDA Retreat & Conference “Risk MAP--Foundation, Transition, Integration” Risk MAP: An Update to NFDA.
Maj Richard “Krash” Krasner Directorate of Requirements Headquarters Air Force Space Command Air Force Space Command's Environmental Monitoring Requirements.
0 PM Metrics Briefing COL Stephen L. Rust PM ITTS 25 Mar 04.
Delivering Materiel Readiness “THE FUTURE OF ARMY LOGISTICS” March 2004 BG Charlie Fletcher United States Army Deputy G-4 NDIA.
Page 1 Designing for Health; A Methodology for Integrated Diagnostics/Prognostics Raymond Beshears Raytheon 2501 W. University McKinney, TX
Good morning ladies and gentlemen and welcome to the 2004 National Defense Industrial Association Combat Vehicle Conference and to Fort Knox, the Home.
Logistics Workforce Categories  Ms. Vicki L. Harris  DRC Contractor  Force Management and Organization Division  (A4RF)
1 Click to edit Master title style ROCKWELL COLLINS STEP VISION Jack R. Harris Director, Advanced Manufacturing Technology Rockwell Collins
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
Sustainability/Logistics – Transportation and Distribution Management (4b) Technology Enabled Capability Demonstration Alan Santucci
Performance Based Logistics 20 Nov Current Life Cycle Challenges High Weapon System Sustainment Cost Inefficient End-to-End Supply.
Keynote Address 2004 Tactical Wheeled Vehicles Conference
1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea January 2004 MANSCEN DPMO.
Import of New Security Environment Keys to Transformation: Exploit Technology Exploit DOD ability to integrate processes Result: JV2010 Vision shall.
2003 USSOCOM SOF CBRN CONFERENCE DECONTAMINATION UPDATE
Life Cycle Logistics.
Overview of Information and Signal Processing Program 24 January 2007 Liyi Dai, Program Manager Computing & Information Sciences Division Mathematical.
DoD Logistics Human Capital Strategic Planning Overview June 26, 2007.
1 Department of Defense Logistics Workforce Human Capital Strategic Planning 2015 FIPT 28 April 2006 Project Status Report.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
The Future of Veterinary Services. VS is evolving to meet the needs of 21 st century animal health.
CAPT RUSTY STILES Deputy Fleet Surgeon U.S. Fleet Forces Command
Munitions Executive Summit IOC - Transforming INDUSTRIAL POWER into MILITARY READINESS IOC - Transforming INDUSTRIAL POWER into MILITARY READINESS MG Joseph.
SCM is a set of approaches utilized to efficiently integrate suppliers, manufacturers, warehouses, and stores, so that merchandise is produced and distributed.
Lecture 2.1b: DoD Acquisition Process (SEF Ch 2)
Army National Guard NDIA Tactical Wheeled Vehicle Conference MG Gerald Minetti Deputy J4, Joint Chiefs of Staff 2 February 2004 Monterey, CA.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Sustainment Solutions Envelope (SSE) Sustainment Solutions Envelope (SSE) Presented at the Defense Standardization Program Conference, 16 March 2004.
ASA(ALT)/AAE Perspective The Honorable Claude M. Bolton, Jr. Assistant Secretary of the Army (Acquisition, Logistics and Technology) and Army Acquisition.
Capability Based Approach to Approach to Joint Warfighting Joint Warfighting Presented by: RDML Mark Harnitchek Vice Director, Joint Staff Logistics Directorate.
1 Defense Standardization Achievement Award Defense Logistics Agency Standardization of Fuels Equipment, Training, and Laboratory Operations Panel Presentation.
Army Reserve… Serving with an Army at War and Changing to Face the Challenges of the 21st Century Serving with an Army at War and Changing to Face the.
Connecting Prognostics to the Supply Chain Greg H. Parlier, PhD, PE Presented by Tom McLaughlin Valu-Lytics, Inc November 3, 2015.
Environment, Safety, and Occupational Health Opportunities in DoD Business Transformation May 4, 2006.
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
GORT Planning/Guidance Session with LTG Barclay
Performance Based Logistics
DoD Template for Application of TLCSM and PBL
Life Cycle Logistics.
NDIA Naval Log Conference “THE FUTURE OF ARMY LOGISTICS”
Seabasing…Enabling Operational Maneuver from the Sea
United States Army Chief of Transportation
Mission Command Center Excellence Directorate of Training
Defense Health Agency Industry Exchange J-6 I&O’s Enterprise Approach by COL Beverly Beavers November 08, 2018 Authorized Use Only Authorized Use Only.
“TWV: Fixing the current fleet while preparing for the future”
Steering Committee Brief to the DoD M&S Conference 2008
Perspectives on Transforming DT and OT Industry-Government Roundtable
MODULE 11: Creating a TSMO Program Plan
Presentation transcript:

FUTURE TACTICAL TRUCK SYSTEM (FTTS)

Unit of Employment FCS Battalions Leader Development InstallationsInstallations DoctrineDoctrine TrainingTraining SoldiersSoldiers OrganizationOrganization MaterielMateriel The Objective Force…Our Future Army Unit of action

FCS is a networked system of systems that will serve as the core building block within all maneuver Unit of Action echelons to develop overmatching combat power, sustainability, agility, and versatility necessary for full spectrum military operations. Future Combat Systems

75km Radius Area of Influence 150km Radius Area of Interest Richmond York Strasburg Dover CA FSB CA Washington, D.C. Stafford Edgewood Arsenal UA Area of Operations UA Area of Operations

250,000 TWVS IN SERVICE 40+ VARIANTS Current TWV Operational Shortfalls COMMONALITY INTEROPERABILITY IMBEDDED DIAGNOSTICS & PROGNOSTICS REDUCED ASL/PLL MAINTAIN PACE AGILE SURVIVABILE ORGANIC DEFENSE ADVANCED PROPULSION FLEXIBILITY DEVELOP ONE FAMILY FLEET TREMENDOUS LOGISTICS FOOTPRINT MULTIPLE LINES OF ASL/PLL VARYING DEGREES OF MOBILITY DEPLOYABILITY DEGRADATION SURVIVABILITY INEPT LIMITED DEFENSE HIGH DEGREE OF LOGISTICS SUPPORT AGING TECHNOLOGY LARGE CL III CONSUMER NO INTEGRATION INSIGNIFICANT COMMONALITY AMONG FLEETS INEFFICIENT BATTLEFIELD DISTRIBUTION PROCESS

From The Army G-4 uWe must challenge Defense Contractors and their engineers to design systems that meet tough requirements.  Self reporting  No vehicles that get less than 30 mpg  No repairables  No spares  No Systems w/o embedded diagnostics/prognostics uFuture systems must be built with ultra reliable components that require minimal preventive maintenance, and when maintenance is required repairs and services are easily and quickly performed.  No special tools  No external TMDE  MTBF > Duration of pulsed operations uWe may have to pay up front for such “Ultra-reliable” systems, but our future warfighting concepts depend on them. If systems don’t perform as advertised, there should be penalties. “Significant reduction in the logistics footprint and costs will occur when reliability, maintainability, And fuel efficiency are effectively balanced with Cost, Schedule and Performance”

 Deployable    Agile   Versatile   Lethal   Sustainable  The Need for an FTTS Transformational Changes Deployability Responsiveness Versatility Theme: “Reduced Logistics Footprint” Seamless Distribution System FTTS Load Handling System Modular Platform C-130 Roll-on/Roll-off w/load SBCT CoC Transportability Findings: >5 hrs to remove/Install S280 Shelters >1 hr to remove/install ring mounts Added an additional 45 Light Cranes (MHE) 144 TWVs required MHE for C-130 Long RSOI times TWVs C-130 deployable w/o loads Increased Range thru fuel efficiency and dynamic movement tracking Current TWVs: Less than 10% have Comms Capability Average range is 300 miles w/o refueling FTTS: Imbedded/Integrated C4ISR will provide 100% Comms with the Warfighter in the UoA Fuel Efficiency will increase range % allowing fluid distribution over greater operational distances (600 – 900 miles) w/no increase in tank capacity Fuel is 70% of the LogisticsBurden Truck Variants Variants MaterialHandlingEquipment DeliveryPlatforms InterfaceDevices   Responsive Survivable  

