Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.

Slides:



Advertisements
Similar presentations
Paving Potpourri 2015 Spec Changes and More! Bob Dyer Assistant State Construction Engineer WAPA Joint Training March 2015 Lynn Peterson Secretary of Transportation.
Advertisements

DIVISION 5 SUBCOMMITTEE OCT 2014 Update. The Washington Chapter is one of 67 local chapters in the US and Canada which make up the American Public Works.
2014 Washington Asphalt Conference “Specification Update & Initiatives” Joe DeVol Assistant State Materials Engineer State Materials Laboratory.
Long-Life Pavements Concepts and Lab Testing
HMA permanent deformation study: Progress report to the RPF 7 May 2008 Erik Denneman.
Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic.
LLP HMA Pavements Inertial Profiler Prebid Meeting Solano A0104 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement.
HMA Design (Surface) The surface course is the layer in contact with traffic loads and normally contains the highest quality materials. It provides characteristics.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
In the United States, there are an estimated 250 million registered vehicles traveling on four million miles of public roads. With such a large volume.
Presented at: Rutgers Asphalt Paving Conference March 8, 2011 Presented by: Eileen Sheehy, P.E. Manager, Bureau of Materials NJDOT.
Caltrans Changes SECTION 39 “Hot Mix Asphalt”
Development and Application of the Asphalt Mix Performance Tester Ramon Bonaquist, Ph.D., P.E Advanced Asphalt Technologies, LLC.
1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.
Advanced Asphalt Technologies, LLC “Engineering Services for the Asphalt Industry” WHRP Project HMA Fatigue and Low Temperature Properties to.
EDC Summit Technology & Innovation Plenary 1. The Innovations Warm Mix Asphalt (WMA) Precast Bridge Elements Geosynthetic Reinforced Soil Safety Edge.
PPTG Thin Overlays Task Group (TOADS) Team Overlay Asphalt Debaters Presented by Basem Muallem (CT) - Tony Limas (Industry) April 19, 2005.
Uniform Paving Platform Regional Asphalt Seminar, Blacksburg, VA March 12, 2015 David P. Shiells, P.E. District Materials Engineer.
Bituminous Street Recertification Initiatives. Initiative Items n Stone Matrix Asphalt (SMA) n Longitudinal Joint Spec and other methods for longitudinal.
WMA TWG December NCAT WMA Research 2007 Andrea Kvasnak.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
Drum Plants Construction1 HMA Production Senior/Graduate HMA Course.
Asphalt Rubber Related Specifications Arizona Department of Transportation.
Intelligent Compaction Research & Development and QA Activities Richard B. Duval, P.E. Construction Research Engineer Infrastructure Research & Development.
1 Overview CQC Asphalt Specifications.  Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency. 
Recycling and Reclamation of Airfield Pavements 35 th Airports Conference FAA Eastern Region, Hershey, PA April 4, 2012 Campbell & Paris Engineers, 35.
Reclaimed Asphalt Pavements “RAP” Pete Coffman. RAP ◊Uses ◊Mix Methods ◊Cost Savings ◊Concerns ◊Case Studies ◊Uses ◊Mix Methods ◊Cost Savings ◊Concerns.
Characterization of Alaskan Hot-Mix Asphalt containing RAP
Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312 Date: March 4, 2009 Federal Aviation Administration.
Warm Mix for a Cold Climate Update on Colorado DOT’s 2007 WMA Project on I Rocky Mountain Asphalt Conference and Equipment Show.
Materials Specifications & Virginia Test Methods (VTM’s) 2014 Regional Asphalt Seminars Rob Crandol, P.E. Statewide Asphalt Program Manager.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Porous Asphalt The Specs Tim Horton, Skillings Connolly Jessica Knickerbocker, City of Tacoma Mark A. Palmer, P.E., LEED AP, City Engineer, City of Puyallup.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS. Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction.
AAPA 2010 Study Tour – Accelerated Pavement Testing & Equipment Observations and Recommendations Accelerated Pavement Testing & Equipment.
Materials Specifications & Special Provision Changes 2015 Regional Asphalt Seminars Rob Crandol, P.E. Assistant State Materials Engineer.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
Session #3 Asphalt 103- Materials: Basics of RAP, Usage and Specifications.
Development of An Advance Overlay Design System Incorporating Both Rutting and Reflection Cracking Requirements Rick Collins TxDOT.
Paving the way for over 60 years Presentation at the January 10, 2007 NCAUPG Technical Conference By Dusty Ordorff Bituminous Roadways, Inc.
3 - 1 Holding The Contractor to 105% of the Target Spread Rate!
STH 21 Adams County Project # Project Specifics Project Specifics Asphaltic Pavement Milling Asphaltic Pavement Milling Pulverizing Shoulders.
LLP HMA Reclaimed Asphalt Pavement ( RAP) Pre-Bid Meeting District 4 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement Division.
AMERICA RIDES ON US HMA ECONOMICS 101 Minimizing Project Costs without Sacrificing Quality Purdue Road School March 09, 2011 M. Dudley Bonte PE Regional.
An Overview of the Asphalt Mixture Performance Tester.
Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Federal Aviation Administration RPA P2: National Airport Pavement & Materials Research.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Alabama Asphalt Pavement Association
Update on the current APT Project in Texas
Asphalt Pavement Training Conference “HMA Mix Designs on the QPL”
Indiana Experience with Water Injected Foaming Device Rick Flint
David P. Shiells, P.E. District Materials Engineer
Thin Hot Mix Asphalt Overlays PennDOT Research Findings
Disk-Shape Compact Tension (DCT) of HMA Samples
Rongzong Wu, David Jones and John T. Harvey
Research Implementation WHRP Flexible Group
Presenters: Sumon Roy1 and Badrul Ahsan1
Update on the current APT Project in Texas
Construction Management
PAVEMENTS CEE 320 Steve Muench.
Performance Assessment of 100% Recycled Hot Mix Asphalt
Considerations FOR more durable hma pavements
Dr. Randy West, P.E. Director / Research Professor
Effect of Recovered Binder From Recycled Shingles
AASHTOWare Pavement-ME Design Software: Materials Library
Pavement Structural Analysis
2019 Pavement Workshop May 21-23, 2019
Superpave5 Superpave Design at Five Percent Air Voids
NRRA Mix Rejuvenator Field Sections
Presentation transcript:

Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer

Caltrans Contract Solano Project 04-4A0104 Solano Project 04-4A0104

Pavement Cross Section

Structural Sections

Overview Special Requirements Project LLP Mix Designs Construction Successes

Special Requirements This project includes special testing requirements for the mix design of HMA See section , "Hot Mix Asphalt (Long Life)" of the Special Provisions for the special testing requirements. This testing will take significantly longer than the testing specified in Section , "Hot Mix Asphalt Mix Design Requirements," of the Standard Specifications.

Special Requirements , "Hot Mix Asphalt (Long Life)“ , "Hot Mix Asphalt (Long Life)“ –Prepaving conference shall be held no more that 30 days following approval of the contract. –Review special provisions for those required to attend. –If a party cannot attend this mandatory meeting at the time scheduled, the meeting will be delayed until such time as all parties can be present, or the meeting will be repeated with all parties present.

Solano Project 04-4A0104 Solano Project 04-4A0104 Specification Section “Hot Mix Asphalt (Long Life)” Required Mix Designs –HMA (15% Max RAP, Long Life) PG 64-28PM –HMA (25% RAP, Long Life) PG You may request in writing to the Engineer to use a “softer” PG binder to meet the Performance requirementsYou may request in writing to the Engineer to use a “softer” PG binder to meet the Performance requirements *HMA mixes must meet permanent deformation, fatigue, stiffness, and Hamburg wheel tracking test requirements.*HMA mixes must meet permanent deformation, fatigue, stiffness, and Hamburg wheel tracking test requirements. *HMA aggregates must be treated with Lime (Marination)

LLP Structural Section Solano Project (Main line) 0.2’ HMA (15% Max. RAP Long Life) (PG 64-28PM) 0.25’ HMA (25% RAP Long Life) (PG 64-10) HMA (leveling course) (PG 64-10) 2 LLP Mix Designs!!! NTS Existing Cracked & Seated PCC or HMA GPI*   * GeoSynthetic Pavement Interlayer / Fabric 0.1’ HMA –O

Long Life Pavement Projects Quantity of Materials Per Mix Design Caltrans Project Typical Long Life Preliminary Mix Design (includes CT 371) 5 gal binder ~500 lb aggregate 5 gal binder ~500 lb aggregate Performance Testing (includes specimen fabrication) 10 gal binder ~ 1,200 lb aggregate Shear Fatigue Hamburg

Long Life Pavement Projects Estimated Time Per Mix Design Caltrans Project Typical Long Life Preliminary Mix Design (includes CT 371) 3 weeks Performance Testing (includes specimen fabrication) Shear ~ 3 weeks Fatigue ~ 6 weeks Hamburg ~ 1 week

LLP Mix Design Process Make every effort to insure that consistent and uniform virgin aggregates are available for use on entire project. Collect sufficient aggregates, virgin and RAP, during mix design process for mix design testing. Allow a minimum of 3 weeks for each HMA preliminary mix design. Allow a minimum of 10 to 12 weeks per mix design for performance testing.

HMA Performance Testing Performance tests required for this project are very different from the usual HMA tests. Few labs in the nation can perform these tests.

HMA Performance Testing Three labs listed in the Special Provisions can perform HMA performance tests for this project: –University of California Pavement Research Center (UC-PRC), Richmond, CA –Advanced Asphalt Technologies (AAT), Sterling, VA –The Asphalt Institute, Lexington, KY

Construction of LLP HMA Binder content range during production Job Mix Formula Target Value ±0.3%. Compaction of LLP HMA during production to 94% - 97% of Maximum Theoretical Density (Gmm). Consistency, Consistency, Consistency

Successes on Previous LLP Sufficient Number of Quality Control Staff –Timely test data are essential. –Qualified personnel that understand field operations and can quickly interpret laboratory test data.

Successes on Previous LLP Staging and Contingency Plans Establishing a good working platform on which to pave.

Successes on Previous LLP Effective Communication These projects are a true Partnership between the Contractor and Caltrans.