Office of Naval Research

Slides:



Advertisements
Similar presentations
( , RF/RFID Technology & Commercialization Forum Technology Service Corporation Jitti Sukontasup ( ,
Advertisements

Flexible Airborne Architecture
Open Architecture: A Small Business Perspective Defense Daily Open Architecture Summit November 2011 Thomas Conrad.
Confidential Property of Rite-Solutions, Inc. Copyright © 2010, Rite-Solutions, Inc. Rite-Solutions, Inc. Company Overview 2011.
A Short History of USW Open Architecture and Small Business Perspectives on The Open Business Model Mr. Howard Reichel
Panel 5: The Latest in OA Innovation and C4ISR 4 November, 2014 Mike Rice President / Senior Systems Engineer R2E Inc.
ARINC Overview Alliance Baltimore November 16, 2007.
1 The NIAG - “Supporting Alliance Capability Development and Enhancing Interoperability” AFCEA Europe – June 2010 “Interoperability Revisited” “NATO Industrial.
Distribution Statement A:: Approved for Public Release. Distribution is Unlimited Panel: The Power of Modularity and New Open Business Models Dr. Megan.
Managing Change Through Partnership P FARNBOROUGH Responding to the U.S. Coast Guard’s Deepwater Needs.
INFORMATION SYSTEMS & GLOBAL SERVICES Craig Solem, CISSP Lockheed Martin Information Systems and Global Services Program Manager, Joint Medical information.
Distribution Statement A: Approved for Public Release; Distribution is unlimited. 1 Electronic Warfare Information Operations 29 MAR 2011 Val O’Brien.
DoD CIO Brief to FCC-NTIA Model City Workshop
RADM Nevin P. Carr, Chief of Naval Research Open Architecture 18 Nov 2010.
Achieving Affordable, Capable Systems through Open Architecture Dr. Adam Razavian Deputy Major Program Manager Above Water Sensors Directorate PEO IWS2.0.
Unlocking Potential 1 Understanding the Open Business Model The value proposition for the government – Learning from industry DISTRIBUTION STATEMENT A.
Tadiran Electronic System A member of the Elisra Group Operates as a system House for: Intelligence & EW systems (Electronic Warfare) Spectrum Management.
Federal Student Aid Technical Architecture Initiatives Sandy England
Copyright © 2011 Raytheon Company. All rights reserved Customer Success Is Our Mission is a registered trademark of Raytheon Company. Statement A: Approved.
Open Architecture Summit
Defence spectrum use Changing technologies and applications CAPT Paul Scott, RAN Chief Information Officer Group Department of Defence.
Intel ® Research mote Ralph Kling Intel Corporation Research Santa Clara, CA.
Nickolas Guertin, PE DASN RDT&E, Director for Transformation
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Confidential 1 MAP Value Proposition.
©2003–2008 Check Point Software Technologies Ltd. All rights reserved. CheckPoint new security architecture and R70 highlights.
C4ISR via OA Mike Danjczek November, 2014 Copyright GTS 2014.
John Gruetzmacher, Lockheed Martin
NOVEMBER SHIPBUILDING AND SHIP PROCUREMENT FOR THE SPANISH NAVY BRIEFING FOR: SCHOOL OF POLICY STUDIES QUEEN'S UNIVERSITY BRIEFING FOR: SCHOOL OF.
MPF(F) R&D MPF(F) Cargo Operations R&D Joint Seabased Theatre Access Workshop February Duck, NC Authors: Martin Fink, Arthur Rausch,
. Traffic Flow Management System Benefits Flexibility for Future Growth: TFMS provides a modern software architecture to meet future growth and support.
Naval Open Architecture Military Aviation Architecture Conference
Future Airborne Capability Environment (FACE)
R&D In Navy Phased Array Radar Dr. Michael A. Pollock Office of Naval Research, ONR 312 Surface and Aerospace Surveillance National Symposium on Multi-function.
Strategies for Innovation Sourcing 30 August 2007 Paul McGowan Center for Innovative Technology Herndon, VA / Strategies.
Chemical & Biological Defense Program Science & Technology
Panel Three - Small Businesses: Sustaining and Growing a Market Presence Open Interfaces and Market Penetration Protecting Intellectual Innovation and.
1 A Perspective on New Maritime Strategy in the Current Environment John O’Neill.
Radar Open Systems Architectures
1 Click to edit Master title style ROCKWELL COLLINS STEP VISION Jack R. Harris Director, Advanced Manufacturing Technology Rockwell Collins
From the Installation and Certification Group to the Engineering and Development Section Patrick Grenard Chief, Engineering & Development, IMS Vienna International.
E-TechServices's IT Strategy Open. Virtualize. Rationalize. A Strategy for Optimal IT Deployment.
1 Microsoft Project Solution Offerings and the next chapter of EPM September 17th, 2003 Brendan Giles, PMP Systemgroup Management Services.
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
1 UWDO Overview – NUWC WAK – 12/14/01 Simulation Based Design (SBD) Vision The SBD VISION: Develop, manufacture, deploy, and operate weapons “in the computer”
EGovOS Panel Discussion CIO Council Architecture & Infrastructure Committee Subcommittee Co-Chairs March 15, 2004.
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
1 V&V Needs for NextGen of 2025 and Beyond A JPDO Perspective Maureen Keegan JPDO Integration Manager October 13, 2010.
DoD’s Target Control System “Developing a Corporate Strategy” Dennis Mischel Target Management Initiative Program Manager Director, Operational Test &
Marv Adams Chief Information Officer November 29, 2001.
C4ISR for the Military: Development and Implementation Presentation to the Security Network’s C4ISR, Robot Platforms, and Sensor Conference Greg Collins,
12/26/2015 IPK, NTNU 1 RFID case 1: RFID and VCV (Value Chain Visibility) in Airbus Business Prof. Kesheng Wang Knowledge Discovery Laboratory (KDL) Department.
Future of Mobility and Data Technologies for Land Systems Integration Mr. Matt Meltzer Vehicle System of Systems (SoS) Integration Supervisor Statement.
AFLCMC… Providing the Warfighter’s Edge SOSA Industry Day: Working Agendas August 4, 2015.
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
SmallSat Ground Systems, a C2 to RF Integrated Approach.
ILink Systems, Inc Feb, 2014 Government IT Solutions.
17 November 2003 This document is confidential and is intended solely for the use and information of the Australian Rail Track Corporation. PRESENTATION.
Advancing National Wireless Capability Date: March 22, 2016 Wireless Test Bed & Wireless National User Facility Paul Titus Department Manager, Communications.
Making Choice Possible in the Acquisition of Machinery Control Systems Program Executive Office Integrated Warfare Systems (PEO IWS)
Surveillance and Security Systems Cyber Security Integration.
An Iterative Method For System Integration
Open Systems Architecture / Data Rights Key Implementers
Presentation Title September 9, 2018
Intelligent Automation, Inc.
Pertemuan 22 Materi : Buku Wajib & Sumber Materi :
Bringing Large Commercial Airport Capabilities to Your Local Community
Engineering Autonomy Mr. Robert Gold Director, Engineering Enterprise
JOINED AT THE HIP: DEVSECOPS AND CLOUD-BASED ASSETS
Managed Content Services
EW Technology Transition
Presentation transcript:

