Rigging Equipment for Material Handling Your Safety is the #1 Priority

Slides:



Advertisements
Similar presentations
F&T Inc. OVERHEAD CRANE SAFETY.
Advertisements

Rigging Hazard Awareness
Crane Rigging Slide Show Notes
1293 Airport Road Beaver, WV Phone: (304) Fax: (304) Crane Safety Vincent J. Giblin, General President.
Cranes and Slings Major Causes of Crane Accidents
Rigging Equipment Slings
Shipbreaking Module 4: Heavy Equipment & Material Movement
CFR Subpart H Rigging Equipment.
Presentation 3 - Crane Operations
Rigging Presentation.
General Rigging inspected prior to shift(s)
Cranes Safety M. Zaman Bhatti Manager HSE, National Refinery Limited
BLR’s Safety Training Presentations
MATERIALS HANDLING SUB-PART H Georgia Tech Safety and Health Consultation Program.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Safe Rigging Practices
Materials Handling, Storage, Use, and Disposal. Overview -- Handling and Storing Materials Involves diverse operations: Manual material handling  Carrying.
Materials Handling, Storage,
OSHA Office of Training & Education1 Cranes. 2 Major Causes of Crane Accidents Contact with power lines Overturns Falls Mechanical failures.
Copyright  Business & Legal Reports, Inc.
Materials Handling and
Round sling shall be removed from service if any of the following are visible:  Missing or illegible tag  Acid or caustic burns  Evidence of heat damage.
Moments of Inertia Polar moment of inertia – Used when calculating the torsion – Indication of resistance to torsion – Solid Shaft – J = π R 4 / 2 Area.
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Cranes and Slings 29 CFR and 184.
Crane and Hoist Training
Overhead Crane Safety.
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
Alstom International EHS Passport EHS Training Program Lifting Accessories and Operations AIEP-TM-9016-en-Rev
2.5.4 Student Book © 2004 Propane Education & Research CouncilPage Loading and Securing ASME Tanks Using Truck-Mounted Company- Owned Cranes Coordination.
Rigging Equipment Safety is the #1 priority. Rigging equipment Inspect rigging equipment:Inspect rigging equipment: Before each shiftBefore each shift.
Sling Safety.
BASIC RIGGING.
CRANES, SLINGS, & YOU They can do a lot of work 34.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
OSHAX.org - The Unofficial Guide To the OSHA1 Materials Handling, Storage, Use, and Disposal.
Safety Induction to the Lift & Escalator Industry Part 4b – Mechanical Handling Part 4b – Mechanical Handling.
Georgia Tech Safety and Health Consultation Program
Lifting Operations & Lifting Equipment. LOLER 98  Lifting Equipment must be of adequate strength & stability, as must the load itself  Lifting equipment.
Industry Fundamentals and Occupational Safety Unit 6
Cranes and Slings 29 CFR and 184
Rigging Equipment Safety is the #1 priority
Industry Fundamentals and Occupational Safety Unit 6
ACADs (08-006) Covered Keywords Rigging, hoist, crane. Description Supporting Material b.
Standard 29 CFR Part Sling and Lifting Devices Training.
Sling Load Capacity and Sling Angles
Wednesday, July 18, Wednesday, July 18, 2012.
Sling Safety (Level 1 Rigger). Objectives Be familiar with regulations regarding slings. Be familiar with regulations regarding slings. Understand safe.
1 Material Handling Module 11. 2Objectives After this module you should be able to – identify the most common material handling hazards – take the steps.
SAFETY IN MATERIALS HANDLING AND CONTINUAL IMPROVEMENT
CRANE OPERATIONS SAFETY. Crane usage varies In our facility we use cranes to move materials in the shop and in the yard. However, whether or not it is.
Cranes, Forklifts & Material Handling This month we are going to look at a basic understanding of the requirements for safely working with with cranes.
Materials Handling and Storage
Copyright © 2012 American Safety Management Inc. Crane and Hoist Safety.
Crane Fundamentals Lifting Safety BY - ALEX MATHEW HSE ENGINEER LAHOUD ENGINEERING CO.
Materials Handling and Storage
Wire Rope Inspection Look for:
Indoor Cranes— The Case of the Broken Sling
Rigging & Inspection Considerations for Industry
Safe Rigging Practices
Crane safety and inspections
Overhead and mobile crane safety
Slings and Rigging Overview
MAIN 220 Industrial Rigging
Crane safety and inspections
F&T Inc. OVERHEAD CRANE SAFETY.
Crane safety and inspections
Crane safety and inspections
Cranes and Hoists Standard 29 CFR Part
Click to start.. Click to start. Rigging for a safe lift SAFETY TALKS! for PowerPoint © MMIV Bongarde Holdings Inc.
Presentation transcript:

