PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05

Slides:



Advertisements
Similar presentations
Knots or lots! The Basics for Outdoor Education. The rationale Aside from serving as a line to dry your bathing suit after a dip in the lake or airing.
Advertisements

Knot Master Program.  Scouts can progress through the required knots, hitches, bends and lashings with a fun advancement program.  There are also decorative.
Ropes and Knots Skill Drills.
Basic Knots. Overhand Knot PROCEDUCE 1. Form an overhand loop and insert one end of the rope into the loop. Then tighten up the knot Uses  To stop the.
Ropework. Cavemen tied knots, so did the Incas of Peru who made knotted strings instead of written figures. They may be man’s oldest tool. Knots were.
® 1 Seamanship Chapter 6 Anchoring, Mooring and Rafting.
Three-Strand Eye Splice
ROPES State of Georgia BASIC FIRE FIGHTER TRAINING COURSE.
SEAMANSHIP CH. 4 MARLINSPIKE SEAMANSHIP
ROPES AND KNOTS Copyright© Delmar is a division of Thomson Learning.
Chapter 15 Ropes and Knots.
FIRE SERVICE Ropes & Knots IFSTA Ch. 6
ROPE WORK. 2 Terminology A.The end, or working end, is the part of the rope in which the knot is tied. The unused portion is called the standing part.
Firefighter III Module C Ropes.
Rappelling Techniques ALERT Cadet Alpha 3 rd California Jason Kim March
HARLAN R. DICKSON Division
Boating Skills And Seamanship 1 Copyright Coast Guard Auxiliary Association, Inc. Lines And Knots For Your Boat Chapter 11.
Seamanship Chapter 8 Marlinspike.
Knot Master Program Troop 509 Ham Lake, MN.
Ropes & Knots Ropes & Knots.
 Yonten Norbu  Samtse College of Education.  Definition  Types  Different types of knots  Uses  Demonstration  conclusion.
1.3.1a.
® Seamanship Chapter 8 Marlinespike. ® Slide 2 of 35USPS® Seamanship Learning Objectives  Marlinespike seamanship encompasses the art and science of.
Proof Coil Chain A welded link chain. Chain size is designated by the diameter of the steel used in making the links (e.g.. 3/16"-3/4"). Made from low.
SABOT Standardized Auxiliary Boat Operations Training Ninth District - Eastern Region COMO. Lew Wargo, Sr. DSO-OP/CQEC 03 APR 2015 MARLINESPIKE.
Ropes & Knots Ropes & Knots.
Ropes and Knots 1. Introduction Rope is one of the most important and routinely used tools in the fire service. In this chapter, you will learn: How to.
LOOP KNOTS: A loop knot, like a hitch, fastens a rope to another object. A loop knot may be tied in the hand and then placed over the object, while a hitch.
14/2010 CHAPTER 4. Line Construction Braided Line Laid Line Webbing Reprinted with permission from Knots, Slices and Line Handling: A Captain ’ s Quick.
MSC-132: Introduction, Plain Whipping, Loops, Turns & Hitches This presentation is designed to be used as a study companion to lectures, labs and handouts.
Tujuh Bukit Project Indonesia Field Response Team Knots
FVSPS Sail Course, Class 6. What Are We Doing Today? In Class Today: - 10:00 OTW Today Briefing (Brian) - 10:10 Last Week’s OTW, Discuss (Brian) - 10:20.
Instructors: George Crowl
Industry Fundamentals and Occupational Safety Unit 6
ORD-6 OrdinaryMarlinspike Instructors: George Crowl.
Industry Fundamentals and Occupational Safety Unit 6
Ropes and Knots Skill Drills.
APP-6,7 Apprentice Marlinspike / Boat Handling Instructors: George Crowl.
SABOT Standardized Auxiliary Boat Operations Training
CHAPTER 15 Copyright © 2007 Thomson Delmar Learning 15.1 Ropes and Knots.
LESSON THREE OPERATING YOUR BOAT SAFELY
Whipping 0401 (seamanship).
L.B.F.D. TRAINING DIVISION. OBJECTIVES ABILITY TO TIE KNOTS 1-8 ACCORDING TO GRADING CRITERIA. IDENTIFY THE ROPE WEAKENING CHARACTERISTICS OF KNOTS 1-8.
Knots and Splices Toronto Brigantine Grade II Most of the images in this lecture are from the following eBook (copyright expired) Knots, Splices and Ropework.
Sail Course ® Section 20, Marlinespike Seamanship.
Basic Boat Handling 1. Can undertake appropriate pre-start checks on the engine and hull. 2. Can start and stop the engine. 3. Can steer the boat ahead.
CANADIAN COAST GUARD AUXILIARY - PACIFIC TOWING OPERATIONS SAR Crew Manual Chapter 8 CANADIAN COAST GUARD AUXILIARY - PACIFIC Jun 2010.
Belay-Climb Test Review.  Feet must stay below Red Line (4 ft.)  Have a spotter when necessary.  Never go upside down.  “SOS “ when falling off wall.
What is the first requirement / expectation of everyone who sails in the ships of the U.S. Navy? NS3 Naval Skills Deck SeamanshipUnit 3 Chapter 1.
Goddard Sailing Association Hunter 27 Cruiser Qualification Course 1.
Module 3 – Naval Skills Chapter 1 – Deck Seamanship Section 2 – Handling Fiber Line.
Roofing fall protection
Basic Boat Handling 1. Can undertake appropriate pre-start checks on the engine and hull. 2. Can start and stop the engine. 3. Can steer the boat.
2010 University of Scouting Pioneering Class
Ropes and Knots (Fire Fighter I)
ANCHORING & MOORING An anchor is used to attach a ship to the seabed at a specific point. The primary function of an anchor is to hold the ship againts.
Seamanship: Rigging Terms / Orders
Seamanship: General Ropework
Basic Knots.
Knots and Lashing Ropes Natural Fibre Rope Synthetic Fibre Rope
Knots.
Derigging a CL16.
Proof Coil Chain Rope and Chain-Chains, Lashing Straps, and Accessories Image: ChainProofCoil.jpg Height: 46.2 Width: 120 A welded link chain. Chain.
Knots.
Marlinespike Seamanship
Seamanship: General Ropework
Hillgrove Outdoor Education Knots
Rigging Certification -- Operator
CSK015 Knotting Crib Cards – Print 10 x 15 cm Laminated
basic scout knots 2019 Chief Seattle PTC October 19, 2019
Presentation transcript:

PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011

Seamanship Seamanship is covered by three fundamental principles 1. Order - every to be kept in its place so it can be easily found when required 2. Redundancy - critical systems doubled up - actions and procedures double checked 3. Habit - ingraining habits e.g. lines are coiled, closed loop communication is used, and correct helm orders are used

Ropes

Types of Rope Lay Cable laid (Left hand) Hawser laid (Right hand) Plaited Braided

Types of Rope Lay Cable (Left Hand) Laid In this example three right laid ropes (top) are turned into the cable laid rope (bottom).

Types of Rope Lay Hawser (right hand) laid

Types of Rope Lay Plaited

Types of Rope Lay Braided

Components of a Line

Parts of a Line

Rope Materials

Rope Materials Ropes may be made out of many materials. Natural fibres - sisal, manilla, hemp, and cotton - not generally used on rescue vessels Artificial fibres - polypropylene, nylon, polythene, polyester and certain proprietary materials.

Rope Materials There are other sorts of artificial fibre rope such as Kevlar, Bahamas, Tendon, Kapron, which have their own properties.

Polypropylene The most common rope in use is polypropylene. It melts at 160 degrees celcius and therefore has the lowest melting point of the artificial fibre ropes. If you are putting a wet polypropylene rope under tension, if you see rising steam from it, stand back as it could be about to break. It is light and it floats. It is susceptible to ultra violet damage.

Line Handling

Line Handling Line handling is carried out by the crew. This involves: 1. crew safety in their part of the vessel 2. ensure that the docking/undocking plan is clear 3. inspecting lines are in good condition 4. stow away loose gear and coil lines 5. keep colleagues safe by warning of bights and lines under tension

Line Handling 6. keep lines clear of the propeller and warn coxswain when they are not 7. give feedback on progress of operations involving lines

Coiling a Rope

Samson Posts When making fast a line on a samson post, first make one full turn, before starting belaying the line around the staghorns.

Samson Posts On turning up on a samson post or tow post, locking tucks are not to be used.

Heaving Lines

Heaving Line Use Ensure line’s bitter end is secure to own vessel. The best way to prepare a heaving line is to make a small diameter (18”) coil. Once enough line has been coiled, split the coil in two, holding half the coil and heaving line knot in the right hand, and the other half of the coil in the left hand.

Heaving Line Extend both arms to your right, look at where you are throwing. Swing the heaving line coils anti clockwise and upwards at about 30 degrees, releasing both parts of the coil when on line with the target.