Office of Naval Research ONR Programs Embracing the Modular Open System Approach (MOSA) for Military Aviation Architecture Conference Lexington Park, MD 21 September, 2010 Betsy B. DeLong Office of Naval Research 703-588-0069 betsy.delong@navy.mil

OUTLINE Overview of Integrated Topside (InTop) Program InTop heritage – The Advanced Multi-Function RF- Concept (AMRF-C) Program Multi-Function Electronic Warfare (MFEW) Program Navy/Industry InTop Open Architecture Study Group – organization and study results Digital Array Radar (DAR) Conclusions

WHAT IS INTEGRATED TOPSIDE ? Open Architecture Multi-function apertures simultaneous beams simultaneous functions Scalable Systems Dominate the RF spectrum Dynamic management of RF spectrum Control Electro Magnetic Interference (EMI) and increase RF availability More capability per ship through optimized aperture placement and space/weight/power improvements Software defined functionality Enable innovation through a RF Open Architecture Broader industrial base for government and prime contractors Modular open RF design (apertures and electronics) to facilitate best of breed technology and cost effective upgrades Continuous improvement in capability through software and hardware spirals Create affordable systems that are scalable across platforms Scalable architecture to meet multiple platform needs Common maintenance, training, and logistics pipelines across platforms with attendant reduced manpower vs. numerous stove-piped program Operation & Support costs

Low Band Comms Consolidated & IO Consolidated SatCom for INTOP PROTOTYPES FLEXAR Multi-channel Digital Array Radar Multibeam EW/IO/Comms MFEW ADM (complete) Low Band Comms Consolidated & IO Consolidated SatCom for Submarines and Ships Primary functions: All (ex. UHF) SatCom 4 to 8+ Simul. Links Secondary Functions: IO / EW Support LOS Comm Augment Primary functions: S-Band Radar Volume Search Precision Track Missile Data Link Air Traffic Control Precision Landing In-Band ES/EA/EP Secondary Functions: Weather Surveillance Navigation IO/EW Support Primary functions: X thru Ku band EA EA Support (Rx) Hawklink (TCDL) LOS Network Links SEI/ES Support Secondary Functions: SATCOM Augment Prec. Landing Link IO Support Primary functions: HPOI Acq/PDF ES ASMD Sit. Awareness SEI Support Secondary Functions: EA Support IO Support Primary functions: HF Comm VHF Comm UHF Comm IO Combat DF SSEE Secondary Functions: Other Omni Comm AIS JTIDS OTH Radar (Rx) SW Radar