FTTS CONCEPTS DESCRIPTION: The FTTS-UV is a multi-purpose tactical truck family based upon a common chassis design sharing commonality with MSV. MISSION: Provides light TWV support to the Unit of Action (UA) and the Unit of Employment (UE) in terms of C2, system support platform, and unit mobility. DESCRIPTION: The FTTS-MSV is a multi functional, multi proponent single tactical truck family based upon a common chassis design sharing commonality with the UV. MISSION: Provides direct support to Unit of Action Brigades in terms of transportation and distribution of cargo, equipment, and personnel. Two fleets promote: Reduction in Logistics Footprint Commonality among fleets ~ ~ 200 FTTS-MSV Per UoA Responsiveness Agility Versatility Sustainability Deployability Survivability Lethality ~ ~ 150 FTTS-UV Per UoA

Threshold Capabilities Responsiveness Greater Fuel Efficiency % Dynamic Movement Tracking and Re-routing Greater Range 600 – 900 miles Integrated C4ISR Agility Higher Mobility Rated Speed: 50% increase Must be able to go where FCS goes and bypass built up Areas to deliver support Versatility Advanced Load Handling Interchangeable/Intermodal Operation On Board Power & water Generation Deliver integrated, common, formed Packaging Sustainability Reliability – MTBF > duration of Pulsed Operations Maintainability – Self-reporting, no special tools, No TMDE, and No Spares Deployability C130 Roll on/Roll off w/load Ready to support off the ramp Without vehicle preparation or Transportability waivers Lethality ORD Starting Point Survivability Reduced Emissions and Signature Designed upfront to provide time definite and assured delivery

Current Platforms Technology Roadmap uMATURE TECHNOLOGY INTRODUCED AND VALIDATED ON CURRENT PLATFORMS uOPEN SYSTEMS TECHNOLOGY DEVELOPMENT – “SYSTEM OF SYSTEMS” uEFFECTIVELY INTEGRATE OBJECTIVE FORCE CONCEPTS uPULL FORWARD FTTS TECHNOLOGY INTO CURRENT PLATFORMS OBJ FORCE HORIZONTAL TECH INSERTION FTTS FCS

FTTS Technology Strategy FTTS Technology Strategy Build Partnerships Develop & Demo Technology Integration & Eval thru M&S Prototype Development and Test uLeveraging of technology critical uNo one source has all the answers uNo one program has all the resources uCollaborative environment the key enabler AKO ACE ( Advanced Collaborative Environment)

Future Tactical Trucks Dilemma Future Tactical Trucks Dilemma FY03 FY04FY05FY06FY07 ABC ACTDSDDPRODUCTION 60% Solution80% Solution Tech Insertion Over time

FTTS ACQUISITION STRATEGY FTTS ACQUISITION STRATEGY uWill be initiated with an Advanced Concept Technology Demo  Prepare industry  Refine requirements uProgram staged to follow in step with the FCS Program  Enable the insertion of FCS technologies uConcept & Technology Development effort predominately Modeling & Simulation  Focus on reduction of logistic footprint  Validate application of Objective Force infrastructure u System Development & Demonstration phase  First stage of phase features modeling and simulation to evaluate and refine contractor’s offerings  Second phase involves production and testing of prototypes

FY02FY03FY04FY05FY06FY07FY08FY09FY10FY11FY12FY13FY14FY15FY16 FCS Schedule Phase Concept and Tech Development System Development & Demonstration Production & Deployment MNS/MS A Approval FUE IOC MS C CTD Award MS B Approval MS CIOC FULL SCALE PRODUCTION LRIP FUE SDD FULL SCALE PRODUCTION ORD Milestone Schedule ACTD MS B Approval STATUS: Feb 03 – MAA/MNA Apr 03 – ACTD Proposal May 03 – O&O Sep 03 – ICD Apr 05 – CDD Aug 07 – CPD Aug 10 – FUE (MSV) FTTS-UV Schedule currently 4 years behind FTTS-MSV with procurement funding Beginning in FY12 Reduces Acquisition Reduces Acquisition Risk for the PM

Summary uLegacy platforms can achieve only a subset of required Objective Force capabilities uFTTS maximizes opportunities for Objective Force capability by leveraging 21 st Century Truck research investment uUnconstrained design potential uExisting programs schedule staged in step with FCS Program FTTS is not a Truck…... It is the Objective Force Sustainment System FTTS is not a Truck…... It is the Objective Force Sustainment System

Comments