Heaving Line

Line Inspection

Line Inspection All lines should be checked regularly along their length for: 1. Broken fibres, cuts, abrasion, unlaying, reduction in diameter, all of which mean a reduction in strength. 2. Powder within the lay which can be a sign of excessive wear. 3. Absorption of oils or chemicals that may adversely affect the rope.

Signs of Overload during Use Warning signs 1. Groaning, creaking or popping sounds 2. Rotating and/ or stretching 3. Shrinking in diameter 4. Loss of shape 5. Yarns or fibres (and ultimately strands) breaking and peeling 6. Steam rising from a wet rope (polypropylene)

Dangers of Overload The biggest danger with overload of a artificial fibre lines, where they have a larger capacity for stretching or shock absorbency, when they do break they will return instantly to their unloaded length, causing a severe whip lash. This can injure an inattentive crew member.

Danger Zone

Knots

Knots All good knots should 1. Be easy to tie 2. Be easy to undo after being loaded 3. Be safe when properly used Knots in ropes will reduce the breaking strain of that rope in way of the knots, by about 50%

Reef Knot Used for joining two ropes of the same size together Not to be used for lines under load

Clove Hitch Perhaps the most widely used of the hitches is the clove, or ratline, hitch. It is especially practical for making a rope fast to a pole or similar object.

Round Turn and Two Half Hitches This is a very useful knot for tying a rope to a post. It can be tied in a rope that is under tension making it useful for boat mooring

Figure of Eight This knot is best when acting as a stopper knot, tied at the end of a line to stop it being pulled through an eye.

Bowline The Bowline is by far one of the best-known and oft used knots. Used to form a fixed loop at the end of a line, the Bowline can be tied with one hand, does not jam and is reasonably secure.

Sheet Bend The sheet bend is very fast to tie and when slipped, is one of the easiest bends to work with. It is also useful when joining two ropes of different diameters. In this example the red line would be the smaller diameter.

Mooring and Securing the Vessel

Mooring Lines Section 5 Lesson 2 99-07-16 Name: Mooring Lines

Mooring Lines When one end of the mooring line is made fast on the vessel, and is to be a slip rope, the line is to be passed under the object on the dock before returning on board and making fast.

Cleats Mooring rope should be belayed on a cleat, without use of any locking tuck

Anchors

The Anchor Shank Fluke Stock Crown Section 5 Lesson 4 99-07-16 Name: Anchor parts Fluke Stock Crown

The Anchor Shank - aids in setting and weighing the anchor Flukes - dig into the bottom to increase holding power Shank Section 5 Lesson 4 99-07-16 Name: Anchor parts Fluke

The Anchor Crown - the swivel between flukes and shank Stock - the part of the anchor to discourage toppling or turning of the anchor Section 5 Lesson 4 99-07-16 Name: Anchor parts Stock Crown

The Anchor At the top of the anchor shank, there is a swivel and then a length of chain, normally the length of the boat, to which is attached the anchor line. The chain adds weight to the anchor and also takes the chafing of the sea floor. Section 5 Lesson 4 99-07-16 Name: Anchor parts

The Anchor Once the chain or rode is shackled to the anchor, the shackle must be moused with a wire to stop the pin coming out. Section 5 Lesson 4 99-07-16 Name: Anchor parts

The Anchor

Anchoring Anchoring is a process with steps that cannot be skipped. If you wish to do it right the first time, double check your gear. The bitter end of the anchor line must be tied to the boat, generally with a weak link - a line of lesser diameter and strength to the rode. Know the type of sea floor where you are intending to anchor - rocks, sand, or mud.

Anchoring 1. Check the anchor and chain are made fast to the line, and line is made fast to the boat. 2. Approach spot slowly, and when over the spot, go astern to take off headway. 3. Start lowering the anchor and when starting to move astern, lower the anchor to the bottom.

Anchoring 4. Take a turn around the post, and take a little weight to dig in the anchor and then lower the rest of the line to the required scope. 5. Go neutral and stop the engines. 6. When weight comes off the chain, you are anchored. 7. Make a note of the position, and periodically check that position.

Weighing Anchor 1. Start engines, and go slowly ahead to take weight off anchor and line. 2. Pull in the slack of the line. 3. When over the anchor, lift remaining line, chain and anchor into the boat. DO NOT allow boat to overshoot, and come ahead of the anchor and allow line to get into the propellers.