THE ADVANCED MULTIFUNCTION RF CONCEPT (AMRFC) ONR initiated AMRF-C to determine the possibility of using wide-band arrays to meet multiple RF functions simultaneously ONR used an open architecture approach to RF systems to allow multiple vendors to participate and pave the way for scalable, upgradable systems The Multi Function Electronic Warfare Future Naval Capability (MFEW FNC) resulted from this effort Demonstrated Functions Comm: X-Band DSCS Satcom Link, Ku-Band Commercial Satcom Link, Ku TCDL Navigation Radar Electronic Warfare: Electronic Surveillance, Electronic Attack Calibration

MFEW DEVELOPMENT GOALS Meets key Electronic Surveillance capabilities: High Probability of Intercept (HPIO), Precision Direction Finding (PDF) and Specific Emitter Identification (SEI) Capable of supporting additional RF functions Supports other platform configurations, including back-fit Technology transitions to fleet Architecture that is modular, scalable and open RIMPAC 08 onboard USS Comstock MFEW

MFEW BLOCK DIAGRAM

MFEW MOSA SELF ASSESSMENT

ONE SYSTEM – MODULAR, SCALABLE MF (EA) Unique application / installation (1-5) ES SA PDF SEI (5-30) Future combatants passive sensors DDG-1000, etc. $ Back fit SLQ-32 replacement DDG, CG, etc. (100-200) Future SLQ-32 V2 replacement Deep Water National Security Cutter (5-10) SA MDF RWR (30-50) Small ship self protection LCS, Deep Water OPC & FRC 1

OPEN ARCHITECTURE SUCCESS Separate contract let to DRS to develop a RFC SRU that met the open interfaces of the Northrop Grumman (NG) MFEW ADM architecture DRS developed the SI-9161 RFC in parallel with their SI-9155 enabling ONR to leverage DRS investment in the SI-9155 for the NGC compatible SI-9161 The lessons learned on one configuration was leveraged to both the Si-9161 development efforts, collaboration with ONR and NG was very valuable to the success of the SI-9155 The modular and forward thinking design of the two receivers enables the features between the SI-9161 and SI-9155 to effectively be interchangeable The DRS RFC was used by Lockheed Martin (LM) during their RIMPAC testing LM was able to integrate the SI-9161 in their ES architecture within a week LM proposed the SI-9161 as part of SEWIP Block 2 LM is also using the SI-9161 SEWIP Block 1B HGHS

INDUSTRY SUPPORT Ensure broad industry involvement in open architecture and standards development Visits to and from industry NDIA workshops (Industry and Navy participation) Approximately 20 companies/40-50 individuals 8 November 2006 – Overview and feedback on IT INP 2 May 2007 - Business case 28 June 2007 – Requirements and architecture 2 August 2007 - Organization to define standards Integrated Topside INP RFI responses received Initiated industry co-led modular open RF architecture definition process in FY08

NAVY/INDUSTRY INTOP OA STUDY

GENERIC INTOP BLOCK DIAGRAM

NOTIONAL APERTURE SUBSYSTEM BLOCK DIAGRAM

GENERIC APERTURE BLOCK DIAGRAM

ANTENNA SUBSYSTEM MODULAR MECHANICAL ARCHITECTURE

CHALLENGES, RISKS AND IMPLICATIONS Confirmation that SRU/CSCI interfaces and specifications are accurate and sufficient for acquisition from alternate sources Navy must provide protection of contractor intellectual property even as it demands compliance with MOSA The price for lower total life cycle cost could mean higher initial acquisition cost Standards selection can be risky and problematic requiring greater knowledge on part of the government Interface standards evolve with time. Difficult to project the extent a given standard will endure or should be replaced Standards-based architectures tend to change the focus of systems engineering from design to integration Shorter commercial product lifetimes create logistical support challenges

potential operational performance benefits of oa based topside systems The ability to adapt to evolving requirements and threats Accelerating the transition from S&T into acquisition and deployment (make technology refresh an asset, not a liability) Ensuring that the system will interoperate with all the systems with which it must interface without major modification of exiting components Improving the extensibility for meeting new requirements and for introducing new capabilities

DIGITAL ARRAY RADAR PREMISE/GOALS ONR’s government owned and integrated Open Architecture Digital Array Radar sunsets in FY12 Open Architecture test bed enables investigation of alternative solutions and risk reduction Core government team with competency to design, build, and test next generation multi-mission radars (similar to SPQ-9, SPS-49, and APS-137 programs of the past) Improves government ability to trade requirements throughout the development cycle Competition at the subsystem level (vice TSPR) widens the pool of vendors able to compete Constrain contractor costs by evaporation of sole source Government develops and owns requirements and specifications Government competitively selects subsystem vendors The government has no business model impediments to the extensive adoption of relevant open commercial standards and specifications

OA RADAR SPECIFICATION (OARS)

CONCLUSIONS ONR has a solid S&T foundation to support MOSA based systems of the future OA is a real enabler for making systems more affordable Leverage commercial investment; Enhance access to cutting edge technologies Enhance commonality and reuse across platforms Enable increased competition Industry is a willing partner and its involvement is essential in defining MOSA based architectures and standards “Specifying modular architecture and open software standards is essential to allow spiral development of optimal systems design - constant evolution in capabilities should be expected.” -JASONS Summer Study Report 2008