Rigging Equipment for Material Handling Your Safety is the #1 Priority 4/14/2017 Rigging Equipment for Material Handling Your Safety is the #1 Priority This program is to be used to ensure a safe working environment during lifting operations utilizing slings and other rigging equipment. This program applies to slings and rigging equipment used in conjunction with jib cranes, overhead shop hoists, boom trucks, truck hoists, and etc. to move heavy parts and equipment whether the lift is performed in the shop or field. This program does provide information on Alloy Steel Chain Slings, Wire Rope Slings, Metal Mesh Slings and Synthetic Slings. There are no specific training requirements for slings, but awareness level training is incorporated with rigging equipment for material handling. Inspections of slings for damages or defects is done by a competent person, but the re-certification of repaired or reconditioned slings must be done by a qualified vendor.

Safe working load Recommended safe load 4/14/2017 Safe working load Recommended safe load Mark custom lifting accessories Proof test to 125 percent Do not load rigging equipment in excess of its recommended safe working load. Special custom design lifting equipment shall be marked to indicate the safe working loads and shall be proof tested (by a qualified vendor) to 125% of their rated loads, prior to use. No homemade lifting devices shall be used unless it has been proof tested (to 125%) by a qualified vendor. Do you have any special “spreader bars” that was built in your local shop to lift parts, equipment or engines that are common to the region – has it been certified?

Rigging Equipment Define Rigging Hooks Shackles Eyebolts 4/14/2017 Rigging refers to the hardware and equipment used to safely attach a load to a lifting device. Hooks shall be removed from service when the hook is opened more than 15% at the throat. Hooks shall be removed when it is bent more than 10 degrees from the plane of the unbent hook. Ensure shackles and eyebolts are installed in accordance with the manufacturer’s recommendations. Ensure shoulderless eyebolts are threaded in at least 1.5 times the bolt’s diameter. Use safety hoist rings (I.e., swivel eyes) as preferred substitute for eyebolt whenever possible. Do not use eyebolts, shackles, or hooks that have been cut, welded or brazed.

Slings and Rigging Equipment 4/14/2017 Slings and Rigging Equipment Inspect before each use Additional inspections Remove from service Remove from work area Inspect and verify that each new, repaired or reconditioned piece of rigging equipment has been proof tested by a qualified vendor (look for the tag attached to the lifting device). If the rigging equipment’s certification tags are missing or destroyed then the rigging equipment must be removed from service until the equipment has been proof tested by a qualified vendor and tags replaced. Employees must visually inspect all rigging equipment prior to use and / or during use as conditions warrant. Damaged or defective rigging equipment must be immediately removed from service and tagged “Out of Service”. Slings, when not in use, must be removed from the immediate work area so as: 1) not to be a trip or swinging hazard, and 2) to protect the sling from jobsite hazards such as dirt, oil, grease, and not being walked or run over.

Sling and Rigging Inspection 4/14/2017 Sling and Rigging Inspection Daily, monthly and annual inspections - competent person Document once every 12 months Maintain records of inspections Besides the pre-use or daily inspections, monthly and annual inspections by a competent person are required by Universal Compression. A thorough examination must be performed monthly and documented at least once every 12 months. A record shall be made of the annual inspection stating the number of slings inspected, who conducted the inspection, the date of inspection, and whether any slings were found in a state requiring removal of service. These inspections are to be conducted, documented and files maintained at the regional office. The criteria for removal from service is described later in the program.

Slings general requirements 4/14/2017 Slings general requirements Don’t use knots Prevent kinking Balance loads Slings are not to be shortened with the use of knots, bolts or other makeshift devices. Sling legs that have been kinked must not be used. Slings in a basket hitch must have the loads balanced to prevent slippage.

Slings general requirements 4/14/2017 Slings general requirements Use padded slings Don’t shock load slings Watch your fingers Slings must be padded to protect form load’s sharp edges. Slings shall not be altered in any manner. Slings shall not be loaded in excess of their rated capacity. Slings shall not be shock loaded. Hands and fingers shall not be placed between the sling and the load while the sling is being tightened.

Inspect alloy steel chains based on 4/14/2017 Inspect alloy steel chains based on Frequency of sling use Severity of service conditions Nature of lifts made Experience from other slings In addition to other inspections required, a thorough periodic inspection of alloy steel chain slings in use must be made on a regular basis, to be determined on the basis of (A) frequency of sling use; (B) severity of service conditions; ( C ) nature of lifts being made; (D) experienced gained on the service life of slings used in similar circumstances. Welded alloy steel chain slings must have permanently affixed durable identification stating size, grade, rated capacity, and sling manufacturer. All rigging accessories used in conjunction with alloy steel chains must have a rated capacity at least to that of the chain.

Wire rope Safe working load Protruding ends of stands Don’t use knots 4/14/2017 Wire rope Safe working load Protruding ends of stands Don’t use knots Visible broken wires When selecting wire rope slings for rigging, one must determine the safe working loads by either charts in OSHA’s 29 CFR 1929.251 or referencing the manufacturer’s product information. To protect from sharp edges, always cover or blunt protruding ends of strands in splices on slings and bridles. Do not secure wire rope with knots. Wire rope must not be used if the total number of visible broken wires exceed 10% of the total number of wires, or the rope shows other signs of excessive wear, corrosion or defect.

Natural or synthetic fiber rope slings 4/14/2017 Natural or synthetic fiber rope slings Follow mfg. recommendations Don’t use knots 20 degrees below Zero to 180 degrees F When to remove from service All splices must meet the fiber rope’s manufacturers recommendation. Do not use knots to shorten the slings. Natural or synthetic fiber rope slings may be used in a temperature range from minus 20 degrees to 180 degrees without decreasing the working load limit. Natural or synthetic fiber rope slings shall be immediately removed from service when the following conditions are present: abnormal wear, 2) powdered fibers between fibers strands, 3) broken or cut fibers, 4) discoloration or rotting, and 5) distortion of hardware in the sling.

Synthetic web slings Uniform in thickness, no visible defects. 4/14/2017 Synthetic web slings Uniform in thickness, no visible defects. Visible color cords = dead sling “If you see red, the sling is dead.” Not good for service above 180 degrees F Markings on tag Slings must be uniform in thickness and have no visible defects. If the colored cords inside a web sling can be seen, the sling must be taken out of service. Remember the saying, “If you see red, the sling is dead.” All synthetic webbing slings shall have a permanently attached tag identifying the name of the manufacturer, the rated capacity and the type of material the sling is made of. If the certification tags is missing, then the sling shall be removed from service.

General The hoist or crane operator is responsible for the lift 4/14/2017 General The hoist or crane operator is responsible for the lift Lifting of personnel with slings prohibited Never go under a suspended load Use tag lines Moving the load The hoist or crane operator is responsible for the lift – every aspect: rigging, people and equipment. Slings are designed for the lifting of materials only, not personnel. When maneuvering a suspended load a) Never put any part of your body or allow anybody else to be under a suspended load, b) always use tag lines, c) keep load as low to the ground as possible, d) Suspended loads are to be kept clear of all obstructions and e) be cautious of power lines.

Rigging Only select rigging equipment that is in good condition. Defective equipment is to be removed from service and destroyed to prevent inadvertent reuse. The load capacity limits shall be stamped or affixed to all rigging components.

Rigging Remove from service for any of the following conditions: Nylon slings with: Abnormal wear. Torn stitching. Broken or cut fibers. Discoloration or deterioration. Alloy steel chain slings with: Cracked, bent, or elongated links or components. Cracked hooks. Shackles, eye bolts, turnbuckles, or other components that are damaged or deformed.

Rigging Wire rope slings with: Kinking, crushing, bird caging, or other distortions. Evidence of heat damage. Cracks, deformation, or worn end attachments. Six randomly broken wires in a single rope lay. Three broken wires in one strand of rope. Hooks opened more than 15% at the throat. Hooks twisted sideways more than 10 deg. from the plane of the unbent hook.

4/14/2017 Rigging Rigging a load Determine the weight of the load - do not guess. Determine the proper size for slings and components. Do not use manila rope for rigging. Ensure that shackle pins and shouldered eyebolts are installed in accordance with the manufacturer's recommendations. Ensure that ordinary (shoulderless) eyebolts are threaded in at least 1.5 times the bolt diameter. Use safety hoist rings (swivel eyes) as a preferred substitute for eye bolts wherever possible. Pad sharp edges to protect slings. ·  Remember that machinery foundations or angle-iron edges may not feel sharp to the touch but could cut into rigging when under several tons of load. ·        Wood, tire rubber, or other pliable materials may be suitable for padding.

Rigging Do not use slings, eyebolts, shackles, or hooks that have been cut, welded, or brazed. Install wire-rope clips with the base only on the live end and the U-bolt only on the dead end. Determine the center of gravity and balance the load before moving it. Initially lift the load only a few inches to test the rigging and balance.